4 Trains from (MKR)MADDIKERA to (SVM)SANVERDAM CHUCH
Address: Maddikera, Andhra Pradesh 518385, India
Station Code: MKR
Station Name: MADDIKERA
Zone: SCR/South Central
Train Frequency Weekly: 91
Station Traffic: Medium
Address: Curchorem, Goa 403706, India
Station Code: SVM
Station Name: SANVERDAM CHUCH
Zone: SWR/South Western
Train Frequency Weekly: 84
Station Traffic: Medium
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.swr.indianrailways.gov.in- 2023-02-09
दकà¥à¤·à¤¿à¤£ पशà¥à¤šà¤¿à¤® रेलवे / SOUTH WESTERN RAILWAY RUNNING OF onE WAY SPECIAL TRAIN BETWEEN TIRUPATI AND MADGAON South Central Railway has decided to run a one - way Special train between Tirupati and Madgaon as per demand to clear extra rush of passengers as detailed below: - Train No. 07451 Tirupati – Madgaon one - way Express Special: - Train No. 07451 Tirupati – Madgaon one - way Express Special will leave Tirupati 11:30 AM on 10.02.2023 (Friday) and reach Madgaon at 05:00 AM on 11.02.2023 (Saturday). Enroute the train will have stoppages at Renigunta, Cuddapah, Yerraguntla, Tadipatri, Gooty, Guntakal, Ballari, Toranagallu, Hosapete, Munirabad, Koppal, Gadag, Annigeri, SSS Hubballi, Dharwad, Alnavar, Londa, Castle Rock, Kulem and Sanverdam Chuch. The train will have a composition of 2 - AC three tier Coaches, 10 - Second Class Sleeper Coaches, 8 - General Second-Class Coaches and 2 - Luggage cum Brake-Vans. The fare of this train will be 1.3 times.Linen/Bedroll will not provide on this train. ತಿರà³à²ªà²¤à²¿- ಮಡಗಾಂವà³à²¨à²¡à³à²µà³†à²µà²¿à²¶à³‡à²·à²°à³ˆà²²à³à²†à²°à²‚ಠಪà³à²°à²¯à²¾à²£à²¿à²•à²°à²¹à³†à²šà³à²šà³à²µà²°à²¿ ದಟà³à²Ÿà²£à³† ಹಾಗೂ ಬೇಡಿಕೆ ಸಲà³à²µà²¾à²—ಿತಿರà³à²ªà²¤à²¿ ಮತà³à²¤à³ ಮಡಗಾಂವ ನಡà³à²µà³† ವಿಶೇಷ ರೈಲೠಓಡಿಸಲೠದಕà³à²·à²¿à²£à²®à²§à³à²¯ ರೈಲà³à²µà³† ವಲಯವೠನಿರà³à²§à²°à²¿à²¸à²¿à²¦à³†. ರೈಲà³à²¸à²‚ಖà³à²¯à³† 07451 ತಿರà³à²ªà²¤à²¿â€“ ಮಡಗಾಂವೠರೈಲà³à²«à³†à²¬à³à²°à³à²µà²°à²¿10, 2023 (ಶà³à²•à³à²°à²µà²¾à²°) ರಂದೠತಿರà³à²ªà²¤à²¿ ನಿಲà³à²¦à²¾à²£à²¦à²¿à²‚ದಬೆಳಿಗà³à²—ೆ 11:30 ಗಂಟೆಗೆ ಹೊರಟà³, ಮರà³à²¦à²¿à²¨ (ಶನಿವಾರ) ಬೆಳಿಗà³à²—ೆ 05:00 ಗಂಟೆಗೆ ಮಡಗಾಂವ ನಿಲà³à²¦à²¾à²£à²•à³à²•à³† ಬಂದೠತಲà³à²ªà²²à²¿à²¦à³†. ಈ ರೈಲà³à²®à²¾à²°à³à²—ದಲà³à²²à²¿à²°à³†à²£à²¿à²—à³à²‚ಟ, ಕಡಪಾ, ಯರಿಗà³à²‚ಟà³à²²à²¾, ತಾಡಿಪತà³à²°à²¿, ಗà³à²¤à³à²¤à²¿, ಗà³à²‚ತಕಲà³, ಬಳà³à²³à²¾à²°à²¿, ತೋರಣಗಲà³à²²à³, ಹೊಸಪೇಟೆ, ಮà³à²¨à²¿à²°à²¾à²¬à²¾à²¦à³, ಕೊಪà³à²ªà²³, ಗದಗ, ಅಣà³à²£à²¿à²—ೇರಿ, ಎಸà³â€Œ.ಎಸà³â€Œ.ಎಸà³à²¹à³à²¬à³à²¬à²³à³à²³à²¿, ಧಾರವಾಡ, ಅಳà³à²¨à²¾à²µà²°, ಲೋಂಡಾ, ಕà³à²¯à²¾à²¸à²²à³â€Œ ರಾಕà³â€Œ, ಕà³à²²à³‡à²‚ ಮತà³à²¤à³ ಸನà³à²µà²°à³à²¡à²‚ ಚರà³à²šà³à²¨à²¿à²²à³à²¦à²¾à²£à²—ಳಲà³à²²à²¿ ನಿಲà³à²—ಡೆಇರà³à²¤à³à²¤à²¦à³†. ಈ ರೈಲಿನಲà³à²²à²¿ 2 ತà³à²°à²¿ ಟೈರà³â€Œ ಎಸಿ ಬೋಗಿಗಳà³, 10 ಎರಡನೇದರà³à²œà³†à²¯à²¸à³à²²à³€à²ªà²°à³ ಕà³à²²à²¾à²¸à³à²¬à³‹à²—ಿಗಳà³, 8 ಸಾಮಾನà³à²¯à²¦à³à²µà²¿à²¤à³€à²¯à²¦à²°à³à²œà³†à²¯à²¬à³‹à²—ಿಗಳà³à²®à²¤à³à²¤à³ 2 ಲಗೇಜà³à²•à²®à³à²¬à³à²°à³‡à²•à³à²µà³à²¯à²¾à²¨à³â€Œà²—ಳಸಂಯೋಜನೆಹೊಂದಿರಲಿದà³à²¦à³, ಈರೈಲಿನದರವೠ1.3 ರಷà³à²Ÿà³ ಹೆಚà³à²šà²¾à²—ಿರà³à²¤à³à²¤à²¦à³†. ವಿಶೇಷ ಸೂಚನೆ ಈರೈಲಿನಲà³à²²à²¿ ಬೆಡà³â€Œ ಶೀಟೠಮತà³à²¤à³ ಹೊದಿಕೆಯ ಸೌಲà²à³à²¯ ಇರà³à²µà³à²¦à²¿à²²à³à²². Aneesh Hegde 2
www.scr.indianrailways.gov.in- 2022-10-21
- Part of Guntur - Guntakal Doubling & Electrification Project The infrastructure development works across South Central Railway have been progressing oÂn fast pace and various sections have been commissioned as part of doubling, tripling & electrification projects during the current financial year. Moving in the same direction, doubling with electrification between Gajjelakonda - Tarlupadu for a distance of 25 Kms has been completed & commissioned by the Zone. The section has been commissioned as part of the Guntur - Guntakal Doubling & Electrification Project. The Guntur - Guntakal Section is vital rail link connecting the coastal belt of Andhra Pradesh State with Rayalaseema region and beyond South. This line passes through Guntur, Prakasham, Palnadu, Nandyal and Kurnool Districts connecting the hinterland areas. Guntur - Guntakal Doubling & Electrification project, with a view to provide seamless transportation and ease the congestion oÂn this section, was sanctioned in the year 2016-17, for a distance of 405 Kms with an estimated cost of Rs 3887 Crores. So far, doubling & electrification between Nallapadu – Satulur (32 kms), Maddikera – Pendekallu - Dhone (58 Kms) and Gajjelakonda - Gundlakamma (37 Kms) has already been completed and commissioned. Now, with the completion of another 25 Kms between Gajjelakonda - Tarlupadu, a total of 152 Kms stretch of doubling works with electrification has been completed oÂn the Guntur – Guntakal section. The works in the balance sections of the project are in fast progress. As part of Doubling & Electrification works, yard remodelling and new signalling arrangements have been done at Gajjelakonda with Electronic Interlocking (EI) system consisting of 51 routes, at Markapur Road with EI system consisting of 42 routes and at Tarlupadu with EI system consisting of 40 routes. The double line section is permitted to operate the trains with the maximum speed of 90 Kmph. Shri Arun Kumar Jain, General Manager (in-charge), SCR complimented the Officials and staff of Construction Organisation & Guntur Division who are involved in the completion of the project. He stated that oÂnce the entire project is completed, it increases overall train handling capacity of the section and improves the potential of running more number of train services through this section.
COMMENTS
NO Comments. Be the first to Comment...
|