For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








11 Trains from (LD)LONDA JN to (CLR)CASTLE ROCK


Address: Londa Junction, Londa, Karnataka 591301, India

Station Code: LD

Station Name: LONDA JN

Zone: SWR/South Western

Train Frequency Weekly: 185

Station Traffic: High

Address: Castlerock Railway Station, Castlerock, Karnataka 581121, India

Station Code: CLR

Station Name: CASTLE ROCK

Zone: SWR/South Western

Train Frequency Weekly: 61

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
17021HYB VSG EXPRESSLD01:35QLM04:102:35TH2A,3A,SL,GN,17021 Status
17309YPR VASCO EXPLD01:35QLM04:102:35TU,SU2A,3A,SL,GN,17309 Status
17316VLNK VSG EXPLD01:35QLM04:102:35TU2A,3A,SL,GN,17316 Status
17419TPTY VSG EXPLD01:35QLM04:102:35TH2A,3A,SL,GN,17419 Status
06948UBL VSG LINK EXPLD02:15QLM04:352:20M,TU,W,TH,F,SA,SU3A,SL,GN,06948 Status
12780GOA EXPRESSLD03:45QLM04:350:50M,TU,W,TH,F,SA,SU2A,3A,SL,GN,12780 Status
17311MAS VASCO EXPLD08:40QLM11:002:20F2A,3A,SL,GN,17311 Status
17603KCG VSG EXPLD10:40QLM12:552:15M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,17603 Status
18047AMARAVATHI EXPLD10:40QLM12:552:15M,TU,TH,SA2A,3A,SL,GN,18047 Status
11097POORNA EXPRESSLD12:15QLM14:252:10SA2A,3A,SL,GN,11097 Status
51405MRJ CLR PASSLD22:20TGT22:440:24M,TU,W,TH,F,SA,SUUNRESERVED51405 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
Press Release No. 12109-06-2023
Hubballi
Press Release No. 121, MONSOON PREPAREDNESS OF SOUTH WESTERN RAILWAY

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 121 Dt: 09.06.2023

MONSOON PREPAREDNESS OF SOUTH WESTERN RAILWAY

SWR has diligently conducted comprehensive safety inspections and implemented necessary safety measures in anticipation of the forthcoming monsoon season. These proactive measures aim to prevent any harm to railway property, ensure passenger safety, and maintain uninterrupted train services. Special emphasis has been placed o­n the Ghat sections such as Sakleshpur - Subrahmanya Road in Mysuru division and Castle Rock - Kulem in Hubballi division. SWR remains committed to safeguarding the railway infrastructure and the well-being of its passengers during adverse weather conditions.

Weather Warning System:

Arrangements are in place to receive timely weather warning alerts from Indian Meteorological Department. These warnings encompass heavy rainfall and cyclone forecasts. o­n receiving the warning from IMD, the zonal central control office of SWR promptly coveys’ the same to filed units and stations 

Pre-monsoon Patrolling:

Each and every existing vulnerable location o­n the Divisions has been critically reviewed and inspected by the section engineers concerned and watchmen/patrolmen have been deputed at each such location. Efforts have been made to eliminate muck or garbage from the drainage system in track areas, especially in yards, to prevent water stagnation. All drains have been made with appropriate slopes with unobstructed outlets, ensuring that train operations remain unaffected during rainfall.

Joint inspections of electrified areas by officials have been carried out to identify trees, which during monsoon may cause damage to Overhead equipment (OHE), signals, track or any other railway installations and may obstruct traffic.  Such trees have been chopped/trimmed off for the safety of track.

Monsoon Reserve:

·The reserved stocks of boulders o­n designated bridges/locations are checked and shortfall made good.  Such monsoon reserves are available at Castle Rock, Kulem, Tinaighat, Sakleshpur, Subrahmanya Road and Chitradurga. Earthmoving equipment (Hitachi, JCB) are also available o­n standby condition at critical locations.

·The stock of boulders, ballast, sandbags etc. is loaded into total of 90 wagons and stored near flood-prone locations of SWR.

·Sufficient inventory of torches, diesel, cotton waste, fuses, match boxes, and detonators is being maintained.

·A comprehensive inventory of sleepers, rails, and other P.Way materials, at their respective locations, is updated and relief trains are prepared with the necessary scale of engineering materials. The road vehicles, including motor trollies, moped trollies, and push trollies, are maintained in optimal working condition.

Regular Co-ordination & Meeting with State/other authorities:

Railway officials keep regular co-ordination with Irrigation and State Disaster Response Force authorities during monsoon season to address prevention, preparedness, rescue, and relief issues related to all types of disasters that may impact the railway system.

Special Patrolling:

The emergency patrolling will be started o­n receipt of weather warning message. Also, stationary watchmen have been deployed for observing the water levels, drainage flow, falling of trees o­n track or any other thing obstructing the traffic.

Testing of Communication Equipment:

The walkie-talkie sets are maintained in a well-charged condition, ensuring their readiness for emergency communications. Emergency telephones are prepared and available for immediate use. Field telephones are thoroughly inspected and are always carried along the line to ensure effective communication.

Counselling Alertness to Trackman & P.Way Staff:

Watchmen have been placed for monitoring at vulnerable locations. Key men have received comprehensive training to take appropriate action, during sudden storms and water level rising near bank or at bridges. Special patrolling charts for monsoon have been prepared to check the railway track and maintain safety during the rainy season. The trackmen deputed for monsoon patrolling have been trained and counselled through intensive drives and workshops and meetings have been conducted in educating gagmen and other field staff about essential monsoon precautions.

General Manager Shri Sanjeev Kishore has directed all officers to accord first priority to safety, especially during monsoon. He has instructed the concerned engineering officials to maintain strict vigil and close coordination with local authorities to be prepared for sudden rains, storms or changes in weather conditions.  

                                                                                                                                Aneesh Hegde
                                                                             Chief Public Relations Officer                                                                                                  South Western Railway, Hubballi 





2
Press Release No. 11808-06-2023
Hubballi
Press Release No. 118, STATUTORY INSPECTION OF NEWLY DOUBLED UGARKHURD – VIJAYANAGAR RAILWAY SECTION

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 118 Dt: 08.06.2023

STATUTORY INSPECTION OF NEWLY DOUBLED UGARKHURD – VIJAYANAGAR RAILWAY SECTION

The doubling of railway track between Ugarkhurd – Vijayanagar (18.5 km) has been completed at a cost of Rs. 210 crore. Statutory inspection by Commissioner of Railway Safety is scheduled o­n 09.06.2023. After the inspection and compliances to various safety norms, the newly laid track will be open for railway service.

The doubling is part of Londa – Miraj project sanctioned in 2015-16. The project is 100% funded by Ministry of Railways. So far, 154 km out of 186 km had been commissioned. The stretch from Londa – Ghataprabha was dedicated by Hon’ble PM in March 2023.

Doubling of railway track enhances the capacity as well as safety. Not o­nly can more number of trains be operated, but the direction of traffic is fixed (Up line and Down Line) and express / passenger trains need not wait for crossing of other trains (passenger or goods).

The Newly doubled section between Ugarkhurd – Vijayanagar consists of 02 major bridges, 27 minor bridges and 2 Road Over Bridges. There are three stations namely Ugarkhurd, Vijayanagar & Shedbal.

During the statutory inspection of commissioner of Railway Safety, speed trial will be carried out, therefore public are cautioned to the be careful and not trespass the railway tracks.

                                                                                                                                Aneesh Hegde
                                                                             Chief Public Relations Officer                                                                                                  South Western Railway, Hubballi 






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit