2 Trains from (LKO)LUCKNOW NR to (MJA)MEJA ROAD
Address: Lucknow Railway Station, Kanpur Road, Railway Colony, Charbagh, Lucknow, Uttar Pradesh, India
Station Code: LKO
Station Name: LUCKNOW NR
Zone: NR/Northern
Train Frequency Weekly: 860
Station Traffic: High
Address: Uttar Pradesh 212305, India
Station Code: MJA
Station Name: MEJA ROAD
Zone: NCR/North Central
Train Frequency Weekly: 95
Station Traffic: Medium
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.scr.indianrailways.gov.in- 2022-04-04
In order to clear extra rush during summer season, South Central Railway will run 26 summer special trains between Hyderabad – Gorakhpur - Hyderabad as detailed below:
I.Train No. 02575/02576 Hyderabad – Gorakhpur – Hyderabad special train : (26 services) These Special Trains will stop at Secunderabad, Kazipet, Peddapalli, Mancherial, Balharshah, Nagpur, Itarsi, Bhopal, Bina, Virangana Lakhshmibai, Orai, Pokhrayan, Kanpur,Aishbagh, Lucknow City, Barabanki Station and Gonda Railway stations in both the directions (Note: Train No.02575 will not stop at Barabanki Station) . These tarins consist of AC II tier, AC III tier and Sleeper class coaches 2
www.ncr.indianrailways.gov.in- 2022-01-11
उतà¥â€à¤¤à¤° मधà¥â€à¤¯ रेलवे जनसमà¥â€à¤ªà¤°à¥à¤• कारà¥à¤¯à¤¾à¤²à¤¯ उतà¥â€à¤¤à¤° मधà¥â€à¤¯ रेलवे,पà¥à¤°à¤¯à¤¾à¤—राज पतà¥à¤°à¤¾à¤‚क: 11पीआर/01/2022 पà¥à¤°à¥‡à¤¸ विजà¥à¤žà¤ªà¥à¤¤à¤¿à¤¦à¤¿à¤¨à¤¾à¤‚क: 10.01.2022 NCR makes giant stride towards electrification 92% of NCR’s broad gauge network is now electrified With the electrification of Shikohabad-Mainpuri section on 31st December, total electrified route km in NCR now stands at 2933 Electrification of 5 major routes completed in calendar year 2021. Aggressively pursuing towards mission 100% electrification, NCR completed a total of 216 Route Kilometer & 314 Track Kilometer of electrification between April-December'2021. Major routes which have been electrified during first three quarters of current financial year are: Birlanagar-Udimor (101 km) Mahoba-Khajuraho (64 km) Shikohabad-Mainpuri (51 km) In addition, newly laid double line between Chaunrah-Malasa (19 km), Nandkhas-Parauna (32 km) (both part of Bhimsen-Jhansi doubling project) and third line between Babina- Jhansi (24 km) are opened along with electrification. At present, NCR has 2933 electrified Route Km and 6313 electrified track kilometers. ·Electrification works completed in NCR during calendar year 2021 are: 1.Bharatpur- Bandikui (97.5 km) 2.Bhandai- Etawah (114 km) 3.Mahoba-Khajuraho (64 km) 4.Birlanagar-Udimor (101 km) 5.Shikohabad-Manipuri (51km) In addition to above major routes, electrification works of sidings like Chunar, Churk, Meja NTPC, Shankargarh have also been completed. As a result of massive electrification, need for traction changing from AC engine to diesel engine is now done away at these places thereby reducing detentions and increasing mobility and punctuality. With a total broad gauge network of 3222 route kilometers in NCR, electrified route km (2933) now stands at 91% of overall broad gauge network of NCR. Electrification of remaining routes like Khajuraho-Udaipura, Barhan-Etah and Etawah-Mainpuri-Farrukhabad is targeted to be completed this year.
COMMENTS
NO Comments. Be the first to Comment...
|