0 Trains from (GR)GULBARGA to (ANKL)ANKOLA
Address: Gulbarga Railway Station, Gulbarga City, Karnataka 585102, India
Station Code: GR
Station Name: GULBARGA
Zone: CR/Central
Train Frequency Weekly: 1
Station Traffic: Low
Address: Ankola Railway Station, National Highway 17, Ankola, Karnataka 581314, India
Station Code: ANKL
Station Name: ANKOLA
Zone: KR/Konkan
Train Frequency Weekly: 49
Station Traffic: Low
RECENT NEWS
1
www.cr.indianrailways.gov.in- 2023-05-25
Annual Conference of Operations department of Central Railway conducted today 24/05/23 Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ on 24.5.2023. Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions. The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows- 1) Goods loading- In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR. In year 2022-23- 81.88 million tonne goods loading achieved by CR. In year 2023-24- 90.05 million tonne target of goods loading has been set by CR. 2) Coal loading - Out of above total loading, coal is highest commodity loading. In 2021-22- 39.52 MT loading done. In 22-23- 37.17 MT loading done. In 23-24- target of 40.95 MT coal loading has been set. 3) Cement loading- In 22-23- 7.48 MT loading achieved. In 23-24- target of 8.8 MT is set. Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal. 4) New infrastructures lines completed- -Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23. -Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23. 5) New infrastructure lines under progress- -Nagpur-Wardha 3rd& 4th line -Bhusawal-khandwa 3rd & 4th line -3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad. 6) Parcel loading hubs- Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points. In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning. 7) Improvement of goods sheds under progress- It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed. -Mumbai division- Kalamboli -Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon -Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri. -Pune- Nira, Loni, -Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag. 8) Daily goods train interchange- In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones. In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling. 9) Infrastructural works completed to increase mail express and goods train mobility- -Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div. -OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div. 10) Critical bottleneck infrastructure works completed in year 2022-23- -Daund- Gulbarga doubling -Wardha- Chitoda 2nd cord line -Khapri-Nagpur-Godhani- 20 km automatic signalling system. -Kamshet/pune div- loop lines extention. --- --- --- Date: May 24, 2023 PR No.2023/05/25 This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai. (Shivraj Manaspure) Chief Public Relations Officer 2
www.sr.indianrailways.gov.in- 2023-04-11
Summer Special Trains between Udhna and Mangaluru Jn Western Railway has notified Weekly Special Trains in Udhna – Mangaluru Sector to clear extra rush during summer season as detailed below: Train No. 09057/09058 Udhna – Mangaluru Jn – Udhna Weekly Special Fare Specials: Train No. 09057 Udhna – Mangaluru Jn Weekly Special Fare Special will leave Udhna at 20.00 hrs on 12th, 19th, 26th April, 03rd, 10th, 17th, 24th, 31st May, 07th June, 2023 (Wednesdays) and reach Mangaluru Jn at 19.40 hrs, the next day (9 Services) In return direction Train No. 09058 Mangaluru Jn – Udhna Weekly Special Fare Special will leave Mangaluru Jn at 21.10 hrs on 13th, 20th, 27th April, 04th, 11th, 18th, 25th May, 01st, 08th June, 2023 (Thursdays) and reach Udhna at 21.05 hrs, the next day (9 Services) Coach Composition: 1- AC First Class cum AC Two Tier Coach, 2 – AC Two Tier Coach, 6 - AC Three Tier Coaches, 8 -Sleeper Class Coaches, 3- General Second Class coaches and 1–Second Class (Divyangjan Friendly) & 1- Luggage cum Brake Vans (Total: 22 Coaches) Train No. 09057 Udhna – Mangaluru Jn Weekly Special Fare Special will have and additional stoppage at Bhiwandi Road The details of timings and stoppages of Train No. 09057/09058 Udhna – Mangaluru Jn – Udhna Weekly Special Fare Specials are as follows:
Latest Search
station (SEQ)SEKHA(GR)GULBARGA to (ANKL)ANKOLA(MAS)CHENNAI CENTRAL to (NW)NALWAR(MNM)MANAMADURAI JN to (ILA)SILAIMAN(SEG)SHEGAON to (KTP)Katepurna(BWN)BARDDHAMAN JN to (DGR)DURGAPUR(CD)CHANDRAPUR to (DR)DADAR(MRBL)MURIBAHAL to (JSG)JHARSUGUDA JN(KAPU)Kiratpur to (NDLS)NEW DELHI(KSV)KOSI KALAN to (NDLS)NEW DELHI(tel)tenali jn to (ND)NADIAD JN(BTKP)BHARAT KUP to (SAW)SURIAWAN(TPW)Tirupati West Halt to (GDR)GUDUR JN(KMNC)KUCHAMAN CITY to (MGS)MUGHAL SARAI JN(MALM)MANTHRALAYAM RD to (rc)raichurtrain 22846 train
|