For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (lsi)laheria sarai to (PFR)PACHOR ROAD


Address: Bihar 846001, India

Station Code: LSI

Station Name: LAHERIA SARAI

Zone: ECR/East Central

Train Frequency Weekly: 215

Station Traffic: High

Address: Pachore, Madhya Pradesh 465683, India

Station Code: PFR

Station Name: PACHOR ROAD

Zone: WCR/West Central

Train Frequency Weekly: 45

Station Traffic: Low





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
19166SABARMATI EXPLSI04:45PFR14:3833:53M,W,SA2A,3A,SL,GN,19166 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
No.170/2020-21 14-07-2020
Chennai
Indian Railways on MISSION MODE of becoming a "Green Railway" by 2030( Net Zero Carbon Emission)




 Electrification of all routes o­n Broad Gauge  by December 2023

Solar and wind energy to power the Railway electricity grid in a big way

Indian Railways has completed electrification of more than 40,000 RKM (63% of BG routes)

 18,605 km electrification work has been done during 2014-20 compare to 3,835 km in 2009-14

365 km major connectivity work has been commissioned during even during COVID period

100 MW of Solar plants have been commissioned o­n roof-tops of various buildings including 900 stations; 400 MW are under different stages of execution

Indian Railway has 51,000 hectare of land potential of installing 20 GW land based solar plants

One project of 1.7 MW at Bina  in collaboration with BHEL has already been installed

In the Wind Energy sector, 103 MW wind-based power plants have already been commissioned; planned to set up 200 MW wind energy plants in next 2 years in Tamil Nadu, Gujarat, Rajasthan and Karnataka

100 per cent LED illumination of buildings and stations

Total 505 pairs of trains have been converted to HOG, unleashing approx 70 million liter diesel/ Rs 450 crore per annum potential of saving

A total of 69,000 coaches have been fitted with 2, 44,000 bio-toilets in Indian Railways


Ministry of Railways, with a goal of transforming Indian Railways into Green Railways by 2030 has taken a number of major initiatives towards mitigation of global warming and combating climate change. Railway Electrification, improving energy efficiency of locomotives & trains and fixed installations, green certification for installations/stations, fitting bio toilets in coaches and switching to renewable sources of energy are parts of its strategy of achieving net zero carbon emission.

Indian Railways has completed electrification of more than 40,000 Route km (RKM) (63% of BG routes) in which 18,605 km electrification work has been done during 2014-20. Previously, o­nly 3,835 km electrification work was completed during the period 2009-14. Indian Railways has fixed a target of electrification of 7000 RKM for the year 2020-21. All routes o­n BG network have been planned to be electrified by December 2023. Indian Railways is focusing o­n electrification of last mile connectivity & missing links. With this in mind 365 km major connectivity work has been commissioned during COVID period.

Major connectivity commissioned during COVID  period like Katni-Satna section (99 RKM) of Mumbai-Howrah via Allahabad route has been commissioned providing an alternate route to Howrah. Likewise, Pachore-Maksi (88 RKM) section o­n Indore - Guna-Bina route has also been commissioned providing an alternate route to Maksi-Bhopal-Bina. o­n Howrah/Sealdah-SVD Katra via Patna route, Bhagalpur-Shivnarayanpur (45 RKM) section has been commissioned.  o­n the route connecting Kariakal port to coal, fertilizer & steel plants of Tamil Nadu & Andhra Pradesh, Thiruvarur - Karaikal port (46 RKM) section has been commissioned providing port connectivity to Erode, Coimbatore & Palghat.

Indian Railways has also taken a number of initiatives to promote solar energy. Indian Railways is working to harness the potential of 500 Mega Watt (MW) energy through roof top Solar panels (Developer model). Till date, 100 Mega Watt (MW) of solar plants have been commissioned o­n roof-tops of various buildings including 900 stations. Solar plants with a combined capacity of 400 MW are under different stages of execution. Tenders are already awarded for 245 MW and target for completion of these plants is December 2022.  

Besides this, Indian Railways is trying to produce power from land Based Solar installations for running trains. Indian Railway has 51,000 hectare of land potential of installing 20 GW land based solar plants. The Solar power so generated will be fed to Central / State Grid or directly to 25 kV AC traction system.  Railway Energy Management Company Limited (REMCL), a Joint Venture Company of Indian Railways (49 % Equity) and RITES Limited (51 % Equity), has been mandated for proliferation of taking up land based project.

One project of 1.7 MW at Bina (Madhya Pradesh) in collaboration with Bharat Heavy Electricals Limited (BHEL) has already been installed and is presently under extensive testing. This is First of its kind of solar project in the world.

Initially for the Land Based Solar Projects, Indian Railways has taken up 3 GW Solar Project in three phases. In phase I tender has been floated under developer model o­n 29th April 2020 for 1.6 GW capacities in railway plots for open access states. In Phase II, 400 MW capacities in railway plots will be developed for non open access States under ownership model of REMCL (captive use). For this tender has floated o­n 16th June 2020. In Phase III 1 GW capacity in railway plots along the tracks under developer model will be installed for open access States for which tender has been floated o­n 1st July2020.

In the wind energy sector, 103 MW wind-based power plants have already been commissioned. Among them, 26 MW is in Rajasthan (Jaisalmer), 21 MW is in Tamil Nadu and 56.4 MW is in  Maharashtra (Sangli). Indian Railways has also planned to set up 200 MW wind energy plants in next 2 years in Tamil Nadu, Gujarat, Rajasthan and Karnataka.  

Realizing its role in climate change Indian Railways has started other Green Initiatives like 100 per cent LED illumination of buildings and stations. Indian Railways has also acquired Green Certification from CIII to 7 Production Units (PUs), 39 Workshops, 6 Diesel sheds and 1 Stores depot. 14 Railway Stations and 21 other buildings/ campuses have also been Green certified. Other than this 215 Stations have been certified with Environment Management System (EMS)/ISO 14001.

Total 505 pairs of trains have been converted to Head o­n Generation(HOG), unleashing approx 70 million liter diesel/ Rs 450 crore per annum potential of saving.  Energy Efficiency Studies of all 8 Production Units & 12 workshops have been completed under MOU with CII resulting in 15% improvement in energy efficiency.

In the field of Green Initiatives a total of 69,000 coaches have been fitted with more than 2,44,000 bio-toilets in Indian Railways.

***

PIB Courtesy 


(D. Om Prakash Narayan)
Sr.PRO




2
2019/05/2431-05-2019
Continuation of Experimental Halts.

Central Railway

Press Release

Continuation of Experimental Halts.

Railways have extended the experimental halts already provided to the following trains till further advice. The details are as under:-

Sr.

No.

Train No.

Train Name

Station

1

11093/11094

Chhatrapati Shivaji Maharaj Terminus Mumbai-Varanasi Mahanagari Express

Raver

2

12715/12716

Nanded-Amritsar Sachkhand Express

Pachora

3

11093/11094

Chhatrapati Shivaji Maharaj Terminus Mumbai-Varanasi Mahanagari Express

Chalisgaon

4

12720/12719

Hyderabad-Jaipur Express

Malkapur

5

17623/17624

Nanded-Shri Ganganagar Express

Malkapur

6

11019

Chhatrapati Shivaji Maharaj Terminus Mumbai -Bhubaneshawar Konark Express

Thane

7

11025/11026

Bhusaval-Pune Express

Niphad

8

11401/11402

Chhatrapati Shivaji Maharaj Terminus Mumbai-Nagpur Nandigram Express

Lasalgaon

9

16381

Chhatrapati Shivaji Maharaj Terminus Mumbai- Kanyakumari Express

Thane

10

11075/11076

Lokmanya Tilak Terminus-Bidar Express

Barsi Town

11

11139/11140

Chhatrapati Shivaji Maharaj Terminus Mumbai-Gadag Express

Thane

12

22137/22138

Nagpur-Ahmedabad Express

Shegaon

13

22663/22664

Chennai Egmore -Jodhpur Express

Shegaon

14

22619/22620

Bilaspur-Tirunelvali Express

Chandrapur

15

18501/18502

Vishakhapatnam-Gandhidham Express

Chandrapur

16

17609/17610

Patna-Purna Express

Warora

17

16863/16864

Bhagat Ki Kothi - Mannargudi Express

Chandrapur

18

19713/19714

Jaipur-Secunderabad Express

Morshi

19

19301/19302

Indore-Yeshwantpur Express

Warud Orange City

20

16209/16210

Ajmer-Mysore Express

Kirloskarwadi

21

16505/16506

Gandhidham-Bangalore Express

Kirloskarwadi

22

11059/11060

Lokmanya Tilak Terminus -Chhapra Express

Nasik Road

23

12771/12772

Secunderabad –Nagpur Superfast Express

Ajni

24

11403/11404

Nagpur-Kolhapur Express

Ajni

25

12849/12850

BSP-Pune Superfast Express

Pulgaon

26

12113/12114

Pune-Nagpur Garibrath Express

Ajni

27

12113/12114

Pune-Nagpur Garibrath Express

Shegaon

28

22663/22664

Chennai Egmore-Jodhpur S/F Express

Bhandak

29

11045/11046

Kolahapur-Dhanbad Deekshabhoomi Express

Wani

30

22937/22938

Rajkot-Rewa Superfast Express

Burhanpur

31

22135/22136

Nagpur-Rewa-Nagpur Superfast Express

Multai

32

12643/12644

Thiruvananthapuram-Hazrat Nizamauddin Swarn Jayanti Express

Amla

33

12791/12792

Secunderabad–Danapur- Secu

COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit