2 Trains from (ANB)AMMANABROLU to (RAG)RAIGIR
Address: Ammanabrolu Railway Station, Ammanabrolu, Andhra Pradesh 523180, India
Station Code: ANB
Station Name: AMMANABROLU
Zone: SCR/South Central
Train Frequency Weekly: 113
Station Traffic: Medium
Address: Flyover, Andhra Pradesh, India
Station Code: RAG
Station Name: RAIGIR
Zone: SCR/South Central
Train Frequency Weekly: 54
Station Traffic: Medium
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.sr.indianrailways.gov.in- 2022-11-02
South Western Railway has notified Special trains in Raigir – Bengaluru sector as detailed below: Train No 03205 / 03206 Raigir – SMVT Bengaluru – Raigir Special fare specials via Katpadi and Jolarpettai Junctions Train No. 03205 Raigir – SMVT Bengaluru Special fare special journey commencing on 02nd November, 2022 (Today) from Raigir at 10.00 hrs and reach SMVT Bengaluru at 14.00 hrs on the third day i.e., 04thNovember, 2022 (1 service) ØArrival/ Departure Time at Katpadi Junction is 09.30 hrs / 09.50 hrs on 04.11.2022 ØArrival/ Departure Time at Jolarpettai Junction is 11.05 hrs / 11.10 hrs on 04.11.2022
In the return direction, Train No. 03206 SMVT Bengaluru - RaigirSpecial fare special journey commencing on 05th November, 2022 from SMVT Bengaluru at 11.20 hrs and reach Raigir at 12.00 hrs on the third day i.e., 07thNovember, 2022 ( 1 service) ØArrival/ Departure Time at Jolarpettai Junction is 13.00 hrs / 13.05 hrs on 05.11.2022 ØArrival/ Departure Time at Katpadi Junction is 14.20 hrs / 14.40 hrs on 05.11.2022
Coach Composition:- One - AC 3-Tier Coach, Fourteen - Sleeper Class Coaches and Five - General Second Class, One – Pantry Car (empty condition) and Two - General Second Class (Divyangjan Friendly) & Luggage cum Brake vans (Total: 23)
Follow us (B.Guganesan) Chief Public Relations Officer 2
www.scr.indianrailways.gov.in- 2021-09-14
- To ease freight operations & to accommodate Longer Haul Goods trains - This is the second longer loop over the zone To enhance train operations, ease congestion and to accommodate long haul goods trains with additional wagons than the standard composition, SCR has commissioned a longer loop line at Navabpalem Railway Station of Vijayawada Division located oÂÂn the Grand trunk route of Vijayawada – Visakhapatnam section. This is the second longer loop that has been constructed oÂÂn the Zone, the first oÂÂne being at Bikkavolu station. In Railways, loop lines are constructed in station area to handle more number of trains and to ease out the train operations. Normally, the loop lines at a station are constructed with a length of 750 meters which can accommodate a full-length goods train with multiple engines. With the increasing need to transport huge quantities at a oÂÂne go, it has necessitated to handle longer trains having more number of wagons than the regular composition. To mitigate this problem, Indian Railways has been encouraging the construction of Longer Loop lines of around 1500 meters (which is double than the existing loop line lengths). Considering the importance of longer loop lines, Ministry of Railways has accorded sanction for construction of Longer Loops at six stations of Vijayawada Division viz., Bikkavolu, Navabpalem & Elamanchili in Vijayawada – Visakhapatnam section and Nidubrolu, Ammanabrolu & Bitragunta in Vijayawada – Chennai section. Out of these, now, two longer loops have been commissioned i.e., At Bikkavolu and Navabpalem stations. Works are in the fast progress at the remaining locations. Salient features of Longer Loop line at Navabpalem station v The Electronic interlocking system has been provided with 70 routes. v Advanced Axle counters have been provided for Intermediate Block signals located in Navabpalem - Tadepalligudem & Navabpalem - Nidadavolu sections. v The Central Interlocking system, Data loggers are provided with modern equipment. v Fire alarm facility is provided for enhanced protection. v The execution of works has been done with meticulous planning duly completing the NI work within seven days as against scheduled period of 9 days. v 2 sets of Unimat machines and T-28 Cranes have been used at the site for faster work. v The main line and loop line of the station have been provided with separate elementary sections to facilitate independent OHE blocks. Benefits of Longer Loop Lines v Will accommodate long haul trains like Jai Kisan specials where 2 freight trains are combined and run for quick mobility v Provision for crossing of trains to enable faster movement of trains without too much detention of freight trains v Improves punctuality of passenger trains by avoiding main line regulation of Goods trains v Improves overall train operations. v Reduces the wagon detention and travel expenses. v Enables in handling more number of trains. Shri Gajanan Mallya, General Manger, SCR complimented the officials of Vijayawada Division oÂÂn completion of second longer loop line over the Zone with sincere and dedicated efforts. He instructed the officials to complete the remaining longer loop lines oÂÂn fast pace for overall improvement in operation of freight trains in the busy trunk route section.
COMMENTS
NO Comments. Be the first to Comment...
|