OBULAVARIPALLI

STATION INFO

Address: Obulavaripalli Station, Obulavaripalli, Andhra Pradesh 516108, India

Station Code: OBVP)OBULAVARIPALL

Station Name: OBVP)OBULAVARIPALLI

Zone: SCR/South Central

Total Unique Trains: 10

Train Frequency Weekly: 61

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
12794RAYALASEEMA EXP04:4904:501M,TU,W,TH,F,SA,SU2A,3A,SL,GN
12797VENKATADRI EXP05:4905:501M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
17416HARIPRIYA EXP06:1306:152M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
57274TPTY UBL PASS07:2907:301M,TU,W,TH,F,SA,SUSL,GN
56011AJJ HX PASS10:4810:491M,TU,W,TH,F,SA,SUUNRESERVED
56012HX AJJ PASS16:1916:201M,TU,W,TH,F,SA,SUUNRESERVED
12793RAYALASEEMA EXP17:2917:301M,TU,W,TH,F,SA,SU2A,3A,SL,GN
57273UBL TIRUPATI PAS19:1919:201M,TU,W,TH,F,SA,SUSL,GN
12798VENKATADRI EXP19:5419:551M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
17415HARIPRIYA EXP22:1422:151M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.342/2019-2023-07-2019
Secunderabad
SCR Earns National Recognition for Best Performance in Closure of all UMLC’s & Record Electrification


South Central Railway won appreciation from Shri Piyush Goyal, Hon’ble Minister of Railways for the best performance in closure of all Unmanned Level Crossings and record performance in Electrification of the track. Shri Suresh Angadi Channabasappa, Hon’ble Minister of State for Railways presented the certificates of appreciation to Shri Gajanan Mallya, General Manager, South Central Railway during regional function of 64the Railway Week Awards held Ambala, Harayana. Shri Manohar Lal Khattar, Hon’ble Chief Minister of Harayana State and Shri Vinod Kumar Yadav, Chairman Railway Board were present o­n the occasion.

Shri Gajanan Mallya presented the certificate of appreciation in recognition of closing the all UMLCs to Shri K.V. Siva Prasad, Principal Chief Engineer, SCR and Certificate of appreciation for record electrification to Shri A.A. Phadke, Principal Chief Electrical Engineer, SCR today i.e. 23rd July, 2019 at Rail Nilayam, Secunderabad.

Closure of UMLCs o­n Mission Mode:

South Central Railway was having 288 Unmanned Level Crossings (UMLC’s) as o­n 1st April 2017. A policy decision was taken by Ministry of Railways in 2017 to eliminate all UMLCs existing in the railway system. South Central Railway took up this challenging task o­n a mission mode, instead of manning all the Level Crossings (LCs) this railway took up the work of providing Limited Height Subway (LHS) or Road Under Bridge (RUB) at 180 LC locations.

As the work of providing LHS/RUB under running tracks is a daunting and time-consuming task, innovative methods were adopted to construct these LHS/RUBs o­n a fast track mode. Pre-Cast Box segments were used and inserted into the track near LC locations by deploying high capacity road cranes of 200 Tons capacity. To reduce the block time required for insertion of pre cast boxes, temporary steel girders were inserted beforehand with improved methodology so as to take up earth work excavation for placing the box segments in position. During the year 2017-18 and 2018-19 a total of 84 LHS and 96 RUBs were constructed. Balance Unmanned LCs were eliminated by other modes like manning, direct closure and diversion of traffic to nearest LCs. o­n account of the above efforts all unmanned LCs o­n South Central Railway were eliminated by October 2018 which include 151 LCs in year 2018-19 alone.

Record Electrification:

South Central Railway has taken to electrification of its network o­n a priority basis. The zone has lent a big push to electrification projects, targeting completion and commissioning of various projects during the last two years. A total length of 432 Route Kilometers has been electrified during the financial year of 2018-19.

The sections electrified during 2018-19 o­n South Central Railway are, the Obulavaripalli – Venkatachalam 87 Route Kilometers, Guntakal – Kalluru 38 Route Kilometers, Bellary – Guntakal 45 Route Kilometers, Siripuram – Pondugula 83 Route Kilometers, Kukkadam – Pagidipalli 102 Route Kilometers, Vishnupuram – Janpahad 08 Route Kilometers, Peddapalli – Gangadhara 55 Route Kilometers, Telapur – Ramachandrapuram 06 Route Kilometers.





2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.280/2019-2005-07-2019
Secunderabad
Longest Electrified Tunnel over Indian Railways Commissioned Between Cherlopalli and Rapuru Stations of SCR



South Central Railway has added yet another feather in its cap by commissioning the longest electrified Tunnel. The tunnel, an engineering marvel measuring 6.6 Kms, is situated between Cherlopalli and Rapuru stations and is part of the recently completed Obulavaripalli – Venkatachalam new railway line.Two freight trains have successfully run o­n 25th June, 2019 marking the full-scale Operation of the newly built electrified railway line between the two stations, thereby opening up viable rail connectivity between Krishnapatnam Port and its hinterland for Goods train services.

Construction of the longest tunnel between Cherlopalli and Rapuru was the major challenge for commissioning of this important and vital railway link. Completion of this tunnel in a record time enabled Railways to start freight operations o­n this important railway line, which has reduced the distance between Krishnapatnam Port and hinterland areas by 60 kms. At present, the average travel time taken by goods train from Krishnapatnam Port to Obulavaripalli is 10 hrs. o­n the newly commissioned line, the travel time gets reduced to about 5 hours, which will result in a saving of travel time by 5 hours.

The construction of this tunnel paved the way to operate freight trains in Obulavaripalli - Venkatachalam - Krishnapatnam Port new railway line for a distance of 113 Kms. The section is now notified for commercial freight operations as well.

Shri Gajanan Mallya, General Manager, SCR appreciated the efforts of railway officials and staff involved in completion of this tunnel in a record time of 43 months. The General Manager opined that, it is a matter of pride for the zone to have such remarkable structure. The newly constructed railway line is also helpful for decongestion of traffic o­n Vijayawada - Gudur Main line, he added.

Salient Features of Tunnel:

· Located between Cherlopalli to Rapuru stations and constructed in shape of ‘Horse Shoe’.

· New Australian Tunneling Method(NATM) is used and the cost incurred is Rs.460 crores

· Length of the tunnel is 6, 660 mts and is in straight alignment.

· The height of tunnel (rail level to roof) is 6.5 meters and the minimum height of contact wire is maintained at 5.2 meters.

· Ballast less Track is constructed with Bi-block sleepers and Vaslo fittings

· Full length lining is provided with 300 mm thickness

· Two nos. of traction power supply substations are provided near Cherlopalli and near Adurupalli with necessary switching stations in between.

· OHE maintenance depot is provided at Rapuru along with tower-car shed.

· LED lighting provided at 10 m intervals inside the tunnel

· Conventional OHE has been provided with a maximum span of 36 m and maximum tension length of 1206 m. Brackets for supporting OHE have been fixed o­n wall mounted type plate fittings, which are fixed to the tunnel lining concrete.

· Spring type Auto Tensioning Device (ATD) of South Korean make is adopted in place of conventional type ATD for maintaining necessary tension in OHE wires, for the first time in SCR.

· Fail safe earthing arrangements are provided for safety of personnel working in tunnel.

This longest electrified tunnel is pivotal in the new railway line between Venkatachalam and Obulavaripalli and is a game changer in the freight operations of the zone. This new line facilitates direct & viable connectivity between South Coast and West Coast and enhances the freight basket of South Central Railway.