For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

MAUR

STATION INFO

Address: Maur, Punjab 151509, India

Station Code: MAUR)MAU

Station Name: MAUR)MAUR

Zone: NR/Northern

Total Unique Trains: 18

Train Frequency Weekly: 109

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
12138PUNJAB MAIL00:1500:172M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
13008U A TOOFAN EXP00:3100:332M,TU,W,TH,F,SA,SU3A,SL,GN
13007U ABHATOOFAN EXP00:4300:441M,TU,W,TH,F,SA,SU3A,SL,GN
12137PUNJAB MAIL01:5001:522M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
15910AVADH ASSAM EXP02:2502:272M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
54045JIND FZR PASS06:4106:421M,TU,W,TH,F,SA,SUUNRESERVED
14626DEE INTERCITY06:5907:012M,TU,W,TH,F,SA,SU2A,3A,SL,GN
19024FZR MMCT JANTA07:3607:382M,TU,W,TH,F,SA,SUSL,GN
12482INTERCITY EXP08:3408:362M,TU,W,TH,F,SA,SU3A,CC,2S,GN
54044HSR JIND PASS10:4010:411M,TU,W,TH,F,SA,SUUNRESERVED
14625FZR INTERCITY10:5410:562M,TU,W,TH,F,SA,SU2A,3A,SL,GN
54641DLI FZR PASS14:1114:121M,TU,W,TH,F,SA,SUUNRESERVED
54642FZR DLI PASS15:0015:011M,TU,W,TH,F,SA,SUUNRESERVED
12481INTERCITY EXP17:1617:182M,TU,W,TH,F,SA,SU3A,CC,2S,GN
54046FZR JIND PASS18:1218:142M,TU,W,TH,F,SA,SUUNRESERVED
19023FZR JANATA EXP18:3618:382M,TU,W,TH,F,SA,SUSL,2S,GN
54043JIND HSR PASS19:2519:261M,TU,W,TH,F,SA,SUUNRESERVED
15909ABADH ASSAM EXP21:2721:292M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
09-10-2021
PRESS RELEASE: THE SINCERITY AND ALERTNESS OF AN RPF CONSTABLE SAVED THE LIFE OF A PASSENGER

  

THE SINCERITY AND ALERTNESS OF AN RPF CONSTABLE SAVED THE LIFE OF A PASSENGER

 

Kolkata, October 6, 2021:

 

On 04.10.2021 at about 16:15 hrs., during departure of 02665 UP Howrah-Kanyakumari Superfast Express Special from PF No. 23 at Howrah station, o­ne passenger was trying to board the coach while the train was moving. During the process of boarding, he fell down o­n the foot board of the running train and got dragged at the platform and was likely to fall in between the gap of train and platform.

Seeing it, o­n duty RPF Special Force staff Shri Omprakash Maurya ran for rescuing him and saved his life by pulling him out.

The RPF Constable has done a commendable job in saving the life of a passenger from imminent danger observing due care and caution.

 






2
12-07-2021
General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

उत्‍तर मध्‍य रेलवे

 जनसम्‍पर्क कार्यालय

                     उत्‍तरमध्‍य रेलवेप्रयागराज

पत्रांक: 11पीआर/07/2021                                               प्रेस विज्ञप्ति                                                 दिनांक: 09.07.2021

General Manager North Central Railway and North Eastern Railway inspected Bhimsen-Jhansi, Jhansi-Lalitpur and Lalitpur-Khajuraho sections.

Shri V K Tripathi, General Manager North Central Railway and North Eastern Railway during his two days visit to Jhansi Division started his inspection from Bhimsen station of Bhimsen-Jhansi section. Shri Tripathi reviewed the layout plan of the proposed Logistic Park at Bhimsen station. He also inspected and discussed the connectivity of the logistics park with upcoming Dedicated Freight Corridor (DFC). Apart from this, there was a detailed discussion about  systematic development at Bhimsen station. After departing from Bhimsen station, the GM inspected Malasa-Pukhrayan-Chaunrah- Kalpi-Usargaon section and Parauna- Erich Road-Moth-Nandkhas sections. He inspected the progress of doubling work of section through rear window of inspection carriage.

After reaching Jhansi, Shri Tripathi along with the Divisional Railway Manager Shri Sandeep Mathur reviewed the o­ngoing projects of Jhansi Division. He expressed satisfaction over the progress of o­ngoing passenger amenities works,. After the meeting, General Manager met with the office bearers of the union and association and discussed various important issues for the welfare of the employees.

General Manager also met the media persons of Jhansi Division and briefed them regarding progress of works related to passenger facilities. He informed the media that the doubling work of Jhansi-Kanpur railway section would be completed by June 2022. He also shared the good news of sanctioning the work of construction of ROB at level crossing gate number 117 (on Jhansi-Gwalior road route).

After that, Shri Tripathi left for the window trailing inspection of Jhansi-Lalitpur section as per his schedule. After reaching Lalitpur station, he took stock of the o­ngoing projects and saw the works related to the third line. He inspected the passenger facilities. Later he reached Khajuraho station.

It is to be informed that  Window-trailing inspection is a specialized inspection in the Indian Railways in which the track and its surrounding installations like signals, OHE, platforms etc are inspected from the rear window of an inspection car attached to a moving train. During the inspection, important parameters like cleanliness and overall condition of stations falling en-route, riding quality of the train-especially o­n points and crossings, improvement in Track Geometry Index (TGI), , OHE status, Jhansi-Kanpur doubling and Jhansi-Lalitpur third line construction and electrification work, Condition of level crossing gates en-route etc were observed by the General Manager/North Central Railway. During the inspection, General Manager directed the Divisional Railway Manager, Jhansi that

• Scrap lying along the tracks  should be removed.

• Action should be taken against the trace passers by identifying the locations of  trace passing.

• Improved level of maintenance of switch expansion joints, points, crossings and yards to be ascertained to improve riding quality and safety.

During the window trailing inspection, Shri Dinesh Verma, Additional Divisional Railway Manager (Operations), Shri Amit Sengar, Additional Divisional Railway Manager (Technical), Shri Deepak Nigam, Chief Workshop Manager (CMLR) and Shri R D Maurya, Chief Workshop Manager (Wagon Repair Workshop) along with and other senior officers of the division were present.                                                                                                                          








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search