For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (GGN)GURGAON to (PAD)PARDI


Address: 122006, India

Station Code: GGN

Station Name: GURGAON

Zone: NR/Northern

Train Frequency Weekly: 401

Station Traffic: High

Address: Pardi, Gujarat 396125, India

Station Code: PAD

Station Name: PARDI

Zone: WR/Western

Train Frequency Weekly: 139

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
22950DEE BDTS SF EXPGGN16:50VAPI14:2621:36TH2A,3A,SL,GN,22950 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
118/2023-24 25-05-2023
Chennai
Update on Katpadi Station Redevelopment works



Southern Railway has taken up Katpadi Station redevelopment in order to offer a world-class ambience, futuristic infra and airport-like facilities for passengers. Tender was awarded for the redevelopment in September 2022 and the redevelopment work is progressing at a steady pace.

Works executed recently

·Architectural & structural drawing of Phase-I & Phase II buildings.

·Environment monitoring survey completed.

·GRIHA rating for Katpadi station Redevelopment work.

·Project Management Site Office construction completed.

·Staff quarters footing work completed.

Other works in progress

·Site laboratory & mess construction work in progress.

·Setting up of a Batching plant in progress.

·Architectural & structural Design of the Station Buildings, Multi-level Car Parking, Multi-level Two-wheeler Parking, Foot-Over-Bridge, Air-Concourse & other buildings in progress.

·Staff quarters foundation backfilling in progress.

·Site cleaning & Marking for Scout, Artesian, RPF barrack in progress.

Works executed So far

·Master Plan Validation completed.

·Traffic Survey work completed.

·Utility Scanning completed.

·Preliminary works such as Mapping and Topographical survey, drone survey, DGPS Survey, Traffic survey, tree inventory, joint inventory of movable and immovable assets.

·All kind of Soil test (Geotechnical investigation) completed at various locations.

·Project management Services have commenced work.

·Site clearance work completed for building locations for Phase-I & Phase II.

·Right of way, which is a legal right to enter and carry out the work, has been provided to the EPC contractor for construction of Phase-I building for Staff quarters (Type-II - 16 units, 2 blocks), Barrack and Scout, P- way and Signal Warehouse, SSE Tele/Signal yard space, Gang tool cum Restroom Artisans room, Parcel/RMS office and Elevated trolley path, MLCP/MLTP and PWAY shed, Sump, STP , Solid waste management System including incinerator, External Service, Departure Air Concourse & Departure terminal building.

·On a regular basis project review meetings are held with the stakeholders of the project.

·Fabrication of Sign boards & barricades completed.

Katpadi (KPD) Station Redevelopment works

The work of redevelopment of Katpadi Railway station was awarded as EPC contract to M/s Engineering Projects (India) Ltd, Chennai at a cost of Rs. 329.32 Crore, setting a time frame of 36 months from D Date, i.e. from 01-12-2022, for completion of the project.  M/sVoyants Solutions Pvt Ltd, Gurgaon have been tasked with the work of Project Management services (PMS) at a cost of Rs.7.89 Crore.

Two terminals (Arrival & Departure) are proposed to be constructed in the southern side, connected by Air concourses while arrival & departure lobby will be constructed in the Northern side. The Terminal Buildings will be equipped with world class amenities like waiting lounge, ticketing area, commercial area and Roof plaza etc. Elevated skywalks and subways with adequate lifts/escalators will connect both of these terminals to the bus stand thus enabling hassle-free inter-modal connectivity.  A dedicated space for handling parcels will also be constructed.

                                                            

 Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.facebook.com/Southern-Railway-240606622749869/



(B.Guganesan)
Chief Public Relations Officer




2
2023/0502-05-2023
Mumbai
FEW WR TRAINS AFFECTED DUE TO BLOCK BETWEEN UDVADA – PARDI, MAROLI – SACHIN & NAVSARI – MAROLI SECTIONS

FEW WR TRAINS AFFECTED DUE TO BLOCK BETWEEN UDVADA – PARDI, MAROLI Ã¢â‚¬â€œ SACHIN & NAVSARI – MAROLI SECTIONS

In order to carry out the work for Strengthening of Bridge approaches by Geo cells for Bridge No. 304 between Udvada – Pardi section and Bridge No. 417 in Maroli – Sachin section a block will be taken. The block will be from 09.20 hrs to 13.50 hrs for Bridge No. 304 and from 10.20 hrs to 14.50 hrs for Bridge No. 417, on Wednesday, 3rd May, 2023. Besides this, to carry out the work of launching RH girders and pushing RCC box in lieu of LC-127 between Navsari – Maroli section, a block will be taken from 10.20 to 14.50 hrs at this location o­n Wednesday, 3rd May, 2023. Due to these blocks few Western Railway trains will be regulated and short terminated.

According to a press release issued by Public Relations Department of Western Railway, the details of these trains are as under:

Regulation of Trains o­n 3rd May, 2023:

1.Train No. 19015 Dadar – Porbandar Saurashtra Express will be regulated by 01.00 hr.

2.Train No. 09075 Mumbai Central - Kathgodam Superfast Special will be regulated by 40 mins.

Short Termination of Trains o­n 3rdMay, 2023:

1.Train No. 09085 Borivali – Valsad will be short terminated at Bhilad.

Passengers are requested to kindly take note of the same.

*******






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit