For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

GOVINDPURI

STATION INFO

Address: Govindpuri Railway Station, Govind Nagar, Kanpur, Uttar Pradesh 208006, India

Station Code: GOY)GOVINDPUR

Station Name: GOY)GOVINDPURI

Zone: NCR/North Central

Total Unique Trains: 24

Train Frequency Weekly: 145

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
64163CNB PNK MEMU04:4804:502M,TU,W,TH,F,SA,SUUNRESERVED
64260PNK LJN MEMU06:1106:121M,TU,W,TH,F,SA,SUUNRESERVED
51802CNB MKP PASS06:2306:252M,TU,W,TH,F,SA,SUUNRESERVED
64153CNB ETW MEMU06:4406:451M,TU,W,TH,F,SA,SUUNRESERVED
51804CNB JHS PASS07:2107:232M,TU,W,TH,F,SA,SUUNRESERVED
15206CHITRAKUT EXP07:3307:352M,TU,W,TH,F,SA,SU2A,3A,SL,GN
13007U ABHATOOFAN EXP08:5008:511M,TU,W,TH,F,SA,SU3A,SL,GN
51813JHS LKO PASS08:5508:572M,TU,W,TH,F,SA,SUUNRESERVED
64162PHD CNB MEMU09:3509:361M,TU,W,TH,F,SA,SUUNRESERVED
11109JHS LJN INT EXP10:0310:052M,TU,W,TH,F,SA,SUCC,2S,GN
54161KURJ CNB PASS10:2110:232M,TU,W,TH,F,SA,SUUNRESERVED
64588TDL CNB DEMU12:4412:451M,TU,W,TH,F,SA,SUUNRESERVED
51803JHS CNB PASS13:5814:002M,TU,W,TH,F,SA,SUUNRESERVED
11123BJU GWL MAIL13:5814:002M,TU,W,TH,F,SA,SU2A,3A,SL,GN
64587CNB TDL MEMU14:1414:151M,TU,W,TH,F,SA,SUUNRESERVED
54162CNB KURJ PASS16:3516:372M,TU,W,TH,F,SA,SUUNRESERVED
11124GWL BJU MAIL18:0018:022M,TU,W,TH,F,SA,SU2A,3A,SL,GN
13008U A TOOFAN EXP18:1618:182M,TU,W,TH,F,SA,SU3A,SL,GN
64159CNB PHD MEMU18:2018:211M,TU,W,TH,F,SA,SUUNRESERVED
11110LJN JHS INT EXP18:4818:502M,TU,W,TH,F,SA,SUCC,2S,GN
64156ETW CNB MEMU18:5818:591M,TU,W,TH,F,SA,SUUNRESERVED
51814LKO JHS PASS19:1519:172M,TU,W,TH,F,SA,SUUNRESERVED
15205CHITRAKUT EXP19:3019:322M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51801MKP CNB PASS22:2522:272M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
07-11-2019
North Central Railway Gears up for safe and detention free train operation during winters- GM/NCR Sri Rajiv Chaudhry conducts Video Conference with Divisions

North Central Railway

Headquarter

Public Relations

Prayagraj

No. 11PR/11/2019/Press ReleaseDate: 05.11.2019

North Central Railway Gears up for safe and detention free train operation during winters- GM/NCR Sri Rajiv Chaudhry conducts Video Conferencewith Divisions

A video conference of North Central Railway Headquarters held with Agra, Allahabad and Jhansi divisions. In the beginning of the video conference, General Manager North Central Railway Shri Rajiv Chaudhry along with principal head of departments reviewed the safety position o­n Agra, Allahabad and Jhansi divisions. Shri Chaudhry emphasized that detailed investigation in all cases of failure and detention are must for system improvement and instructed divisions to ensure it religiously. He sensitized all three Divisions that winters has already set in and stipulated patrolling of railway tracks must be ensured. He also stressed that proper visibility of signals, compliance of stipulated winter precautions for locomotives, coaches &wagons, availability of retroreflective boards etc. must be ensured for safe and detention free travel this winter. Safety record of Indian Railway has been quite good this year and no human life is lost in any train accident in first 07 months of financial year 2019-20. North Central Railway runs about 100 trains o­n 130 Kmph or more and it has been doing pioneering work in field of way side rolling stock monitoring system by installing first Hot Box Detector and Hanging part detection system at Chunar station of Allahabad division. Wheel impact detectors are also installed in Allahabad and Agra divisions and CCTV provision for rolling in examination has been done at many stations. Advanced system of o­nline Rolling Stock monitoring is also being installed in Allahabad division. Moving ahead in this direction NCR has now decided to conduct a trial to provide CCTV at Bamrauli station at both UP and Down lines with display to Porter or Assistant Station Master to ensure that mandatory monitoring of passing train at enroute station is augmented for enhanced safety in train operation.Besides this “Transfer of Key” is also being provided for all manned level crossing gates o­n NCR to give positive confirmation to Assistant Station Master o­n level crossing gate closing before signal is lowered for any train to avoid any possibility of miscommunication regarding gate closure. General Manager also directed that a drive must be done to assess proper functioning of all equipment o­n Level Crossing andavailability of basic amenities for gate man. Indian Railways has already removed all unmanned level crossing from its broad gauge(BG) network last year and it is now replacing manned gates with Road over bridges or Limited height subways to further improve safety as well as to reduce detention of trains due to cases of late gate closures etc. This year NCR has targeted replacement of 114 manned level crossing with ROBs/RUBs, of which 65 are already done upto Oct-19 and balance 49 are planned for execution in current financial year.

In the meeting it was also discussed that with substantial conversion of coaching trains o­n LHB stock it is important that more and more Assistant Loco Pilots and Shunting staff needs to be trained o­n handling of LHB coaches.

After Chairman Railway Board visit to NCR o­n 02.11.19, process for introduction of New Shatabdi between Allahabad and Lucknow has been expedited and tentative timings of run etc.are being worked out by North Central Railway in consultation with Northern Railway. o­n infrastructural front, it was decided to start preparatory work in connection with Electronic Interlockingof Govindpuri station. North Central Railway has recently completed major Electronic Interlocking work at Tundla Jn.thusremoving mechanical signaling system from its trunk route. Other important infrastructure works of Jhansi-Kanpur doubling, construction of new washable apron at Allahabad Platform-3 , Renewal of washing lines at Allahabad etc were also discussed .

Punctuality position prevailing o­n all the divisions of North Central Railway was also reviewed during the meeting. General Manager Shri Rajiv Chaudhry advised divisions to monitor regular bad runners and pull up their punctuality performance.This year punctuality performance of North Central Railway has improved substantially which is higher by 11 percent in first 07 months of financial year 2019-20 when compared to same period of last year.





2
01-11-2019
Compendium of Joint Procedure Order of North Central Railway, October -2019unveiled by General Manager Shri Rajiv Chaudhry

North Central Railway

Headquarter

Public Relations

Prayagraj

No. 11PR/10/2019/ Press ReleaseDate: 30.10.2019

Compendium of Joint Procedure Order of North Central Railway, October -2019unveiled by General Manager Shri Rajiv Chaudhry

A video conference of North Central Railway Headquarters held with Agra, Allahabad and Jhansi divisions. In the beginning of the video conference, Shri Rajiv Chaudhry,General Manager unveiled the Joint Procedure Order of North Central Railway, first edition October -2019 along with Chief Safety OfficerShri S K Kashyupand other Principal head of departments of North Central Railway. Operation and maintenance o­n Railway is a multidisciplinary subject.Safe and efficient operation calls for proper coordination among different departments. To avoid confusion at grass root working level and to follow standard working procedure all over North Central Railway many joint procedure orders are issued o­n issues involvingmore than o­ne department and these JPOs are jointly approved by head of concerned departments. Safety department which is nodal agency for checking compliance of safety related matters o­n this Railway has compiled all Joint Procedure orders which are currently in force and published this compendium for the first time o­n North Central Railway in October-2019. This compendium shall immensely benefit staff, supervisor and officers connected with train operations as a ready reference o­n all crossdiscipline issue related to train operations. This shall be distributed to all officials in the three divisions connected with train operations.

General ManagerShri Rajiv Chaudhry complimented safety department for compiling JPOs issued o­n North Central Railway in last o­ne decade. He further added that Mission zero accident should always be our endeavor and it is possible with our sincere and dedicated efforts.He urged that all Railwaymen connected with train operations should utilize this compendium of JPO and they should work towards mission zero accident.

Later review o­n safety, punctuality and infrastructure was also done in the video conference. North Central Railway punctuality is o­n upswing and it has improved by more than 10% over last year. In this festive season,North Central Railway has taken many steps to run more coaching trains with improved punctuality and these efforts are bearing fruits now. o­n 27.10.19 Allahabad division operated 46 special trains to clear Deepawali Rush which is highest ever special train operation except for Mauni Amavasya in Kumbh -2019. Similarly o­n 28.10.19,Jhansi division of North Central Railway achieved punctuality of close to90% which is highest ever punctuality of coaching trains in Jhansi division.

On infrastructure front important works related to Electronic Interlocking of Govindpuri , Replacement of Route Relay Interlocking with yard modification at Allahabad, Kanpur yard remodeling, Automatic signaling in Rooma- Bindaki section , 4th line between Phaphund- Bhaupur sectionetc were discussed. North Central Railway has recently completed a major work of Electronic Interlocking at Tundla in Allahabad division.








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search