For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








5 Trains from (LKO)LUCKNOW NR to (DWO)DOIWALA


Address: Lucknow Railway Station, Kanpur Road, Railway Colony, Charbagh, Lucknow, Uttar Pradesh, India

Station Code: LKO

Station Name: LUCKNOW NR

Zone: NR/Northern

Train Frequency Weekly: 860

Station Traffic: High

Address: Doiwala Railway Station, Doiwala, Uttarakhand 248140, India

Station Code: DWO

Station Name: DOIWALA

Zone: NR/Northern

Train Frequency Weekly: 73

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
15001MFP DDN EXPLKO03:03DDN14:0010:57M2A,3A,SL,GN,15001 Status
15005GKP DDN EXPRESSLKO03:03DDN14:0010:57W,F2A,3A,SL,GN,15005 Status
12327UPASANA EXPRESSLKO07:35DDN18:0510:30TU,F2A,3A,SL,GN,12327 Status
14265BSB DDN EXPLKO16:45DDN06:3013:45M,TU,W,TH,F,SA,SU2A,3A,SL,GN,14265 Status
13009DOON EXPRESSLKO18:25DDN07:3513:10M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13009 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.832/2021-2204-04-2022
secunderabad
PR No. 832 - 26 Summer Special Trains between Hyderabad - Gorakhpur

  


In order to clear extra rush during summer season, South Central Railway will run 26 summer special trains between Hyderabad – Gorakhpur - Hyderabad as detailed below:

 

Sl. No

Train No

From - To

Dep.

Arrival

JCO

1

02575

Hyderabad - Gorakhpur

21.05 hrs

(Friday)

06.30 hrs

(Sunday)

1st. 8th, 15th, 22nd, 29th April, 6th, 13th, 20th, 27th May, 3rd, 10th, 17th, 24th June, 2022

2

02576

Gorakhpur - Hyderabad

08.30 hrs

(Sunday)

16.20 hrs

(Monday)

3rd. 10th, 17th, 24th April, 1st, 8th, 15th, 22nd, 29th May, 5th, 12th, 19th, 26th June, 2022

 

I.Train No. 02575/02576 Hyderabad – Gorakhpur – Hyderabad special train : (26 services)

These Special Trains will stop at Secunderabad, Kazipet, Peddapalli, Mancherial, Balharshah, Nagpur, Itarsi, Bhopal, Bina, Virangana Lakhshmibai, Orai, Pokhrayan, Kanpur,Aishbagh, Lucknow City, Barabanki Station and Gonda Railway stations in both the directions (Note: Train No.02575 will not stop at Barabanki Station) .

            These tarins consist of AC II tier, AC III tier and Sleeper class coaches





2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.169/2020-2128-05-2021
Secunderabad
Pilgrims must get fast, safe and comfortable leg connectivity beyond BG link with the Char Dhams” - Shri Piyush Goyal


Shri Piyush Goyal Minister for Railways and Commerce & Industry and Consumer Affairs, Food & Public Distribution reviews last mile connectivity plans for Char Dham projects

Final Location Survey (FLS) for new BG Rail connectivity to Char Dham i.e. Yamunotri, Gangotri, Kedarnath and Badrinath is near completion

"Pilgrims must get fast, safe and comfortable last leg connectivity with the Char Dhams", this was said by Shri Piyush Goyal Minister for Railways and Commerce & Industry and Consumer Affairs, Food &Public Distribution while reviewing the last mile connectivity plans for Char Dham projects.

The Minister directed concerned officials to do a detailed review of all the alternatives keeping in view the comfort and safety of citizens. He said that options of all last leg connectivity be examined along with detailed cost implications for the entire project upto completion.

Minister said that in order to cater to the need of tourism and to make it convenient for the pilgrims to reach the temple safely and timely, a comprehensive planning for project needs to be done.

It may be noted that Final Location Survey (FLS) for new BG rail connectivity to Char Dham i.e. Yamunotri, Gangotri, Kedarnath and Badrinath is near completion.

Kedarnath and Badrinath Rail connectivity will take off from Karnaprayag station which is part of 125 km long Rishikesh -Karnaprayag new BG Rail line project under construction at full swing. Gangotri and Yamunotri Rail connectivity will take off from existing Doiwala Station. As per Char Dham BG Rail connectivity survey, the terminal station of new BG Rail line are terminating at Barkot, Uttarkashi, Soneprayag and Joshimath which are short of Char Dham temples due to steep terrain and limitation of BG ruling gradients.

In order to cater to the need of tourism and to make it convenient for the pilgrims to reach the temples safely and timely,Reconnaissance Engineering Survey(RES) for connecting new BG Railway terminal stations to Dhams (Temples) is being carried out with an objective to look for suitable system which is environmental friendly, safe and at the same time a tourist attraction.

A large number of pilgrims across the country flocks to Char Dhams & large number of foreign and domestic tourist are attracted to trekking & site seeing in the state of Uttarakhand. The existing road connectivity travels through fragile mountainous slopes and suffers from serious handicaps of load, capacity, safety and speed. The Rail connectivity to these Char Dhams will make the travel much safer, economical, comfortable, environment friendly and all weather.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit