For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

GOVINDPURI

STATION INFO

Address: Govindpuri Railway Station, Govind Nagar, Kanpur, Uttar Pradesh 208006, India

Station Code: GOY)GOVINDPUR

Station Name: GOY)GOVINDPURI

Zone: NCR/North Central

Total Unique Trains: 24

Train Frequency Weekly: 145

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
64163CNB PNK MEMU04:4804:502M,TU,W,TH,F,SA,SUUNRESERVED
64260PNK LJN MEMU06:1106:121M,TU,W,TH,F,SA,SUUNRESERVED
51802CNB MKP PASS06:2306:252M,TU,W,TH,F,SA,SUUNRESERVED
64153CNB ETW MEMU06:4406:451M,TU,W,TH,F,SA,SUUNRESERVED
51804CNB JHS PASS07:2107:232M,TU,W,TH,F,SA,SUUNRESERVED
15206CHITRAKUT EXP07:3307:352M,TU,W,TH,F,SA,SU2A,3A,SL,GN
13007U ABHATOOFAN EXP08:5008:511M,TU,W,TH,F,SA,SU3A,SL,GN
51813JHS LKO PASS08:5508:572M,TU,W,TH,F,SA,SUUNRESERVED
64162PHD CNB MEMU09:3509:361M,TU,W,TH,F,SA,SUUNRESERVED
11109JHS LJN INT EXP10:0310:052M,TU,W,TH,F,SA,SUCC,2S,GN
54161KURJ CNB PASS10:2110:232M,TU,W,TH,F,SA,SUUNRESERVED
64588TDL CNB DEMU12:4412:451M,TU,W,TH,F,SA,SUUNRESERVED
51803JHS CNB PASS13:5814:002M,TU,W,TH,F,SA,SUUNRESERVED
11123BJU GWL MAIL13:5814:002M,TU,W,TH,F,SA,SU2A,3A,SL,GN
64587CNB TDL MEMU14:1414:151M,TU,W,TH,F,SA,SUUNRESERVED
54162CNB KURJ PASS16:3516:372M,TU,W,TH,F,SA,SUUNRESERVED
11124GWL BJU MAIL18:0018:022M,TU,W,TH,F,SA,SU2A,3A,SL,GN
13008U A TOOFAN EXP18:1618:182M,TU,W,TH,F,SA,SU3A,SL,GN
64159CNB PHD MEMU18:2018:211M,TU,W,TH,F,SA,SUUNRESERVED
11110LJN JHS INT EXP18:4818:502M,TU,W,TH,F,SA,SUCC,2S,GN
64156ETW CNB MEMU18:5818:591M,TU,W,TH,F,SA,SUUNRESERVED
51814LKO JHS PASS19:1519:172M,TU,W,TH,F,SA,SUUNRESERVED
15205CHITRAKUT EXP19:3019:322M,TU,W,TH,F,SA,SU2A,3A,SL,GN
51801MKP CNB PASS22:2522:272M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
11-09-2019
Safety Review Meeting held at NCR HQ

North Central Railway

Headquarter

Public Relations

Prayagraj

No. PR/09/2019Press ReleaseDate: 09.09.2019

Safety Review Meeting held at NCR HQ

 On 09.09.2019 a review meeting held at NCR HQ Subedarganj pertaining to safety and other important issues. Shri Rajiv Chaudhry, General Manager, Shri Arun Malik Additional General Manager, Principal Heads Of different departments attended the meeting while DRMs and their team from Agra , Allahabad and Jhansi joined through video conference. 

First safety position o­n North Central Railway was reviewed.  General Manager, Shri Chaudhry said that in case of unusual incidents & accidents etc photographic evidences are very important and revealing photographs needs to be taken. If need be some training of railwaymen entrusted with evidence collection be organised. Shri Chaudhry also emphasised that pathway wherever not available in station yards are required to be provided in phased manner for ease of movement of staff in yards to the points etc. He also added that in future bicycles can also be provided to station staff for ease of movement in yard for locking of points etc as per requirement. During the meeting safety hazard associated with wagon door open o­n run was discussed and means to mitigate it were reiterated to all three divisions.

For improved fire safety in coaching trains master switch relocation from luggage to guard portion in SLR is an important modification.  General Manager emphasized that it is a important modification and directed divisions to complete balance SLRs immediately. Further items of safety action plan of different departments were also reviewed. 

General Manager Shri Rajiv Chaudhry expressed satisfaction over items where achievements are as per targets and advised all concerned to make good o­n shortfall items. Under the safety action plan important items related to safety in train operations are identified pertaining to different departments like track renewals, electronic interlocking , dual detection system, air conditioning of running rooms, air conditioning of locomotive cabs, removal of critical implantation ,Ultrasonic testing , fire & smoke detectors , fire extinguishers in Non AC coaches, interlocking of gates, provision of CBC etc. These items are accorded topmost priority and execution is closely monitored by respective departments as well as safety branch. North Central Railway is installing 02 “Online Monitoring of Rolling Stocksystem” in Allahabad division. These o­nline monitoring of rolling stock systems have acoustic bearing detector and wheel impact detector to detect bearing defects as well as flat wheel in very early stage.  o­nce commissioned in Sarsaul up main line and Kanchausi down main line, it will help in very early defect detection to avoid section block and unsafe condition due to hot axle , flat wheel etc.

On infrastructure front, progress of Tundla Non Interlocking was discussed and found to be progressing as per target.  After Tundla, Non Interlocking of Govindpuri, NI and RRI modification of Kanpur shall be taken up for execution. General Manager emphasized that weigh bridges must be attended immediately so as down time is minimal. He said satisfactory working of weigh bridge is essential for proper  weighment of loaded rake.








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search