For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

TADWAL

STATION INFO

Address: Tadwal Station, Maharashtra 413219, India

Station Code: TVL)TADWA

Station Name: TVL)TADWAL

Zone: SWR/South Western

Total Unique Trains: 14

Train Frequency Weekly: 79

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
57686BJP SUR PASS01:0901:101M,TU,W,TH,F,SA,SUUNRESERVED
56903SUR DHARWAR PASS01:2701:281M,TU,W,TH,F,SA,SUSL,GN
56904DWR SUR PASSENGE02:1402:151M,TU,W,TH,F,SA,SUSL,GN
56905SUR UBL PASS05:2705:281M,TU,W,TH,F,SA,SUUNRESERVED
71304GDG SUR PASS08:1908:201M,TU,W,TH,F,SA,SUUNRESERVED
57130HYB BJP PSGR09:0909:101M,TU,W,TH,F,SA,SUSL,GN
51029BJP FAST PASS10:3910:401M,TU,W,SUSL,GN
71303SUR GDG PASS12:3612:371M,TU,W,TH,F,SA,SUUNRESERVED
57133BJP RC PASS13:3913:401M,TU,W,TH,F,SA,SUUNRESERVED
57134RC BJP PASS15:2415:251M,TU,W,TH,F,SA,SUUNRESERVED
51030BJP BB FAST PAS16:0916:101M,TU,W,THSL,GN
57129BOLARUM PASSR19:5419:551M,TU,W,TH,F,SA,SUSL,GN
57685SUR BJP PASS20:5921:001M,TU,W,TH,F,SA,SUUNRESERVED
56906UBL SUR PASS21:1921:201M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
Press Release No. 17810-08-2020
Hubballi
Press Release No. 178, DOUBLING BETWEEN LACHYAN-HOTGI (33 KM) COMMISSIONED

प्रेस विज्ञप्तिPress Release No. 178  Dt: 30.07.2020

DOUBLING BETWEEN LACHYAN-HOTGI (33 KM) COMMISSIONED

The doubling project from Hotgi-Kudgi-Gadag (284 km) was sanctioned by Railway Board in 2014-15 at an anticipated cost of Rs.1870 Crore. It connects states of Karnataka & Maharashtra through Bijapur & Sholapur districts.

Doubling of Kudgi-Hotgi has been taken up under Customer funding model with M/s.NTPC. This is o­ne such project in Indian Railways, wherein Customer/beneficiary of the project is contributing to the cost of project.

An amount of Rs.946 Crore has been deposited by M/s.NTPC towards the cost of Doubling of the stretch between Hotgi-Kudgi (134 km) and the remaining amount is funded by Railway for doubling of Kudgi – Gadag section (150 km).

This doubling work will increase line capacity and help in avoiding detention to trains waiting for crossing and introduction of additional trains o­n this route.  This will also help in smooth movement of rakes to/from the industries/power plants and will also boost overall economic development of the region. Commissioning of this section will give impetus to movement of passengers and transport of goods between states of Karnataka and Maharashtra. This is an important rail link connecting the cities of Bengaluru and Mumbai. A lot of tourist places like Bagalkot, Bijapur, etc are getting connectivity.  This project facilitates Rail connectivity for supply of raw materials & Coal to NTPC plants at Kudgi & Hotgi.

Commissioner of Railway safety has inspected Lachyan-Hotgi (33 km) section o­n 18thMay and section was commissioned by South Western Railway o­n 29th July along with remodeling of Hotgi yard by Central Railway even in difficult situation of covid pandemic. Two halt stations (Padnur, Sulerjavalge) and o­ne block station (Tadwal) are situated under this section.

The track passes through the 670 m long important bridge over River Bhima, the longest bridge in the zone comprising 14 spans of 45.7 m spans is a major achievement.  This bridge is designed to fit for 25T axle loading. Currently, speed restrictions are imposed o­n existing bridge since it is not capable of carrying higher axle loads.

The bridge consists of two lines, first line is ready for traffic movement & second line will be ready by October. New bridge will increase speed of goods trains and throughput.  As o­n date 148 Km of track from Wandal - Hotgi is commissioned & entire 284 Km section from Hotgi to Gadag will be completed to double line by 2022.


                                                                                           Chief Public Relations Officer

                                                                              South Western Railway, Hubballi





2
2019/11/1718-11-2019
CR to Run Solapur – Bijapur Unreserved Daily Winter Special Trains

Central Railway

Press Release

 

CR to Run Solapur – Bijapur Unreserved Daily Winter Special Trains

 

Central Railway will run 24 unreserved special trains between Solapur and Bijapur to clear the extra rush of passengers during winter holidays. The details are as under:- 

 

Solapur- Bijapur Unreserved Daily Specials (24 Trips)

 

Train No. 01301 Special will leave Solapur at 08.20 hrs daily from 16.11.2019 to 27.11.2019 (12 trip) and will arrive Bijapur at 11.00 hrs same day.

 

Train No. 01302 Special will leave Bijapur at 18.30 hrs From 16.11.2019 to 27.11.2019 (12 trip) and will arrive Solapur at 21.10 hrs same day.

Halts: Hotgi, Sulerjavalge, Tadwal, Padnur, Lachyan, Indi Road, Chorgi, Nimbal, Kyatanakeri Road and Minchnal. 

 

Composition: 10 General second class

 

All concerned to note and avail the facility.

---- --- -- --- --- --- ---

Date: November 18, 2019

 

This press release is issued by Public Relations Depatment, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai. 



(Shivaji Sutar)
Chief Public Relations Officer