For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

SAMBALPUR CITY

STATION INFO

Address: Odisha 768001, India

Station Code: SBPY)SAMBALPUR CIT

Station Name: SBPY)SAMBALPUR CITY

Zone: ECoR/East Coast

Total Unique Trains: 18

Train Frequency Weekly: 49

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
18117RAJYA RANI EXP00:0500:105M,TU,W,TH,F,SU2A,3A,SL,GN
12832BKSC GARIB RATH01:0001:055TU,F,SU3A
01661HBJ PURI SPL01:0501:105TU1A,2A,3A,SL,GN
12831BBS GARIB RATH02:0502:105M,W,SA3A
22909BL PURI S F EXP02:3002:355TH2A,3A,SL,GN
18118RAJYA RANI EXP04:3004:355M,TU,W,TH,F,SA2A,3A,SL,GN
19318INDB HUMSAFAR EX07:0007:055W3A
22839ROU BBS SF INT E07:4207:442M,TU,W,TH,F,SA,SUCC,2S,GN
22806ANVT BBS SUP10:0510:105M1A,2A,3A,SL,GN
20817BBS RAJDHANI EXP11:5812:002SA1A,2A,3A
22910PURI VALSAD EXP12:2012:255SU2A,3A,SL,GN
19317PURI HUMSAFAR EX12:2512:305TU3A
58131ROU PURI PASS12:3312:352M,TU,W,TH,F,SA,SUUNRESERVED
58132PURI ROU PASS14:4514:472M,TU,W,TH,F,SA,SUUNRESERVED
20818BUBNESWR RJDHNI15:1515:172SU1A,2A,3A
01662PURI HBJ SPL17:0017:055W1A,2A,3A,SL,GN
22805BBS ANVT SUP EXP17:0017:055SA1A,2A,3A,SL,GN
22840BBS ROU SF INT E18:4018:422M,TU,W,TH,F,SA,SUCC,2S,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
0106-12-2021
Bhubaneswar
ECoR GEARS UP FOR CYCLONE ‘JAWAD’ WITH ADEQUATE SAFETY PRECAUTIONS

 

 Close watch o­n Railway Bridges, Tracks, Yards & Signalling System

 Silt, Vegetation and other obstructions cleared from catch water and side drains

 Close co-ordination with State Govt. officials

 Patrolling at vulnerable locations by deputing patrolmen & Watchmen

 Arrangements to stock sufficient quantities of track maintenance reserve materials

 Constant watch over Meteorological Department advisories

 All satellite phones, hotlines and VHF sets are kept in ready condition. Adequate brake down gangs are being kept in readiness and o­n high alert.

 Additional Control Room, Helpline numbers & Disaster Management Cell to be opened.

                East Coast Railway has done preparations and ground work to meet the challenges posed by Cyclone JAWAD. Taking advantage of the meteorological forecasts and also with the past experiences, ECoR has planned for early restoration of train traffic and railway track, if affected by JAWAD. Round the Clock Disaster Management Cell has been opened at ECoR HQs at Rail Sadan and at Divisional Headquarters at Visakhapatnam, Khurda Road and Sambalpur.

ECoR has also taken steps for NO RISK TO TRAIN TRAFFIC, positioning of Special Teams for early restoration of tracks, overhead equipment, signalling system, etc. DG sets, water tanks, pumps will be kept ready at all important places.

Action has been taken for smooth refund of ticket amount, opening of extra ticket counters and adequate availability of water at stations.

                Addl. General Manager, East Coast Railway Shri Sudhir Kumar today reviewed the preparedness for the cyclone in a high level meeting at ECoR’s headquarters. He directed the concerned officials to be fully alert towards any incident like flood situation near Railway Track and to ensure safety of trains and smooth train operations. Shri Kumar also directed to keep emergency power supply in ready position and give top priority for the welfare measures of field staff.

Railway Protection Force(RPF) personnel are in touch with NDRF for emergency requirements. Security has been tightened at all stations and Colony areas with deployment of RPF jawans. Diesel locomotives have been placed for train movements in emergency situations. Identification of water logging locations and vulnerable areas has been done.

                Arrangements have been made to stock sufficient quantity of track & bridge repair reserve materials, viz., boulders, sand, cinder, quarry dust, ballast at identified locations. The Engineering relief vans and their equipment are kept ready. Bridge materials are kept in readiness, so that they can be moved as per requirement. ECoR is in constant touch with the Indian Meteorological Department for getting updated weather alerts.

 





2
0106-12-2021
Bhubaneswar
ECoR: THE MOST PROFITABLE ZONE IN INDIAN RAILWAYS


•          FIRST RAILWAY ZONE TO ACHIEVE MORE THAN 150 MT LOADING IN THIS FISCAL

•          ECoR LOADED 22 % MORE THAN LAST YEAR TILL NOVEMBER

•          HIGHEST LOADING OF 19.71 MT IN THE MONTH OF NOVEMBER

During the period from 1st April to 30th November, 2021 East Coast Railway has loaded 150.56MT of freight as against 123.72MT carried in the corresponding period of last fiscal. With this, it has loaded 26.84MT incremental cargo during the current financial year by registering an increase of 22%.

During the period, 100.65 MT of freight carried from Khurda Road Division, 42.15 MT of freight from Waltair Division and 7.76 MT of freight carried from Sambalpur Division.

In the month of November itself, the zone also loaded 19.71 MT of freight as against 18.84 MT carried in the corresponding month last year with an increase of 5% in loading.

The zone has also surpassed the loading target 145.53MT fixed by the Railway Board during the period. This could be possible due to outstanding performance of all the three Divisions of East Coast Railway, i.e. Khurda Road, Waltair and Sambalpur. During the period, ECoR has loaded 84.93MT of Coal, 5.25MT of Raw material for Steel Plants, 14.06 MT of Iron & Steel, 20.37MT of Iron Ore, 0.75MT of Cement, 1.98MT of Food Grains, 3.39MT of Fertilizer, 1.74MT of POL, 2.73MT of freight loaded in Containers and 14.96MT of other cargo.

Major contributors of freight include Talcher, Paradeep, Dhamara, Visakhapatnam, Gangavaram, Nayagarh area, KK Line, Steel Plants, Aluminium plants and from other places of ECoR jurisdiction.


--







COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search