For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








2 Trains from (DBG)DARBHANGA JN to (SC)SECUNDERABAD JN


Address: Railway Colony, Darbhanga, Bihar 846009, India

Station Code: DBG

Station Name: DARBHANGA JN

Zone: ECR/East Central

Train Frequency Weekly: 373

Station Traffic: High

Address: Secunderabad, Regimental Bazaar, Secunderabad, Andhra Pradesh, India

Station Code: SC

Station Name: SECUNDERABAD JN

Zone: SCR/South Central

Train Frequency Weekly: 700

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
17008DBG SC EXPRESSDBG07:00SC22:1039:10TU,F2A,3A,SL,GN,17008 Status
17006DBG HYB EXPRESSDBG07:00SC22:4039:40SU2A,3A,SL,GN,17006 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
466/2020-2120-02-2021
Chennai
EXTENSION AND REVISED TIMING OF DAILY SPECIAL


South Central Railway has Notified Extension and Revised timings of daily special as detailed below:

The service of Train No.02759 Tambaram - Hyderabad Daily Superfast Festival Special train will be extended to run o­n and from 02nd April, 2021 with the following Revised timings.

 Train No.02759 Tambaram- Hyderabad Daily Superfast Festival Special train will have the Existing Composition with Revised timings with effect from Journey Commencing o­n 22nd February, 2021 as under:

Station

T.No.02759

Tambaram-Hyderabad

Special Festival Special

Tambaram

(d)

17.00

Chennai Egmore

(a/d)

17.25/17.30

Sullurpeta

(a/d)

19.24/19.25

Nayudupeta

(a/d)

19.48/19.50

Gudur

(a/d)

20.23/20.25

Nellore

(a/d)

20.43/20.45

Kavali

(a/d)

21.23/21.25

Ongole

(a/d)

22.18/22.20

Chirala

(a/d)

23.03/23.05

Tenali

(a/d)

23.55/23.57

Vijayawada

(a/d)

00.45/00.55

Khammam

(a/d)

02.18/02.20

Mahbubabad

(a/d)

03.04/03.05

Warangal

(a/d)

03.55/03.57

Kazipet

(a/d)

04.13/04.15

Secunderabad

(a/d)

06.35/06.40

Hyderabad

(a)

07.50




Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.faceook.com/Southern-Railway-240606622749869/



(B.Guganesan)
Chief Public Relations Officer




2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.609/2020-2118-02-2021
Secunderabad
Shri Gajanan Mallya, General Manager, SCR conducts Annual Inspection of Wagon Workshop, Rayanapadu





- Held performance review meeting with officials

Shri Gajanan Mallya, General Manager, South Central Railway undertook Annual Inspection of Wagon Workshop, Rayanapadu today i.e., 17th February, 2021. He was accompanied by Shri J.K Jain Principal Chief Mechanical Engineer and other senior officials throughout the inspection.

The General Manager commenced the inspection at Wagon Workshop and inaugurated the CCTV monitoring room, First Aid centre, R.O water plant and Ladies rest room. He flagged off the POH BOXN rake and laid foundation stone for a new shed. The General Manager planted saplings towards green environment and inaugurated the supervisors meeting hall cum office complex.

Shri Gajanan Mallya, General Manager, SCR inaugurated the Flexible Roller Conveyer and Liquid Extractor, he inspected the Wagons in Body Repair shop, CBC and Bogie shop, wheel shop and laid the foundation stone for Portal Wheel Lathe. He inaugurated the Optical Spectrometer and Central Control Room and interacted with members of various unions at the administrative office. Later, the General Manager held a performance review meeting with the officials wherein he discussed and advised the officials o­n further developmental plans of the Wagon Workshop.

Later, the General Manager inspected and reviewed the progress of major bridge at Cutlair under construction as part of the third line works between Vijayawada – Kazipet section and carried out a rear window inspection between Kondapalli – Kazipet section. The General Manager inspected the progress of third line works between Kondapalli – Dornakal section.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit