For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








10 Trains from (pc)pachora jn to (ABY)Ambivli


Address: Pachora, Maharashtra 424201, India

Station Code: PC

Station Name: PACHORA JN

Zone: CR/Central

Train Frequency Weekly: 178

Station Traffic: High

Address: Titwala - Ambivili Rd, Ambivli Maharashtra

Station Code: ABY

Station Name: Ambivli

Zone: CR/Central

Train Frequency Weekly: 13

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
11025BSL PUNE EXPPC01:26KYN07:576:31M,TU,W,TH,F,SA,SUCC,SL,2S,GN,11025 Status
12140SEVAGRAM EXPPC04:55KYN10:225:27M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12140 Status
51196BPQ WR PASSPC04:55KYN10:225:27M,TU,W,TH,F,SA,SU3A,SL,GN,51196 Status
11094MAHANAGARI EXPPC07:10KYN12:555:45M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11094 Status
51154BSL CSTM PASSNGD09:00ABY17:398:39M,TU,W,TH,F,SA,SUUNRESERVED51154 Status
15018GKP LTT EXPPC11:20KYN17:075:47M,TU,W,TH,F,SA,SU2A,3A,SL,GN,15018 Status
11072KAMAYANI EXPRESPC15:43KYN21:425:59M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11072 Status
11058ASR CSTM EXPPC19:55KYN02:426:47M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11058 Status
11016KUSHINAGAR EXPPC20:18KYN03:126:54M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11016 Status
18030SHM LTT EXPRESSPC21:45KYN03:456:00M,TU,W,TH,F,SA,SU2A,3A,SL,GN,18030 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
2023/04/1813-04-2023
Special Traffic and Power Block on 15/16.04.2023 (Sat/Sun midnight)


Special Traffic and Power Block o­n 15/16.04.2023 (Sat/Sun midnight)

Special Traffic and Power Block :

Central Railway will operate special traffic and power block o­n all three lines for shifted open web girders for Dedicated Freight Corridor Corporation India Ltd bridge between Kopar and Thakurli stations o­n 15/16.4.2023 (Sat/Sun mid-night) from 01.30 hrs to 04.00 hrs.

Shadow Blocks:

Central Railway will also operate Shadow blocks between Ambivli and Asangaon
• Launching of girders for Road Over Bridge at Titwala Up / EMU sidings from 01.15 to 03.30 hrs and o­n Down line from 02.00 hrs to 03.30 hrs.
• Site acceptance test for modification of Electronic Interlocking (Dual Visual Display at Vasind) from Khadavli to Asangaon o­n Up / Down lines from 02.10 hrs to 03.40 hrs.

Due to this the train running pattern will be as under:-

Suburban

• Last Local towards Karjat before the block: A 67 Ambarnath local leaving CSMT at 23.51 hrs.
• Last Local towards Kasara before the block: N 1 Kasara local leaving CSMT at 00.14 hrs.
• First Local towards CSMT after the block: A 4  CSMT local leaving Ambernath at 04.08 hrs.
• First Local towards CSMT after the block: TL 2 CSMT local leaving Titwala at 03.56 hrs.

Regulation of Up trains

• 18030 Shalimar-LTT express will be regulated at Asangaon station from 02.37 hrs to 04.30 hrs and will arrive destination 1 hour later than its scheduled time.
• 12810 Howrah-CSMT express will be regulated at Atgaon station from 02.38 hrs to 03.35 hrs and will arrive destination 1 hour later than its scheduled time.
• 20104 Gorakhpur-LTT express will be regulated at Khardi station from 02.55 hrs to 03.30 hrs and will arrive destination 45 minutes later than its scheduled time.
• 11402 Adilabad-CSMT express and 12152 Shalimar-LTT express will arrive destination 15 to 20 minutes later than its scheduled time.

Following Up trains will be diverted via Karjat-Panvel-Diva route
 
• 11020 Bhubaneswar-CSMT express
• 18519 Vishakapatnam-LTT express
• 12702 Hyderabad-CSMT express

Passengers are requested to bear with the Railway Administration for the inconvenience caused due to these infrastructure blocks.
--- ----
Date: April 13, 2023
PR No.2023/04/18
This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai
--------------------------




(Shivaji Sutar)
Chief Public Relations Officer





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit