|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
RECENT NEWS
1
www.er.indianrailways.gov.in- 2019-11-04
POWER & TRAFFIC BLOCK FOR CONSTRUCTION OF ROAD OVERBRIDGE Kolkata, November 04, 2019 For construction of road overbridge in lieu of road under bridge between Madhupur and Joramow stations in main line section of Asansol Division, three (3) hours Power & Traffic Block from 14:10 hrs. to 17:10 hrs. will be imposed on that section on 05.11.2019, 07.11.2019 & 09.11.2019. Consequently, following arrangements in train running have been made:- Rescheduling of trains ·13007 Howrah – Sri Ganganagar Udyan Abha Toofan Express will be rescheduled by 140 minutes from Howrah on the days of block. ·15233 Kolkata – Darbhanga Express will be rescheduled by 125 minutes from Kolkata on 07.11.2019. ·15235 Howrah – Darbhanga Express will be rescheduled by 125 minutes from Howrah on 09.11.2019. ·63568 Jhajha – Asansol MEMU passenger will be rescheduled by 150 minutes from Jhajha on the days of block. Besides, 22643 Ernakulam – Patna Express will be controlled enroute suitably between Adra & Asansol on 07.11.2019, 12369 Howrah – Haridwar Kumbha Express will be controlled suitably enroute on 07.11 & 09.11.2019, 12327 Howrah – Dehradun Upasana Express will be controlled suitably enroute on 05.11.2019, 11106 Jhansi – Kolkata Pratham Swatantrata Sangram Express will be controlled enroute suitably on 09.11.2019 and 73538 Jasidih – Andal passenger will be controlled suitably on the days of block. Inconvenience likely to be caused is deeply regretted. 2
www.er.indianrailways.gov.in- 2019-10-10
POWER & TRAFFIC BLOCK FOR CONSTRUCTION OF ROAD OVERBRIDGE BETWEEN CHITTARANJAN & JAMTARA STATIONS Kolkata, October 10, 2019: For lifting of girder in connection with the construction of Road Overbridge in lieu of Level Crossing Gate No. 7A/T between Chittaranjan and Jamtara stations, 03 (three) days Power & Traffic block will be imposed between those stations of Eastern Railway’s Asansol Division for 03 (three) hours (13:00 hrs. to 16:00 hrs.) daily on both Up and Down main line section on 12.10.2019, 15.10.2019 and 19.10.2019. Consequently, the following arrangement in train running have been made on those days (12.10.2019, 15.10.2019 and 19.10.2019). Rescheduling ·13007 Up Howrah-Shri Ganganagar Udyan Abha Toofan Express will be rescheduled by 120 minutes from Howrah on the days of blocks. ·18420 Jaynagar-Puri Express will be rescheduled by 120 minutes from Jaynagar on 12.10.2019 & 19.10.2019 Besides, 15235 Howrah-Dibrugarh Express, 13008 Shri Ganganagar-Howrah Udyan Abha Toofan Express, 17008 Dibrugarh-Secunderabad Express, 13332 Patna-Dhanbad Inter City Express, 11106 Jhansi Jn-Kolkata Pratham Swatantrata Sangram Express, 63568 Jhajha-Asansol MEMU Passenger and 73538 Jasidih-Andal Passenger will be suitably controlled enroute on different days of the block. Inconvenience likely to be caused is deeply regretted. |