12 Trains from (BZY)BASAI to (BAB)BABINA
Address: Basai Station, Madhya Pradesh 473995, India
Station Code: BZY
Station Name: BASAI
Zone: NCR/North Central
Train Frequency Weekly: 67
Station Traffic: Medium
Address: Babina Railway Station, Babina, Uttar Pradesh 284401, India
Station Code: BAB
Station Name: BABINA
Zone: NCR/North Central
Train Frequency Weekly: 159
Station Traffic: High
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.ncr.indianrailways.gov.in- 2022-06-07
Shri Narendra Kumar conferred with "Employee of the Month Award" for the month of May General Manager awarded 05 railway staff of NCR for extraordinary commitment towards safety On 07.06.2022, General Manager, North Central Railway, Shri Pramod Kumar conferred awards to staff for their alertness and contribution towards safety in train operations in the presence of PHOD’s of North Central Railway. 05 Railway staff were conferred with Safety awards by the General Manager on the occassion. Awarded employees include Shri Jag Mohan Meena, Loco Pilot/Agra Cantonment/Agra Division, Shri Vidyasagar, ESM/Prayagraj, Prayagraj Division, Shri Manoj Sharma, Kantewala/Babina/Jhansi Division, Shri Urmilendra Vikram Tiwari, Pointsman/Sarsaul/Prayagraj Division, and Shri Narendra Kumar, Goods Guard/Prayagraj/Prayagraj Division. Shri Narendra Kumar, has been honored with the Employee of the month of May. Shri Narendra Kumar was on duty on the goods train on date 12.05.22. After passing the intermediate signal of Naini station, he stopped the train by applying pressure after experiencing a jerk and then he got down from the train and checked the track and detected the rail fracture. He has done commendable work towards his duty along with the safety of the railways. The General Manager expressed his gratitude to the entire family by sending a congratulatory message to the wife of Shri Narendra Kumar. 2
www.ncr.indianrailways.gov.in- 2022-04-04
North Central Railway completes significant doubling, tripling and quadrupling work in 2021-22Timely Infrastructure expansion is the key for ensuring good mobility and punctuality: GM NCR80.48% punctuality of coaching trains in NCR in 2021-22Year 2021-22 has been an year of achievements for NCR. Massive infrastructure expansion works have taken place and commissioned during the year. These include:51.2 km of doubling was carried out in 2021-22. Different sections of Kanpur- Virangana Lakshmibai route were opened in the year. Entire Kanpur-Virangana Lakshmibai section will be a double line section in 2022. Under this doubling project, Bhimsen to Paman doubling of 17 kilometer is expected to be completed in April itself. Tripling work of 29.35 km got completed which includes Virangana Lakshmibai to Babina and Naini to Prayagraj Chheoki sections of Jhansi and Prayagraj divisions respectively. In April itself Lalitpur to Bijrotha tripling of 28 km is also planned to be completed. The work is a part of Jhansi-Bina third line project.28.04 Km of quadrupling work between Chhata-Ajhai-Vrindavan-Bhuteshwear of Agra Division also got completed this year. With this, entire 80 km of Mathura-Palwal fourth line project got completed in 2021-22. In April 2022, fourth line between Bhaupur and Panki (10.245 km) of Prayagraj Division is planned to be commissioned. In addition to it, 18 new Foot over Bridges were constructed and 46 FOBs were rehabilitated during the year at different stations of NCR. Similarly, 08 new Road over Bridges (ROB) were commissioned and 46 new Road under Bridges (RUB) were completed in 2021-22. To facilitate passenger convenience, 08 stations over NCR were provided with the facility of Cover over Platforms and platform extension work was completed at 21 stations of NCR.With the expansion of infrastructure, mobility of NCR is also stepping up. It is due to the cumulative effect of both factors namely better operations planning and infrastructure expansion that punctuality of coaching trains in NCR has improved drastically in last few years. While punctuality of coaching trains in NCR was around 52 % in 2017-18, as a result of capacity enhancement, NCR punctuality clocked at 80.48%. This may be said as the best ever annual punctuality figure of NCR as although as per statistics punctuality was 86.92% in 2020-21 but considering the fact that COVID was at its peak and little trains were operated in 2020-21, punctuality figures of 2021-22 gives a true picture of improvement in train operations.GM NCR Shri Pramod Kumar says that until and unless structural bottlenecks are removed and capacity expansion done in correspondence with the rising demand, mobility cannot be improved. Thus it is important that field officers should work harder for timely execution and completion of infrastructure projects. Shri Kumar also said that it is the responsibility of officers to foresee and plan timely for future requirements.
COMMENTS
NO Comments. Be the first to Comment...
|