For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








8 Trains from (TGU)TARIGOPPULA to (VDD)VENDODU


Address: Tarigoppula Railway Station, Tarigoppula Village, Tarigoppula, Andhra Pradesh 521260, India

Station Code: TGU

Station Name: TARIGOPPULA

Zone: SCR/South Central

Train Frequency Weekly: 169

Station Traffic: High

Address: Andhra Pradesh 524131, India

Station Code: VDD

Station Name: VENDODU

Zone: SCR/South Central

Train Frequency Weekly: 137

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
17479PURI TPTY EXPGDV06:40VKI14:347:54M,W,TH,F,SU2A,3A,SL,GN,17479 Status
17481BSP TPTY EXPRESSGDV06:40VKI14:347:54TU,SA2A,3A,SL,GN,17481 Status
17644CIRCAR EXPGDV19:25GDR03:007:35M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17644 Status
17247NS DMM EXPTGU20:15VKI03:247:09M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17247 Status
17245MTM DMM EXPTGU20:20VKI03:247:04M,TU,W,TH,F,SA,SU3A,SL,GN,17245 Status
17402MTM TPTY EXPTGU20:43VKI03:096:26M,TU,W,TH,F,SA,SU3A,SL,GN,17402 Status
17404NS TPTY EXPTGU20:43VKI03:096:26M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17404 Status
17210SHESHADRI EXPGDV21:42GDR03:335:51M,TU,W,TH,F,SA,SU2A,3A,SL,GN,17210 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.29/2023-2427-04-2023
Secunderabad
PR No. 29 - Speeding up of Guntur - Narsapur Express Train

On completion of Doubling and Electrification work in Gudivada – Bhimavaram Town – Narsapur – Nidadavolu section, T. No. 17281 Guntur - Narsapur Express has been speeded up with the change in timings.

The Existing and Revised Public time table (PTT) timings wef 24.04.2023 are as under:-

T. No 17281 Guntur – Narsapur  Express

Stations

T. No 17281 Guntur – Narsapur  Express

Existing PTT timings

Revised PTT timings

Arr.

Dep.

Arr.

Dep.

--

17:45

Guntur

--

17:45

18:30

18:40

Vijayawada

18:50

18:55

18:49

18:50

Madhura Nagar

19:04

19:05

18:54

18:55

Ramavarappadu

19:11

19:12

18:59

19:00

Nidamanuru

19:18

19:19

19:05

19:06

Uppaluru

19:26

19:27

19:14

19:15

Tarigoppula

19:34

19:35

19:21

19:22

Indupalli

19:40

19:41

19:29

19:30

Dosapadu

19:48

19:49

19:48

19:50

Gudivada

20:03

20:05

20:19

20:20

Mandavalli

20:26

20:27

20:29

20:30

Kaikaluru

20:35

20:36

20:43

20:45

Akividu

20:51

20:52

20:54

20:55

Undi

21:02

21:03

21:03

21:05

Bhimavaram Town

21:14

21:15

21:13

21:15

Bhimavaram Jn

21:23

21:25

21:24

21:25

Shrungavruksham

21:35

21:36

21:29

21:30

Viravasaram

21:42

21:43

21:43

21:45

Palakollu

21:54

21:56

23:00

--

Narsapur

22:30

--

2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.612/2020-2124-02-2021
Secunderabad
Shri Gajanan Mallya, General Manager, SCR conducts Inspection of Guntakal Division -Annual inspection between Gudur – Renigunta and Tirupati- Katpadi sections conducted





Shri Gajanan Mallya, General Manager, South Central Railway undertook Annual Inspection of Gudur – Renigunta section of Guntakal Division today i.e., 23rd February, 2021. He was accompanied by Shri Alok Tiwari, Divisional Railway Manager, Guntakal Division and other senior officials throughout the inspection.

The General Manager commenced inspection at the Level Crossing Gate between Kondagunta – Vendodu stations where he examined safety aspects and interacted with the Gateman. He visited Venkatagiri Railway Station, reviewed various passenger amenities, inspected Station Manager’s office, booking office, circulating area and also interacted with Track Maintainers. He inaugurated Natural Water Cooler facility set up at Venkatagiri station for the usage of passengers. He inspected Level Crossing Gate between Yathalur - Venkatagiri stations. The General Manager conducted a Speed Test of 110 Kmph in the section to examine the increase of sectional speed capacity to run trains with enhanced speed in the section. Also, the General Manager inspected a Minor & Major bridge before inspecting the operational facilities at New Tiruchanur Crossing Station.

Shri Gajanan Mallya reviewed the additional loop line works being carried out at Chandragiri Railway Station. He inspected a Road under Bridge and Minor Bridge in the section. He inspected minor & major bridge o­n Krishpuram river and Rallayeru Bridge. The General Manager during his visit at Pakala Railway Station inspected various facilities available at station and discussed about the station developmental plans with officials. He inspected facilities available at Health Unit. He reviewed the Good work done by the Division. The General Manager planted saplings towards green environment at Pakala Railway Station premises. The General Manager inaugurated a 5 KWp Solar Plant for Net Zero Energy Station at Rachagunneri Station and 10 KWp Solar Plant for Net Zero Energy Station at Vendodu station in the presence of Shri Somesh Kumar, Principal Chief Electrical Engineer, SCR.

Shri Gajanan Mallya, General Manager, South Central Railway inspected Chandragiri Railway station, reviewed the progress of works and discussed o­n further developmental plans of the station with Officials. He inaugurated a 15 KWp Solar Plant for Net Zero Energy Station at Chandragiri Railway Station.

Later, he inspected Road Over Bridge (ROB) in Tirupati – Katpadi Section along with inspection of Level Crossing gate and Bridge. The General Manager inspected new crossing station and interacted with Track Maintainers at Bommasamudram Railway station.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit