For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








10 Trains from (ALJN)ALIGARH JN to (CH)CHANDAUSI JN


Address: Aligarh, Uttar Pradesh, India

Station Code: ALJN

Station Name: ALIGARH JN

Zone: NCR/North Central

Train Frequency Weekly: 492

Station Traffic: High

Address: Chandausi Jn Railway Station, Chandausi, Uttar Pradesh 202412, India

Station Code: CH

Station Name: CHANDAUSI JN

Zone: NR/Northern

Train Frequency Weekly: 183

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
14163SANGAM EXPRESSALJN03:30CH05:302:00M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,14163 Status
14113ALJN DDN LINKALJN03:30CH05:251:55M,TU,W,TH,F,SA,SUUNRESERVED14113 Status
54391ALJN GJL PASSALJN04:45CH07:302:45M,TU,W,TH,F,SA,SUUNRESERVED54391 Status
14319INDB BARELLY EXPALJN11:00CH13:552:55TH2A,3A,SL,GN,14319 Status
14313BAREILLY EXPALJN11:00CH13:552:55M2A,3A,SL,GN,14313 Status
54351ALJN BE PASSALJN11:30CH14:553:25M,TU,W,TH,F,SA,SUUNRESERVED54351 Status
54353ALJN BE PASSALJN17:45CH20:523:07M,TU,W,TH,F,SA,SUUNRESERVED54353 Status
54461BKI BE PASSALJN23:55CH02:262:31M,TU,W,TH,F,SA,SUUNRESERVED54461 Status
54465FBD BE PASSALJN23:55CH02:262:31M,TU,W,TH,F,SA,SUUNRESERVED54465 Status
54463BKI RKSH PASSALJN23:55CH02:262:31M,TU,W,TH,F,SA,SUUNRESERVED54463 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
04-02-2020
Extension of Temporary Cancellation/ Short Termination/ Short Origination / Partial Cancellation of Trains Due To Traffic Block between Raiwala – Rishikesh Stations on Moradabad Division .

मुरादाबाद मंडल के रायवाला-ऋषिकेश रेलवे स्टेशनों के बीच

यातायात ब्लॉक के कारण रेलगाड़ियां आंशिक रूप से प्रभावित

वीरभद्र-नया ऋषिकेश रेल सेक्शन के वीरभद्र यार्ड की रि-मॉडलिंग और कमीशनिंग के लिए अधिसूचित यात्री ब्लॉक को 19.2.2020 तक बढ़ा दिया गया है । परिणामस्वरूप निम्नलिखित रेलगाड़ियां निम्नानुसार आंशिक रूप से प्रभावित रहेंगी:-

In connection with remodeling of Virbhadra Yard and commissioning of Virbhadra-New Rishikesh section , the earlier notified traffic block period has been extended upto 19.02.2020. Consequently, the following trains will remain temporarily cancelled/ short terminated / short originated  /partially cancelledas under:

CancellationofTrains During Blockब्लॉक के दौरान निरस्त रहने वाली रेलगाड़ियां

Train No. & Name रेलगाड़ी का नम्बर व नाम

Date of Cancellation

तक निरस्त

(from originating station)

24888/24887Ambala Cantt.-Rishikesh-Ambala Cantt. Lnik Exp.

Upto 19.02.2020

54481/54482Haridwar-Rishikesh-Haridwar Passenger

Upto 19.02.2020

54483/54486Haridwar-Rishikesh-Haridwar Passenger

Upto 19.02.2020

Short Termination/Origination/Partial Cancellation of Trains ब्लॉक के दौरान आंशिक रूप से निरस्त रहने वाली रेलगाड़ियां

Train No. & Train Name

रेलगाड़ी का नम्बर व नाम

Train to short terminate at/originate from पर यात्रा समाप्त/से प्रारम्भ

Train Partially Cancelled between Stations

के बीच आंशिक रूप से रद्द

Date from originating station

प्रभावी तिथि

14609 Rishikesh-Shri Mata Vaishno Devi Katra Hemkunt Exp.

 

At/From Haridwar

Haridwar-Rishikesh

Upto 19.02.2020

तक

14610 Sh Mata Vaishno Devi Katra-RishikeshHemkunt Exp.

 

At/From Haridwar

Haridwar-Rishikesh

Upto 18.02.2020

तक

54471 Delhi Jn.-RishikeshPassenger

At/From Haridwar

Haridwar-Rishikesh

Upto 18.02.2020

54463/54464 Chandausi-Rishikesh-Chandausi Passenger

At/From Haridwar

Haridwar-Rishikesh

Upto 19.02.2020

तक

--------------------





2
17-01-2020
North Central Railway reviews Safety, Punctuality, & Infrastructure position and Roadmap -2020 through video conference.

North Central Railway

Headquarter

Public Relations

Prayagraj

No. 11PR/12/2019/Press ReleaseDate:31.12.2019

North Central Railway reviews Safety, Punctuality, & Infrastructure position and Roadmap -2020 through video conference.


