For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








2 Trains from (ANB)AMMANABROLU to (GVI)GARIVIDI


Address: Ammanabrolu Railway Station, Ammanabrolu, Andhra Pradesh 523180, India

Station Code: ANB

Station Name: AMMANABROLU

Zone: SCR/South Central

Train Frequency Weekly: 113

Station Traffic: Medium

Address: Garividi Railway Station, Garividi, Andhra Pradesh 535101, India

Station Code: GVI

Station Name: GARIVIDI

Zone: ECoR/East Coast

Train Frequency Weekly: 69

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
12840HOWRAH MAILOGL03:45CPP14:4811:03M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,12840 Status
17480TPTY PURI EXPANB15:18SGDM06:5415:36M,TU,W,F,SA2A,3A,SL,GN,17480 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.857/2022-2307-02-2023
Secunderabad
PR No. 857 - Special Trains Between various Destinations

         

In order to clear extra rush, South Central Railway will run Dailyspecial Trains between various destinations as detailed below:-

Sl.

Tr. No.

From - To

Dep.

Arr.

With effect from

1

07466

Rajahmundry - Visakhapatnam

09.20

14.50 (same day)

14.02.2023

2

07467

Visakhapatnam – Rajahmundry

18.20

23.35 (same day)

15.02.2023

3

07468

Visakhapatnam – Vizianagaram

18.30

19.50 (same day)

14.02.2023

4

07469

Vizianagaram – Visakhapatnam

06.10

07.30 (same day)

15.02.2023

5

07470

Visakhapatnam – Palasa

07.50

13.00 (same day)

14.02.2023

6

07471

Palasa – Visakhapatnam

13.30

17.50 (same day)

15.02.2023



Train No. 07466/07467 Rajahmundry – Visakhapatnam – Rajahmundry Special Trains:


These special trains will stop at Kadiyam, Dwarapudi, Anaparthi, Bala Bhadrapuram, Bikkavolu, Medapadu, Samalkot, Pithapuram, Gollaprolu, Durgada Gate, Ravikampadu, Annavaram, Timmapuram, Hamsavaram, Tuni, Bullipadu, Narsingapalli, Kasimkota, Anakapalle, Duvvada and Marripalem halt stations in both the directions.

 

Please note – Train No. 07466 Rajahmundry – Visakhapatnam will also stop at Bayyavaram and Thadi stations.

 

Train No. 07468/07469 Visakhapatnam – Vizianagaram – Visakhapatnam Special Trains:


These special trains will stop at Marripalem, Simhachalam, Pendurthi, Kottavalasa, Kantakapalle, Alamanda and Korukonda stations in both the directions.

 

 

Train No. 07470/07471 Visakhapatnam – Palasa – Visakhapatnam Special Trains:


These special trains will stop at Marripalem, Simhachalam, Pendurthi, Kottavalasa, Kantakapalle, Alamanda, Korukonda, Viziangaram Jn, Nellimarla, Garividi, Chipurupalli, Batwa, Sigadam, Ponduru, Dusi, Srikakulam Road, Urlam, Tilaru, Harischandrapuram, Kotabommali, Dandugopalapuram, Naupada, Rautpuram, and Pundi stations in both the directions.

 



(Ch. Rakesh)
Chief Public Relations Officer




2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.409/2021-2214-09-2021
Secunderabad
SCR Commissions Longer Loop Line at Navabpalem Station




- To ease freight operations & to accommodate Longer Haul Goods trains

- This is the second longer loop over the zone

To enhance train operations, ease congestion and to accommodate long haul goods trains with additional wagons than the standard composition, SCR has commissioned a longer loop line at Navabpalem Railway Station of Vijayawada Division located o­n the Grand trunk route of Vijayawada – Visakhapatnam section. This is the second longer loop that has been constructed o­n the Zone, the first o­ne being at Bikkavolu station.

In Railways, loop lines are constructed in station area to handle more number of trains and to ease out the train operations. Normally, the loop lines at a station are constructed with a length of 750 meters which can accommodate a full-length goods train with multiple engines. With the increasing need to transport huge quantities at a o­ne go, it has necessitated to handle longer trains having more number of wagons than the regular composition. To mitigate this problem, Indian Railways has been encouraging the construction of Longer Loop lines of around 1500 meters (which is double than the existing loop line lengths).

Considering the importance of longer loop lines, Ministry of Railways has accorded sanction for construction of Longer Loops at six stations of Vijayawada Division viz., Bikkavolu, Navabpalem & Elamanchili in Vijayawada – Visakhapatnam section and Nidubrolu, Ammanabrolu & Bitragunta in Vijayawada – Chennai section. Out of these, now, two longer loops have been commissioned i.e., At Bikkavolu and Navabpalem stations. Works are in the fast progress at the remaining locations.

Salient features of Longer Loop line at Navabpalem station

v The Electronic interlocking system has been provided with 70 routes.

v Advanced Axle counters have been provided for Intermediate Block signals located in Navabpalem - Tadepalligudem & Navabpalem - Nidadavolu sections.

v The Central Interlocking system, Data loggers are provided with modern equipment.

v Fire alarm facility is provided for enhanced protection.

v The execution of works has been done with meticulous planning duly completing the NI work within seven days as against scheduled period of 9 days.

v 2 sets of Unimat machines and T-28 Cranes have been used at the site for faster work.

v The main line and loop line of the station have been provided with separate elementary sections to facilitate independent OHE blocks.

Benefits of Longer Loop Lines

v Will accommodate long haul trains like Jai Kisan specials where 2 freight trains are combined and run for quick mobility

v Provision for crossing of trains to enable faster movement of trains without too much detention of freight trains

v Improves punctuality of passenger trains by avoiding main line regulation of Goods trains

v Improves overall train operations.

v Reduces the wagon detention and travel expenses.

v Enables in handling more number of trains.

Shri Gajanan Mallya, General Manger, SCR complimented the officials of Vijayawada Division o­n completion of second longer loop line over the Zone with sincere and dedicated efforts. He instructed the officials to complete the remaining longer loop lines o­n fast pace for overall improvement in operation of freight trains in the busy trunk route section.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit