2 Trains from (TNR)TANGUTURU to (RAG)RAIGIR
Address: National Highway 5, Tanguturu, Andhra Pradesh 523274, India
Station Code: TNR
Station Name: TANGUTURU
Zone: SCR/South Central
Train Frequency Weekly: 95
Station Traffic: Medium
Address: Flyover, Andhra Pradesh, India
Station Code: RAG
Station Name: RAIGIR
Zone: SCR/South Central
Train Frequency Weekly: 54
Station Traffic: Medium
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.sr.indianrailways.gov.in- 2022-11-02
South Western Railway has notified Special trains in Raigir – Bengaluru sector as detailed below: Train No 03205 / 03206 Raigir – SMVT Bengaluru – Raigir Special fare specials via Katpadi and Jolarpettai Junctions Train No. 03205 Raigir – SMVT Bengaluru Special fare special journey commencing on 02nd November, 2022 (Today) from Raigir at 10.00 hrs and reach SMVT Bengaluru at 14.00 hrs on the third day i.e., 04thNovember, 2022 (1 service) ØArrival/ Departure Time at Katpadi Junction is 09.30 hrs / 09.50 hrs on 04.11.2022 ØArrival/ Departure Time at Jolarpettai Junction is 11.05 hrs / 11.10 hrs on 04.11.2022
In the return direction, Train No. 03206 SMVT Bengaluru - RaigirSpecial fare special journey commencing on 05th November, 2022 from SMVT Bengaluru at 11.20 hrs and reach Raigir at 12.00 hrs on the third day i.e., 07thNovember, 2022 ( 1 service) ØArrival/ Departure Time at Jolarpettai Junction is 13.00 hrs / 13.05 hrs on 05.11.2022 ØArrival/ Departure Time at Katpadi Junction is 14.20 hrs / 14.40 hrs on 05.11.2022
Coach Composition:- One - AC 3-Tier Coach, Fourteen - Sleeper Class Coaches and Five - General Second Class, One – Pantry Car (empty condition) and Two - General Second Class (Divyangjan Friendly) & Luggage cum Brake vans (Total: 23)
Follow us (B.Guganesan) Chief Public Relations Officer 2
www.scr.indianrailways.gov.in- 2021-02-18
-Annual Inspection conducted between Gudur – oÂÂngole – Tenali section Shri Gajanan Mallya, General Manager, South Central Railway undertook Annual Inspection of Gudur – oÂÂngole – Tenali section of Vijayawada Division today i.e., 16th February, 2021. He was accompanied by Shri P. Srinivas, Divisional Railway Manager, Vijayawada Division, Principal Head of the Departments and other senior officials throughout the inspection. The General Manager commenced the inspection at Gudur Railway station and proceeded further to Manubolu – Kommarapudi section where he inspected the Road Under Bridge (RUB), Level Crossing Gate and Relay Room. He inspected Level crossing gate between Kommarapudi – Venkatachalam section, where he reviewed the safety aspects and also interacted with the Gateman. The General Manager inspected Venkatachalam Railway station and discussed oÂÂn various station developmental plans with the officials, He carried out a speed test of 120 Kmph between Venkatachalam – Nellore section. The General Manager inspected minor bridges between Kommarapudi – Venkatachalam and Alluru – Bitragunta sections. Shri Gajanan Mallya, General Manager, SCR inspected Bitragunta Railway station and discussed oÂÂn station developmental plans with the officials. He inaugurated a Crew Booking Lobby, New Freight Examination facility and flagged off a goods train. He inspected the new Carriage & Workshop office at Bitragunta station. He inspected the facilities available at Bitragunta running room and discussed oÂÂn further improvements with the officials. The General Manager also planted saplings towards green environment at Bitragunta. He conducted a speed test between Kavali – Singarayakonda section. The General Manager inspected the Road Under Bridge (RUB) and a major bridge between Ulavapadu – Singarayakonda – Tanguturu section. The General Manager inspected a bridge over the Romperu river between Uppugunduru – Chinnaganjam section and interacted with the track maintainers. He inspected the level crossing gate between Tsunduru – Tenali section. The General Manager inspected Tenali Railway station, the Health Unit and reviewed the facilities available. The General Manager also visited the staff quarters and Railway colony at Tenali where he interacted with the residents oÂÂn the facilities provided. During the inspection, the General Manager inspected and reviewed overall track maintenance oÂÂn the entire stretch of Gudur – Tenali section and also conducted speed tests oÂÂn the section.
COMMENTS
NO Comments. Be the first to Comment...
|