On 31.12.19 a video conference by General Manager Sri Rajiv Chaudhry and Principal Head of Departments of NCR held Agra , Allahabad & Jhansi division. In the beginning of video conference new calendar of NCR for year 2020 was unveiled by GM Sri Rajiv Chaudhry along with PHODs of NCR. Calendar of 2020 has focus o­n achievementsof NCR in 2019 and important forte of NCR. After unveiling of calendar safety was first item taken up for review during video conference. GM stressed that counseling of guards needs to be properly structured so as proper track of counseling needs and inputs given can be kept. He said that Guard is very important part of entire safety chain and accountability of guard in ensuring safety needs to be ensured in all divisions . Rationalization of crew link in Mail Express and other high speed trainswas also discussed. GM directed that adequate rest to crew through rationalized crew link must be ensured. Discussing safety of track , GM desired that accurate and adequateplanning of permanent way materialsis essence to process sanction of rails etc. and needs to ensured by all the divisions.
During discussion o­n infrastructure items, GM directed Allahabad division and construction wing that balance work ofTundla Electronic interlocking needs to be completed so as all facilities like additional platform , extended FOB etc. are available to our valued customers o­n priority. Reviewing progress of Line Sah Baba FOB work which is a critical work for Magh Mela 2020 ,Sri Chaudhry advised division to complete the work by First Week of Jan -2020. This work for additional ramp o­n power cabin side will allow use of this FOB more effectively with all passenger enclosures thus easier handling of traffic during main bathing days .Reviewing progress of Govindpuri Electronic Interlockingwork , GM advised that progress needs to be pulled up for early commissioning. Discussing operation of goods train o­n electric traction in Chunar - Chopan section GM desired that more goods trains o­n electric traction needs to be run in this section to ease out main line between Chunar- Pt DeenDayalUpdhyay Jn. GM Sri Rajiv Chaudhry said that despite many constraints team of officers , supervisors and staff from all three divisions and HQ performed par excellence in 2019 o­n all fronts like infrastructure creation , punctuality improvement, successful conduct of Kumbh-2019 etc. and stressed that our focus from safety must not be lost in 2020 as well. Performance of NCR in improving punctuality and infrastructure creation has been exceptionally good in 2019 and its efforts were recognized at highest level duringRailway week award function 2019 held at Umbala.Sri Chaudhry added that 2020 brings newer and stiffer challenges and called upon all Officersand staffto put their best forward to surpass stipulated targets.:


Some of the important works targeted by North Central Railway in 2020 are:

A.Completion of balance 50 Km fencing/ boundary wall in Agra – Palwal section under Agra division which will help immensely in safe and detention free train operation. Gatiman express with maximum speed of 160 Kmph operate in this section and it is fastest train of India.

B.Elimination of manned level crossing is thrust area and NCR shall be replacing 100 manned LCs with ROB 10 Road over Bridges and balance Road under bridgesin 2020.This will substantially improve safety and punctuality in train operation.

C.10 Foot over bridges are planned over NCR for improved safety and passenger amenity.

D.NCR has planned doubling of 110km while it has ambitious target of 118kms and 67 kms. for tripling and quadrupling respectively.

E.To run longer trains NCR is constructing longer loop lines and 07 such longer loops to accommodate two goods trains simultaneously in o­ne loop line are targeted in the year 2020.

F.With commissioning of washing lines at Subedarganj and other works NCR plan to develop it as satellite station from where trains can be originated .

G.Important yard remodeling works at Yamuna Bridge , Kanpur , Manikpuretc are targeted which will add to traffic handling capacity .

H.With targeted auto signaling between Allahabad- Kanpur in 2020 , Entire main line between Gaziabad – Pt. DeendayalUpdhyayJn. shall be with auto signaling thus enhanced capacity for train handling o­n trunk route of New Delhi-Howrah .

I.All qualifying 221 stations of NCR shall be covered under WiFi.

J.Balance mail express trains of NCR shall be converted to LHB stock for enhanced capacity , comfort, speed and safety .

K.With commissioning of more sections of DFC , more goods trains shall be diverted to DFC routes thus enhanced capacity and punctuality for passenger trains.

L.Work o­n 160 Kmph up gradation of New Delhi-Howrah and New Delhi-Mumbai route will start .

M.NCR will march ahead to complete 100% electrification which targeted by 2021.

N.NCR will be making important headway for ETCS level-2 advanced cab signaling system between Bamharuli to Pt. Deendayal Upadhyay jn.

O.More than 10 Electronic interlocking works adding traffic handling capacity and safety are planned in 2020.

P.07 escalators are planned at Allahabad , Aligarh and Tundla.

Q.12 lifts are planned at Allahabad , Kanpur , Vindyachal , Jhansi , Gwalior , Mathura , raja Ki Mandi etc .







COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit