For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (bau)burhanpur to (MBA)MAHOBA


Address: Lalbagh, Burhanpur, Madhya Pradesh 450331, India

Station Code: BAU

Station Name: BURHANPUR

Zone: CR/Central

Train Frequency Weekly: 236

Station Traffic: High

Address: Mahoba Railway Station, Mahoba, Uttar Pradesh 210427, India

Station Code: MBA

Station Name: MAHOBA

Zone: NCR/North Central

Train Frequency Weekly: 135

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
22129TULSI EXPRESSBAU12:50MBA02:5314:03TU,SU2A,3A,SL,GN,22129 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
08-02-2023
Highest Ever Allocation for Uttar Pradesh in a Year 2023-24- 17507 Crores

Record Allocation for Uttar Pradesh

Highest Ever Allocation for Uttar Pradesh in a Year 2023-24- 17507 Crores

This is 16 times or 1479% more than average of the period-2009-14

Salient Features of Budget 2023-24 for North Central Railway

(Pink Book Highlights for NCR)

 

·Total Budget Plan Outlay for North Central Railway for the year 2023-24 is Rs. 9183.09Crore.

 

·Last year North Central Railway Plan Outlay was Rs. 5123.46 Crore.

 

·There is an increase of Rs. 4059.63 Crore which is approx 80% higher than the last year.

 

Following are the feature of North Central Railway Budget 2023-24:-

 

Major Plan Heads

Description

Remarks

16

Traffic Facilities- Yard remodeling and others

This Financial Year North Central Railway has been allotted Rs. 1626.62 cr. for the work of Traffic Facilities which is 1800% higher than the outlay of last year (2022-23).

30

Road Safety Works- Road Over/ Under Bridges

This Financial Year North Central Railway has been allotted Rs. 739.16 cr. for the work of Road Safety Works ROB/RUB which is 34.40% higher than the outlay of last year (2022-23).

31

Tack Renewals

This Financial Year North Central Railway has been allotted Rs. 800.00 cr. for the work of Tracks Renewal which is 13.15% higher than the outlay of last year (2022-23).

32

Bridge Works, Tunnel Works and Approaches

This Financial Year North Central Railway has been allotted Rs. 40.00 cr. for the work of Bridge which is 99% higher than the outlay of last year (2022-23).

33

Signalling and Telecommunication

This Financial Year North Central Railway has been allotted Rs. 500.00 cr. for the work of Signaling & Telecommunication which is 75.81% higher than the outlay of last year (2022-23).

36

Other Electrical Works, incl TRD

This Financial Year North Central Railway has been allotted Rs. 157.81 cr. for the work of Other Electrical which is 182.22% higher than the outlay of last year (2022-23).

14

Gauge Conversion

This Financial Year North Central Railway has been allotted Rs. 866.30 cr. for the work of Gauge conversion which is 6.95% higher than the outlay of last year (2022-23).

51

Staff Welfare

This Financial Year North Central Railway has been allotted Rs. 27.55 cr. for the work of Staff Welfare which is 9% higher than the outlay of last year (2022-23).

53

Customer Amenities

This Financial Year North Central Railway has been allotted Rs. 779.07 cr. for the work of Customer Amenities which is 428% higher than the outlay of last year (2022-23).

15

Doubling

This Financial Year North Central Railway has been allotted Rs. 2774. 32 cr. for the work of Doubling which is 89.50% higher than the outlay of last year (2022-23).

 

The following sanctioned works have been allotted adequate funds, to speed up the work:-

 

Plan Head

Name of the sanctioned work

Sanctioned Cost

(In Cr.)

Outlay for

2023-24

(In Cr.)

Doubling

Bhimsen-Jhansi (206 Km)

1140.00

50.00

Doubling

Jhansi-Bina 3rd Line (152 km)

1212.00

150.00

Doubling

Mathura-Palwal 4th Line (80 km)

526.00

9.00

Doubling

Mathura-Jhansi 3rd Line(273.80 Km)

2508.00

846.00

Doubling

Mughalsarai-Allahabad(150 Km)

2649.00

350.00

Doubling

Aligarh-Harduaganj Flyover(22 Km)

1179.00

102.00

Doubling

Lalitpur-Birari(15.80)

260.00

129.00

Doubling

Jhansi-Khairar-Manikpur, Khairar-Bhimsen (411 Km)

3000.00

550.00

Doubling

Agra-Fort (150 Km)

1389.00

70.00

Doubling

Allahabad-Bamrauli 3rd Line (10 Km) with flyover at subedarganj

494.00

120.00

Doubling

Ruma-Chakeri-Chandari 3rd Line (12.5 Km)

1776.00

15.00

Doubling

Aligarh-Daud Khan 3rd line with flyover (6.9 Km)

448.99

75.00

Customer Amenities

Mahoba, Morena Orai and Banda Passenger ramp o­n FOBs

88.00

2.81

Customer Amenities

Provision of FOBs and/or High level PFs at stations-NCR

350.00

41.94

Customer Amenities

Major Upgradation of stations of Indian Railway (NCR)

805.00

250.00

Customer Amenities

Major Upgradation of stations (Part of Umbrella work 21-22)

1512.00

415.00

 

Plan outlay for 2023-24 for o­ngoing as well as new works:-

 