For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

SAKLESHPUR

STATION INFO

Address: Sakleshpur Railway Station, Sakleshpur, Karnataka, India

Station Code: SKLR)SAKLESHPU

Station Name: SKLR)SAKLESHPUR

Zone: SWR/South Western

Total Unique Trains: 14

Train Frequency Weekly: 33

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
16511KANNUR EXP00:0500:1510W,TH,F,SA2A,3A,SL,GN
16513KARWAR EXP00:0500:1510W,TH,F,SA2A,3A,SL,GN
16512BANGALORE EXP01:1501:2510M,TU,W,SU2A,3A,SL,GN
16514BENGALURU EXP01:1501:2510M,TU,W,SU2A,3A,SL,GN
16518BANGALORE EXP01:1501:2510TH,F,SA2A,3A,SL,GN
16524BANGALORE EXP01:1501:2510TH,F,SA2A,3A,SL,GN
16517KANNUR EXP02:5003:0010M,TU,SU2A,3A,SL,GN
16523KARWAR EXP02:5003:0010M,TU,SU2A,3A,SL,GN
16515YPR KAWR EXPRES11:3511:4510M,W,FCC,2S,GN
16575GOMTESHWARA EXP11:3511:4510TU,TH,SUCC,2S,GN
16516KAWR YPR EXP15:3515:4510TU,TH,SACC,2S,GN
16576GOMTESHWARA EXP15:3515:4510M,W,FCC,2S,GN
16585YPR MAQ EXP21:0021:1515TU,TH,SU2A,3A,SL,GN
16586MAQ YPR EXP23:4023:5010M,W,F2A,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
Press Release No. 17904-06-2021
Hubballi
Press Release No. 179, SOUTH WESTERN RAILWAY COMPLETES SAFETY INSPECTIONS & WORKS; GEARS UP FOR UPCOMING MONSOON SEASON

                              दक्षिण पश्चिम रेलवे/ SOUTH WESTERN RAILWAY                                                           प्रेस विज्ञप्ति/ Press Release No. 179  Dt: 04.06.2021

SOUTH WESTERN RAILWAY COMPLETES SAFETY INSPECTIONS & WORKS; GEARS UP FOR UPCOMING MONSOON SEASON

SWR has carried out all safety-related inspections, and safety works in connection with the preparation for the upcoming monsoon season. This has been done to ensure that loss to Railway property, life and train services can be avoided. Special attention has been paid to Ghat sections in Hubballi (Castle Rock to Kulem) and Mysuru (Sakleshpur to Subrahmanya Road) which witness heavy to very heavy rainfall every monsoon.

All the vulnerable locations have been inspected by the section engineers concerned and precautionary measures have been put in place. Chief Bridge Engineer of SWR, Shri Ramesh Kambli has reviewed the monsoon preparedness in all the 3 Divisions.

ATTENTION TO TRACKS

1.  All Joints have been attended properly, drainage of water from the track area particularly in yards has been ensured to avoid any stagnation of water. All types of drains have been made with proper slopes and clear outlets so that rains may not affect the operation of trains.

2.  The identified vulnerable bridges and locations are provided with name boards at their approaches and arrangements are also made for posting of watchmen. The approaches of girder bridges have also been properly attended.

TRAINING & EDUCATION

1.  Monsoon Patrolling of vulnerable locations has been enhanced. All frontline staff and patrolling gangs have been alerted and sensitised to take all necessary precautions in anticipation of the heavy to very heavy rain. They are equipped with necessary tools and equipments to clear the tracks of obstructing materials. Key locations such as bridge approaches, level crossing approaches, pedestrian crossings have been attended to ensure proper track geometry. Trackmen, Station Staff and frontline staff have been trained and alerted for taking action o­n receiving weather warning messages, sudden storm and rain water level rising near bank or at bridges.

DISASTER MANAGEMENT

1.  Sagarkatte Station in Mysuru Division is equipped with Anemometer to monitor wind speeds. There are 13, 15 and 16 stations in Hubballi, Bengaluru and Mysuru Divisions respectively where rain gauges are installed to regularly monitor rainfall levels.

2.  Stock of boulders, ballast, sand bags, and quarry dust have kept ready in wagons and stabled near flood prone locations to arrest landslips, breaches, flooding etc (Castle Rock  - 15 wagons and Kulem - 15 wagons over Hubballi division; Sakleshpur – 25 wagons, Chitradurga – 15, Subrahmanya Road – 20 over Mysuru Division).

3.  Accident Relief Train & Accident Relief Medical Van are kept ready at all times with prescribed scale of engineering materials. Road vehicles, motor trolleys are kept in good condition for swift transport of relief materials and men to the site, when needed to ensure quick restoration of train services in the event of disruption.

4.  All track maintainers & frontline staff have been counseled to maintain social distancing, wear face masks and take precautions to prevent the spread of Covid-19 virus.

5.  The weather bulletins issued from the India Meteorological Department are being monitored and weather warnings are disseminated in a timely manner to Stations to alert Station Masters, Trackmen, and Engineering Electrical & Signal/Telecom maintenance staff.

Engineering Officials have inspected in detail and taken safety measures to prevent damage to train services, railway property and life. Instructions from Disaster Management plan conveyed to staff at all levels. Close coordination will be maintained with Meteorological Department regarding Monsoon/Weather Warning/Forecasts.


                                                                 Chief Public Relations Officer 

                                                                  South Western Railway, Hubballi





2
Press Release No. 4316-04-2021
Hubballi
Press Release No. 43, VACCINATION OF COVID – 19 CARRIED OUT IN BENGALURU, MYSURU AND HUBBALLI DIVISION OVER SOUTH WESTERN RAILWAY

                                दक्षिण पश्चिम रेलवे/ SOUTH WESTERN RAILWAY                                                         प्रेस विज्ञप्ति/ Press Release No. 43  Dt: 15.04.2021

VACCINATION OF COVID – 19 CARRIED OUT IN BENGALURU, MYSURU AND HUBBALLI DIVISION OVER SOUTH WESTERN RAILWAY

To tackle the Covid – 19 pandemic, as part of Tika Utsav or Vaccine Drive announced by Hon’ble PM Shri Narendra Modi, SWR has taken measures to identify and vaccinate eligible employees and dependents. As a part of the same, today Bengaluru Division, Mysuru and Hubballi Division of South Western Railway vaccinated the employees and their dependents against Covid -19.

In Bengaluru Division 234 employees and their dependents aged over 45 years get vaccinated against Covid -19 today.

Vaccinations have been carried out in Railway Hospital / Health Units Bengaluru - 80, Bengaluru Cantonment  – 12, Krishnarajpuram, Diesel Loco Shed – 55, Yesvantpur - 29, Yesvantpur, Mechanical Shed - 11, Bangarapet – 42 and Hindupur - 5 in co-ordination with state government.

46 Rapid antigen tests (RAT) were conducted for Covid - 19 detection at Yesvantpur  depot and all were found to be negative.

In Mysuru Division 535 employees and their dependents get vaccinated against Covid -19 today.  Vaccinations have been carried out in Railway Hospital / Health Units Mysuru – 110 (2nd dose - 31), Arsikere – 195, Sakleshpur – 140 and Harihar – 90.

In Hubballi Division 91 employees get vaccinated against Covid -19 today. Vaccinations have been carried out at Health Unit Gadag – 59 (2nd dose – 3), Bagalkot – 32. 


                                                                   Chief Public Relations Officer                                                                     South Western Railway, Hubballi








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search