For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








20 Trains from (BALE)BALE to (PK)PAKNI


Address: Solapur Maharashtra

Station Code: BALE

Station Name: Bale

Zone: CR/Central

Train Frequency Weekly: 25

Station Traffic: Low

Address: SH 151, Pakni Maharashtra

Station Code: PK

Station Name: Pakni

Zone: CR/Central

Train Frequency Weekly: 25

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
57686BJP SUR PASSTKWD02:14SUR02:400:26M,TU,W,TH,F,SA,SUUNRESERVED57686 Status
56904DWR SUR PASSENGEHG02:55SUR03:300:35M,TU,W,TH,F,SA,SUSL,GN,56904 Status
57130HYB BJP PSGRTKWD06:05SUR07:301:25M,TU,W,TH,F,SA,SUSL,GN,57130 Status
22155SUR MRJ SFASTSUR07:05MO07:330:28M,TU,W,TH,F,SA,SU2S,GN,22155 Status
71413PUNE SUR PASSMVE07:10PK07:240:14M,TU,W,TH,F,SA,SUUNRESERVED71413 Status
71304GDG SUR PASSTKWD08:55SUR09:300:35M,TU,W,TH,F,SA,SUUNRESERVED71304 Status
71306WADI SUR PASSTKWD10:02SUR10:450:43M,TU,W,TH,F,SA,SUUNRESERVED71306 Status
71414SUR PUNE DMUSUR11:40PK12:000:20M,TU,W,TH,F,SA,SUUNRESERVED71414 Status
16535GOLGUMBAZ EXPHG12:15SUR12:400:25M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,16535 Status
57134RC BJP PASSTKWD13:00SUR14:001:00M,TU,W,TH,F,SA,SUUNRESERVED57134 Status
71415PUNE SUR DEMUMVE14:20PK14:390:19M,TU,W,TH,F,SA,SUUNRESERVED71415 Status
51030BJP BB FAST PASHG17:02SUR17:250:23M,TU,W,THSL,GN,51030 Status
11028MUMBAI MAILHG17:37SUR18:100:33M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11028 Status
21028MUMBAI MAILSUR18:20MO18:480:28M,TU,W,TH,F,SA,SUSL,GN,21028 Status
17308BASAVA EXPRESSHG18:32SUR19:150:43M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17308 Status
57628KLBG SUR PASSTKWD18:54SUR19:300:36M,TU,W,TH,F,SA,SUUNRESERVED57628 Status
56906UBL SUR PASSTKWD22:15SUR22:400:25M,TU,W,TH,F,SA,SUUNRESERVED56906 Status
12116SIDDHESWAR EXPSUR22:40MO23:060:26M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12116 Status
11424SOLAPUR EXPRESSHG22:42SUR23:150:33M,TU,W,TH,F,SA,SUUNRESERVED11424 Status
71416SUR PUNE PASSSUR23:00PK23:180:18M,TU,W,TH,F,SA,SUUNRESERVED71416 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
21-11-2022
Press Releae: MALDA DIVISION’S INITIATIVES FOR CLEAN & GREEN STATIONS

  3, कोयलाघाट स्ट्रीट, कोलकाता – 700001, 3, Koilaghat Street, Kolkata – 700001


MALDA DIVISION’S INITIATIVES FOR CLEAN & GREEN STATIONS


Kolkata, November 19, 2022


Plastic products have become an integral part in our daily life as a basic need. Plastic waste generation is a global scale problem and even our Railway premises are also affected by it. Plastic waste is non-biodegradable as it would remain unfazed for hundreds of years without any decay. The massive consumption of a wide range plastic products generated a huge amount of plastic waste. 

To curb the pollution caused due to increase in plastic waste, Eastern Railway’s Malda Division has launched a campaign - Plastic free premises of Malda Division under the dynamic and inspiring leadership of Shri Vikas Chaube, Divisional Railway Manager/Malda. He has taken an initiative to make the Railway premises free from plastic waste. 

As a part of this initiative, Plastic Bale Making Machine & Plastic Bottle Shredding Machine has been commissioned in Malda Coaching Depot. The collected garbage is segregated into bio-degradable and non-biodegradable waste and fed into the bale making machine. The Shredding Machine compressed it into a cubicle so that bulk of waste which is hard to carry can be transported easily for recycling. The prepared bale & Chips will be sold out to Plastic handler at fixed price. This whole endeavour is the first step towards corporealization of ER’s dream to provide passengers with a CLEAN & GREEN station with the best amenities and services and contribute to the SWACHH BHARAT vision. This initiative will not o­nly to keep the Railway premises clean and environment friendly but also generate non-fare revenue too.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search