For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (PFR)PACHOR ROAD to (lsi)laheria sarai


Address: Pachore, Madhya Pradesh 465683, India

Station Code: PFR

Station Name: PACHOR ROAD

Zone: WCR/West Central

Train Frequency Weekly: 45

Station Traffic: Low

Address: Bihar 846001, India

Station Code: LSI

Station Name: LAHERIA SARAI

Zone: ECR/East Central

Train Frequency Weekly: 215

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
19165SABARMATI EXPPFR08:25LSI18:2934:04W,F,SU2A,3A,SL,GN,19165 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
2022/1212-12-2022
Mumbai
WR EXTENDS TRIPS OF TRAIN NO. 09117/18 SURAT-SUBEDARGANJ SPECIAL TRAIN


WR EXTENDS TRIPS OF TRAIN NO. 09117/18
SURAT-SUBEDARGANJ SPECIAL TRAIN

For the convenience of passengers and with a view to meet the travel demand, Western Railway has extended the trips of Train No. 09117/18 Surat – Subedarganj Weekly Special Train o­n Special Fare o­n the same timings and path.

According to a press release issued by Shri Sumit Thakur – Chief Public Relations Officerof Western Railway, details of these trains are as under:

Train No. 09117/18 Surat – Subedarganj Weekly Special

Train No. 09117 Surat – Subedarganj Weekly Special which was notified up to 16th December 2022 will also now run o­n 23rd and 30th December 2022. Similarly, Train No. 09118 Subedarganj – Surat Weekly Special which was notified up to 17th December, 2022 will also now run o­n 24thand 31st December 2022. Enroute this train will halt at Bharuch Jn, Vadodara Jn, Dahod, Ratlam Jn, Ujjain Jn, Maksi Jn, Shajapur, Pachor Road, Biyavra Rajgarh, Ruthiyai, Guna, Badarwas, Shivpuri, Gwalior Jn, Malanpur, Soni, Bhind, Etawah, Govindpuri and Fatehpur stations in both directions. This train comprises of AC 3-Tier and Sleeper Class coaches.

The booking of extended trips of Train Nos. 09117 will open from 14th December, 2022 at PRS counters & o­n the IRCTC website. For detailed information regarding the timings of halts and composition, passengers may please visit www.enquiry.indianrail.gov.in

*******






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit