0 Trains from (BDWD)BODWAD to (MOO)MUDDANURU
Address: Maharashtra 425310, India
Station Code: BDWD
Station Name: BODWAD
Zone: CR/Central
Train Frequency Weekly: 91
Station Traffic: Medium
Address: Muddanur Railway Station, Muddanur, Andhra Pradesh 516380, India
Station Code: MOO
Station Name: MUDDANURU
Zone: SCR/South Central
Train Frequency Weekly: 77
Station Traffic: Medium
Trains
|
||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||
Since no Direct Trains Try Nearest Via Stations Nearest From (BDWD)BODWAD (mmr)manmad jn 180Kms from (BDWD)BODWAD (kpg)kopargaon 194Kms from (BDWD)BODWAD (pb)puntamba 194Kms from (BDWD)BODWAD Nearest From MOO (sur)solapur jn 426Kms from (MOO)MUDDANURU (mrj)miraj jn 467Kms from (MOO)MUDDANURU (htk)hatkanagale 484Kms from (MOO)MUDDANURU
|
RECENT NEWS
1
www.cr.indianrailways.gov.in- 2023-02-21
General Manager Central Railway inspects Badnera-Bhusaval Section on Bhusaval Division Shri Naresh Lalwani, General Manager, Central Railway inspected Badnera-Bhusaval Section of Bhusaval on 20.2.2023. The General Manager inspected the new lifts and station premises at Amravati where he also visited the coach restaurant and inspected the Sewage Treatment Plant. He also inspected the newly constructed Foot Over Bridge, new Accident Relief Train (ART) Shed, Railway Colony, Health Unit, RPF Thana (Post), Crew Lobby at Badnera. A speed trial run on Badnera-Takli-Kuram section was also conducted. He also inspected curve, level crossing gate on Murtajapur-Katepurna section, Safety & Rajbhasha exhibition at Borgaon. The General Manager inspected the Traction Sub Station (TSS), interacted with Gang at Akola Yard. He also inspected passenger amenities, S&T Real Time Monitoring System, Electronic Interlocking (EI) Learning Centre and station premises at Akola. A speed trial run on Akola-Gaigaon-Paras-Shri KshetraNagjhari section, inspected Mund bridge. Inspection of on-line Monitoring of Rolling stock System (ORMS) on Malkapur-Wadoda Section, TSS on Malkapur-Khamkhed Section, Limited Height Subway (LHS) on Khamkhed-Bodwad Section was also conducted. The General Manager inspected the new Officers’ Transit House, Wheel Lathe Shed in Electric Loco Shed, Badminton Court at Bhusaval. Shri SS Kedia, Divisional Railway Manager, Bhusaval Division, Principal Heads of Departments and Branch officers from Bhusaval Division were also present during the inspection. --- --- Date: February 20, 2023 PR No. 2023/02/25 This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai. (Shivaji Sutar) Chief Public Relations Officer 2
www.scr.indianrailways.gov.in- 2022-12-05
- Annual inspection between Gooty – Kadapa - Renigunta Section Shri Arun Kumar Jain, General Manager, South Central Railway undertook Annual Inspection of Gooty – Renigunta section of Guntakal Division today i.e., 29th November, 2022. He was accompanied by Sri Venkata Ramana Reddy, Divisional Railway Manager, Guntakal Division and other senior officials were also accompanied throughout the inspection. The General Manager inaugurated Sewage Treatment Plant at Gooty Railway Station, reviewed capacity enhancement works of Gooty By-pass line. The General Manager inspected Level Crossing Gate between Gooty –Juturu stations where he examined safety aspects and interacted with the Gateman. He inspected Traction Sub Station and inaugurated solar pump at Level Crossing Gate. He also inspected Road under Bridge and Major Bridge between Juturu – Komali stations. Later, he inspected Tadipatri station, reviewed various passenger amenities, inspected Station Manager’s office, booking office, circulating area and railway colony. He also inspected Kondapuram railway station and watering points at station platforms. Later, he conducted a speed test between Kondapuram – Muddanuru – Yerraguntla sections. Shri Arun Kumar Jain visited Yerraguntla Railway Station, reviewed various passenger amenities, and inspected Station Manager’s office, booking office, circulating area and also interacted with public representatives and organized unions. He inaugurated Park, RPF barracks, new Running Room building, 30KWp solar plant near the station premises. The General Manager declared Yerraguntla railway station as ‘NET ZERO’ energy station. Later, he inspected Minor Bridge & Points between Yerraguntla – Kadapa stations. The General Manager visited Kadapa Railway Station, reviewed various passenger amenities and inspected booking office, circulating area. He inspected Health Unit and inaugurated ‘Miyawaki Model Park’ at Kadapa Railway Station. He also inaugurated New Gym in Railway Institute, Kadapa. Later, Shri A.K.Jain conducted a speed test between Pullampet – Anantarajupet stations to examine the increase of sectional speed capacity to run trains with enhanced speed in the section. He also inspected Level Crossing Gate between Anantarajupet – Koduru stations. Then, the General Manager inspected Koduru station and Goods Shed. (Ch. Rakesh) Chief Public Relations Officer
COMMENTS
NO Comments. Be the first to Comment...
|