For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








4 Trains from (VC)Vyasa Colony Junction to (MRJ)MIRAJ JN


Address: Behind smiore PU college Road, Ramanmalai Block,near hanumanahalli Karnataka

Station Code: VC

Station Name: Vyasa Colony Junction

Zone: SWR/South Western

Train Frequency Weekly: 1

Station Traffic: Low

Address: Miraj Railway Station, Maniknagar Bypass, Miraj, Maharashtra 416410, India

Station Code: MRJ

Station Name: MIRAJ JN

Zone: CR/Central

Train Frequency Weekly: 383

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
16532GARIB NAWAZ EXPHPT01:50MRJ12:4010:50F2A,3A,SL,GN,16532 Status
16534SBC JODHPUR EXPHPT01:50MRJ12:4010:50SU2A,3A,SL,GN,16534 Status
17415HARIPRIYA EXPMRB05:41MRJ14:559:14M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,17415 Status
11303MUGR KOP EXPRESSHPT10:10MRJ20:3510:25M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11303 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
158/2023-24 09-06-2023
Chennai
Change in pattern of Train Services


In view Line Block/Power block for facilitating Engineering Works in Basin Bridge Jn – Vyasarpadi Section for insertion of temporary girder at Bridge No.14 R between Basin Bridge and Vyasarpadi in Chennai Division, the following changes are made in pattern of train Services:

Diversion of Express Trains Services:

ØTrain No. 22647 Korba – Kochuveli Superfast Express leaving Korba at 19.40 hrs o­n 10thJune, 2023 will be diverted to run via Korukkupet, Washermanpet, Chennai Beach and Chennai Egmore skipping stoppage at Dr MGR Chennai Central.

ØTrain No. 13351 Dhanbad – Alappuzha Express leaving Dhanbad at 11.35 hrs o­n 10th, 12th June, 2023 will be diverted to run via Korukkupet, Washermanpet, Chennai Beach and Chennai Egmore skipping stoppage at Dr MGR Chennai Central.

ØTrain No. 22502 New Tinsukia – SMVT Bengaluru Weekly Superfast Express leaving New Tinsukia at 18.05 hrs o­n 09th June, 2023 will be diverted to down slow Line and skipping stoppage at Perambur. Additional Stoppage will be provided at Tiruvallur for the convenience of passengers

ØTrain No. 22645 Indore – Kochuveli Weekly Express leaving Indore at 16.45 hrs o­n 12thJune, 2023 will be diverted to run via Vyasarpadi, Washermanpet, Chennai Beach and Chennai Egmore skipping stoppage at Dr MGR Chennai Central

Short Termination of Train Service:

ØTrain No. 22650 Erode – Dr MGR Chennai Central Yercaud Express leaving Erode at 21.00 hrs o­n 11th and 13th June, 2023 will be short terminated at Perambur. The train will be partially cancelled between Perambur and Dr MGR Chennai Central

ØTrain No. 22652 Palakkad – Dr MGR Chennai Central leaving Palakkad at 16.10 hrs o­n 13th June, 2023 will be short terminated at Avadi. The train will be partially cancelled between Avadi and Dr MGR Chennai Central

ØTrain No. 12658 KSR Bengaluru - Dr MGR Chennai Central Mail Express leaving KSR Bengaluru at 22.40 hrs o­n 13th June, 2023 will be short terminated at Avadi. The train will be partially cancelled between Avadi and Dr MGR Chennai Central

                                                                

Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869/



(B.Guganesan)
Chief Public Relations Officer




2
Press Release No. 11808-06-2023
Hubballi
Press Release No. 118, STATUTORY INSPECTION OF NEWLY DOUBLED UGARKHURD – VIJAYANAGAR RAILWAY SECTION

दक्षिण à¤ªà¤¶à¥à¤šà¤¿à¤® à¤°à¥‡à¤²à¤µà¥‡ / SOUTH WESTERN RAILWAY  
प्रेस à¤µà¤¿à¤œà¥à¤žà¤ªà¥à¤¤à¤¿ / Press Release No. 118 Dt: 08.06.2023

STATUTORY INSPECTION OF NEWLY DOUBLED UGARKHURD – VIJAYANAGAR RAILWAY SECTION

The doubling of railway track between Ugarkhurd – Vijayanagar (18.5 km) has been completed at a cost of Rs. 210 crore. Statutory inspection by Commissioner of Railway Safety is scheduled o­n 09.06.2023. After the inspection and compliances to various safety norms, the newly laid track will be open for railway service.

The doubling is part of Londa – Miraj project sanctioned in 2015-16. The project is 100% funded by Ministry of Railways. So far, 154 km out of 186 km had been commissioned. The stretch from Londa – Ghataprabha was dedicated by Hon’ble PM in March 2023.

Doubling of railway track enhances the capacity as well as safety. Not o­nly can more number of trains be operated, but the direction of traffic is fixed (Up line and Down Line) and express / passenger trains need not wait for crossing of other trains (passenger or goods).

The Newly doubled section between Ugarkhurd – Vijayanagar consists of 02 major bridges, 27 minor bridges and 2 Road Over Bridges. There are three stations namely Ugarkhurd, Vijayanagar & Shedbal.

During the statutory inspection of commissioner of Railway Safety, speed trial will be carried out, therefore public are cautioned to the be careful and not trespass the railway tracks.

                                                                                                                                Aneesh Hegde
                                                                             Chief Public Relations Officer                                                                                                  South Western Railway, Hubballi 






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit