|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
RECENT NEWS
1
www.swr.indianrailways.gov.in- 2022-07-01
दकà¥à¤·à¤¿à¤£ पशà¥à¤šà¤¿à¤® रेलवे / SOUTH WESTERN RAILWAY RESTORATION OF TRAIN No. 11305/11306 SOLAPUR – GADAG - SOLAPUR DAILY EXPRESS Central Railway has decided to restore the services of Train No. 11305/11306 Solapur – Gadag - Solapur Daily Express trains with effect from 15.07.2022 from Solapur and from 16.07.2022 from Gadag. The details of stoppages are as given below: - 1.Train No. 11305 Solapur - Gadag Daily Express will leave Solapur at 11.50 AM daily with effect from 15.07.2022 and arrive Gadag at 07.55 PM on the same day. 2.In return direction, Train No. 11306 Gadag – Solapur Daily Express will leave Gadag at 02.45 AM daily with effect from 16.07.2022 and arrive Solapur at 10.15 AM on the same day. En-route, the train (11305) will have stoppages at Tikekarwadi, Hotgi, Sulerjavalge, Tadwal, Padnur, Lachyan, Indi Road, Chorgi, Nimbal, Kyatanakeri Road, Minchnal, Vijayapura, Ibrahimpur, Jumnal, Honaganahalli, Mulvad, Kalgurki Halt, Kudgi, Basavana Bagewadi Road, Angadgeri Halt, Wandal, Benal Halt, Almatti, Kudala Sangama Road, Sitimani, Jadramakunti, Kadlimatti, Mugalalli, Bagalkot, Guledagudda Road, Badami, Lakhmapur, Hole Alur, Mallapur, Balaganur and Hombal stations. In return direction, the train (11306) will have stoppages at Hombal, Balaganur, Mallapur, Hole Alur, Lakhmapur, Badami, Guledagudda Road, Bagalkot, Mugalolli, Jadramakunti, Kudala Sangama Road, Almatti, Benal Halt, Wandal, Basavana Bagewadi Road, Mulvad, Honaganahalli, Jumnal, Ibrahimpur, Vijayapura, Minchnal, Nimbal, Chorgi, Indi Road, Lachyan, Padnur, Tadwal, Sulerjavalge, Hotgi and Tikekarwadi stations. Coach Composition: The trains to consist of Ten General Second Class Coaches and Two Luggage cum Brake-vans (Total 12 coaches). For details of timings of these trains please visit Indian Railway website www.enquiry.indianrail.gov.in Passengers are advised to follow Covid-19 appropriate behavior for their and other’s safety. Aneesh Hegde Chief Public Relations Officer South Western Railway, Hubballi 2
www.swr.indianrailways.gov.in- 2020-08-10
दकà¥à¤·à¤¿à¤£ पशà¥à¤šà¤¿à¤® रेलवे/ SOUTH WESTERN RAILWAY पà¥à¤°à¥‡à¤¸ विजà¥à¤žà¤ªà¥à¤¤à¤¿/ Press Release No. 178 Dt: 30.07.2020 DOUBLING BETWEEN LACHYAN-HOTGI (33 KM) COMMISSIONED The doubling project from Hotgi-Kudgi-Gadag (284 km) was sanctioned by Railway Board in 2014-15 at an anticipated cost of Rs.1870 Crore. It connects states of Karnataka & Maharashtra through Bijapur & Sholapur districts. Doubling of Kudgi-Hotgi has been taken up under Customer funding model with M/s.NTPC. This is one such project in Indian Railways, wherein Customer/beneficiary of the project is contributing to the cost of project. An amount of Rs.946 Crore has been deposited by M/s.NTPC towards the cost of Doubling of the stretch between Hotgi-Kudgi (134 km) and the remaining amount is funded by Railway for doubling of Kudgi – Gadag section (150 km). This doubling work will increase line capacity and help in avoiding detention to trains waiting for crossing and introduction of additional trains on this route. This will also help in smooth movement of rakes to/from the industries/power plants and will also boost overall economic development of the region. Commissioning of this section will give impetus to movement of passengers and transport of goods between states of Karnataka and Maharashtra. This is an important rail link connecting the cities of Bengaluru and Mumbai. A lot of tourist places like Bagalkot, Bijapur, etc are getting connectivity. This project facilitates Rail connectivity for supply of raw materials & Coal to NTPC plants at Kudgi & Hotgi. Commissioner of Railway safety has inspected Lachyan-Hotgi (33 km) section on 18thMay and section was commissioned by South Western Railway on 29th July along with remodeling of Hotgi yard by Central Railway even in difficult situation of covid pandemic. Two halt stations (Padnur, Sulerjavalge) and one block station (Tadwal) are situated under this section. The track passes through the 670 m long important bridge over River Bhima, the longest bridge in the zone comprising 14 spans of 45.7 m spans is a major achievement. This bridge is designed to fit for 25T axle loading. Currently, speed restrictions are imposed on existing bridge since it is not capable of carrying higher axle loads. The bridge consists of two lines, first line is ready for traffic movement & second line will be ready by October. New bridge will increase speed of goods trains and throughput. As on date 148 Km of track from Wandal - Hotgi is commissioned & entire 284 Km section from Hotgi to Gadag will be completed to double line by 2022. Chief Public Relations Officer South Western Railway, Hubballi
COMMENTS
NO Comments. Be the first to Comment...
|