For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

A N DEV NAGAR

STATION INFO

Address: Acharya Narendra Dev Nagar Railway Station, railway station between Ayodhya and, Faizabad, Uttar Pradesh 224001, India

Station Code: ACND)A N DEV NAGA

Station Name: ACND)A N DEV NAGAR

Zone: NR/Northern

Total Unique Trains: 14

Train Frequency Weekly: 79

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
54110FD DDU PASS03:3603:371M,TU,W,TH,F,SA,SUUNRESERVED
54238FD MUR PASS04:5504:561M,TU,W,TH,F,SA,SUUNRESERVED
13151JAMMU TAWI EXP07:1307:141M,TU,W,TH,F,SA,SU2A,3A,SL,GN
54333BSB LKO PASS09:5409:551M,TU,W,TH,F,SA,SUUNRESERVED
13484FARAKKA EXPRESS10:0710:081TU,TH,F,SU2A,3A,SL,GN
13307GANGASUTLEJ EXP10:4310:441M,TU,W,TH,F,SA,SU2A,3A,SL,GN
13010DOON EXPRESS11:1911:201M,TU,W,TH,F,SA,SU2A,3A,SL,GN
13009DOON EXPRESS14:0614:071M,TU,W,TH,F,SA,SU2A,3A,SL,GN
13308GANGASATLUJ EXP14:1014:111M,TU,W,TH,F,SA,SU2A,3A,SL,GN
54334LKO BSB PASS14:4414:451M,TU,W,TH,F,SA,SUUNRESERVED
13483FARAKKA EXPRESS15:2015:211TU,W,F,SU2A,3A,SL,GN
13152KOLKATA EXP21:0121:021M,TU,W,TH,F,SA,SU2A,3A,SL,GN
54237MUR FD PASS21:3221:331M,TU,W,TH,F,SA,SUUNRESERVED
54109DDU FD PASS22:5522:561M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
19-06-2020
Press Release : ER’S FREIGHT SERVICES CONTINUING 24X7 TO MAINTAIN SUPPLY OF ESSENTIAL COMMODITIES

                                      

ER’S FREIGHT SERVICES CONTINUING 24X7 TO MAINTAIN SUPPLY OF ESSENTIAL COMMODITIES

 

Kolkata, June 19, 2020:

 

       To maintain supply of essential commodities and necessary inputs at different areas since the introduction of  nation-wide lockdown, ER has taken all-out effort to continue freight services o­n 24x7 basis, transporting food grains, sugar, fertilizers, petroleum products, minerals, steel, cement etc and coal for power generating sector.

 

Eastern Railway has run a total of 267 freight trains o­n 18.06.2020, the breakup of which is as follows:

Ash – 2 Rakes

Automobiles- 1 Rake

Railway material Consignment & Ballast- 4 Rakes

Cement – 33 Rakes

Clinker-  3 Rakes

Container-  10 Rakes

Coal and mineral -58 Rakes

De-Oiled Cake- 3 Rakes

Edible oil- 1 Rake

Fertiliser -8 Rakes

Jute -1 Rake

Maize-  6 Rakes

POL  product- 4 Rakes

Food Grains & Rice – 1 Rake

Onion – 3 Rakes

Salt – 1 Rake

Steel-  5 Rakes

Stone-  14 Rakes

Sand- 1 Rake

Wheat – 1 Rake

Besides, 107 Empty Rakes were dispatched to different freight operating points to facilitate loading of essential commodities.

 

Everywhere health & hygiene of field staff are well taken care of keeping in view the basic guidelines of social distancing. Water, soap & sanitizer are affluently available at all working points. Proper sanitization is also being done wherever required.






2
19-06-2020
Press Release : ER’S SAFETY & MAINTENANCE WORK DURING LOCK DOWN

                                      

ER’S SAFETY & MAINTENANCE WORK DURING LOCK DOWN

 

Kolkata, June 19, 2020:

 

ER has taken all out effort to undertake safety and maintenance works o­n priority during lock down period also. Taking the advantage of lock down, Engineering and  Bridge  team of ER’s  Asansol Division  completed launching of 3 nos of 21.5 m girder of Foot Overbridge (FOB) at TELWA station  in Sitarampur -Jhajha section by using Road Crane. Traffic cum Power Block was taken for the period from 14:45 hrs to 17:00 hrs o­n 19.6.2020, during Covid-19 lockdown – 5, without affecting coaching train punctuality. Sitarampur-Jhajha section is a busy section and in normal time Traffic & Power Block for such long time without affecting punctuality was not feasible.









COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search