For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (PNVT)Pancharatna to (HYB)HYDERABAD DECAN


Address: Makri Rail Station , Dist - Goalpara Assam

Station Code: PNVT

Station Name: Pancharatna

Zone: NFR/Northeast Frontier

Train Frequency Weekly: 37

Station Traffic: Low

Address: Hyderabad, Public Garden Road, Nampally, Hyderabad, Andhra Pradesh 500004, India

Station Code: HYB

Station Name: HYDERABAD DECAN

Zone: SCR/South Central

Train Frequency Weekly: 241

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
07150KYQ SC SPECIALGLPT07:30SC09:1549:45M2A,3A,SL,GN,07150 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
08119-03-2023
Maligaon
Meghalaya gets Electric trains for the first time; Electrification of sections between Abhayapuri – Pancharatna; Dudhnai – Mendipathar completed successfully

N.F. Railway is progressing at full throttle for achieving the Indian Railways target of becoming Net Zero Carbon Emitter by 2030. In an endeavour for complete electrification, N.F. Railway has achieved another milestone by commissioning Dudhnai - Mendipathar (22.823 Track Kilometre) single line section and Abhayapuri – Pancharatna (34.59 Track Kilometre) double line section o­n 15th March, 2023. The Central Organization for Railway Electrification (CORE) has carried out the electrification works in these sections.

 Mendipathar is the o­nly railway station in the north-eastern state of Meghalaya which is in operation since 2014 after being inaugurated by the Hon’ble Prime Minister of India. After commissioning of electric traction, trains hauled by electric locomotive will now be able to operate directly from Mendipathar in Meghalaya which will increase the average speed. More passenger & freight carrying trains will be able to operate through these sections with full sectional speeds. Punctuality will also increase in this section. Parcel & freight carrying trains hauled by electric locomotives from other states will be able to reach Meghalaya directly.

Electrification will significantly improve the mobility of trains in Northeast India.  In addition to the reduction in pollution due to the shift from fossil fuel to electricity, the efficiency of the Railway system in the region will also improve. This would facilitate seamless traffic and also save time of the trains moving to and from northeastern states apart from savings in precious foreign exchange.



(Sabyasachi De)
CPRO/N.F.Railway




2
35428-11-2022
Maligaon
Double line between Dudhnai and Dhupdhara stations commissioned to augment sectional capacity significantly

The Commissioner of Railway Safety (CRS)/NF circle has completed the statutory inspection of the newly laid double line between Dudhnai & Dhupdhara stations o­n 24thNovember, 2022.This newly laid second line will be utilized for goods and passenger traffic with maximum speed of 100 km per hour.

The entire length of New Bongaigaon – Kamakhya via Goalpara doubling project is of 176 km. The stretch between Dudhnai to Dhupdhara is of 29.71 km. Speed trial at 122 km per hour was done by the Commissioner of Railway Safety (CRS)/NF circle. Modern technologies like, robust track structure with use of all wide base Pre-Stressed Concrete (PSC) sleepers & Thick Web Switches which is new design of sturdier switches o­n pre-stressed concrete sleepers and can handle higher speeds were used for this double line territory.

 It is to be mentioned here that with the laying of double line, movement of trains can be done in both directions without stop-over crossings at stations which will increase the punctuality of trains. More trains can be run with enhanced speed.

 Earlier 26.43 km section between Abhaypuri to Pancharatna was commissioned o­n 28th July, 2022. o­n completion of this entire section of New Bongaigaon – Kamakhya via Goalpara, the northeast connectivity will be boosted significantly.



(Sabyasachi De)
CPRO/N.F.Railway





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit