For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








3 Trains from (MYR)MAIHAR to (MNF)MANDA ROAD


Address: Maihar Railway Station, Maihar, Madhya Pradesh 485771, India

Station Code: MYR

Station Name: MAIHAR

Zone: WCR/West Central

Train Frequency Weekly: 277

Station Traffic: High

Address: Uttar Pradesh 212104, India

Station Code: MNF

Station Name: MANDA ROAD

Zone: NCR/North Central

Train Frequency Weekly: 68

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
11061DARBHANGA EXPMYR06:00GYN12:136:13M,TU,W,TH,F,SA,SU2A,3A,SL,GN,11061 Status
15118JBP MUV EXPRESSMYR12:00GYN18:386:38SU3A,SL,GN,15118 Status
13202LTT RJPB EXPMYR18:15MNF00:105:55M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13202 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
13-05-2020
Total 9278 persons brought in 08 Shramik special trains.47 other through passing trains operated by North Central Railway

North Central Railway

Headquarter

Public Relations

Prayagraj

No. 11PR/05/2020Press ReleaseDate: 06.05.20

Total 9278 persons brought in 08 Shramik special trains.47 other through passing trains operated by North Central Railway

Praygraj Jn. became the first station o­n Indian Railways to handle 04 incoming Shramik Special train in less than 08 hrstime .

Infrastructure and experience of KumbhMela 2019 comes handy in receivingShramik Special trains at Prayagraj Jn.

In the o­ngoing 3rdlockdown effective till 17.05.20 all regular passenger and suburban trains are completely suspended and o­nly with prior consent of state governments,Shramik Special trains are running to clear pre identified migrants from fixed origination point to single destination station.Till 06.05.20 NCR is expected to handle47passing through and have already brought about 9278 migrants through 08 terminating Shramik Special trains atPrayagrajJn , Agra Cantt. and Kanpur Central Stations .

Date

Train no.

From

To

No. of travellers

03.05.20

00953

Sabarmati

Kanpur

1205

03.05.20

00961

Sabarmati

Agra Cantt.

1196

04.05.20

09415

Palanpur

Agra Cantt.

1203

05.05.20

00985

Godhra

Kanpur

1220

06.05.20

09315

Surat

Prayagraj Jn.

1240

06.05.20

09303

Viramgam

Prayagraj Jn.

1264

06.05.20

04606

Ludhiana

Prayagraj Jn.

750

06.05.20

09325

Surat

Prayagraj Jn.

1200

Total in 08 trains

9278

Total in 04 trains to Prayagraj Jn.

4454

On 06.05.20 total 04 trains two from Suratand o­ne each fromViramgam and Ludhiana were handled at Prayagraj Jn. of North Central Railway bringing4454personsbelonging to different districts of Uttar Pradesh . This makes Prayagraj Jn. first station of Indian Railways to handle 04 incoming Shramik Special trains in span of less than 08 hours o­n any single day after operation of these special trains started o­n 01.05.20.

Infrastructure of Prayagraj Jn. Created forKumbhMela 2019 and experience of officers and staffinvolved in conduct of Kumbh-2019 came handy in achieving efficient handling of 04 terminating trains at Prayagraj Jn.

For Kumbh-2019 four big passenger enclosures were constructed at City side of PrayagrajJunction station to hold pilgrims @ 3000 per enclosure and these enclosures were effectively used to hold relatively lesser number of migrant passengers i.e. 600 per enclosure with adequate social distancingbefore all mandatory formalities related to Covid-19 could be completed and they could left for their home districts in Roadways buses arranged by state government . All 04 passenger enclosures were readied and used for handling of incoming passengers with 02 enclosures being used per train.Other improved infrastructure at platforms,concourse, CCTV etc and above all experience of handling biggest congregation of human o­n earth i.e. KumbhMela was the key in this achievement.





2
13-05-2020
To improve safety and operational efficiencies, North Central Railway completed many important works during this lockdown.

North Central Railway

Headquarter

Public Relations

Prayagraj

No. 11PR/05/2020Press ReleaseDate: 03.05.20

To improve safety and operational efficiencies, North Central Railway completed many important works during this lockdown.

Modern heavy-duty Track Maintenance Machines along with track, signal & Overhead Equipment (OHE) maintainers have worked regularly for 1089 machine days to complete overdue track maintenance of 766 km plain track &461 nos. of Turn outs.

A very important and critical work of "Shifting of 132 KV Double Circuit Dadri-Sahibabad transmission line due to infringement with GZB- Meerut RRTS (Regional Rapid Transit System) corridor of NCRTC" has been successfully executed

Apart from ensuring supply chains of all essential commodities runningthrough parcel trains and freight trains ,backend warriors of North Central Railway have successfully executed many important safety, important maintenance and operational efficiency work during this lockdown period with all precautions and social distancing etc .Some of the important works done by North Central Railway are as under:

·Modern heavy-duty Track Maintenance Machines along with track, signal & Overhead Equipment (OHE) maintainers have worked regularly for 1089 machine days to complete track maintenance of 766 km plain track &461nos. of Turn outs.

·Health of the track has been monitored through periodic runs of Oscillation Monitoring System (OMS) for 10796kms. of track and 26 peak locations were attended for safety and riding comfort .

·Ultrasonic flaw detection (USFD) of 4419kms of track and 1336 rail welds has been carried out with USFD machine for safety in train operation.

·Critical summer precaution activities like de-stressing of long welded rail (LWR)which involved huge men power has been taken up with a new procedure for carrying out the work with ensuring social distancing norms. 120kms of de-stressing of LWR has been done.

·To ensure safe running of freight and parcel rolling in examination involving visual inspection,temperature recording etc done in 2790 trains.

·To keep passenger coaches service ready 842 coaches maintained in washing line besides major attention in IOH shed in 55 coaches.

·More than 4000 signals, over 15000 track circuit/ axle counters and close to 5000-point machines were maintained for safe train operations.

·Integrity test of interlocking at station which ensures that all signalling gear are working as per designed logic and no unsafe movement is possible due to any human error in station panel operation. This important work done at 20 stations over NCR.

·For reliability improvement cable meggering to assess its health done for close to 20000 Kms cable length.

·Despite working with bare essential staff, foot patrolling of 10000 Km length OHE done and identified defects rectified.Similarly, over 2500 Km electrified section checked by tower wagon.

·Over 300 mandatory maintenance schedules of electric and diesel locomotives completed to run essential freight and parcel trains.

·321 CCTV, 444 public announcementsystems , 15 escalators , 6 lifts etc. were also maintained during this lockdown .

·A very important and critical work of "Shifting of 132 KV Double Circuit Dadri-Sahibabad transmission line due to infringement with GZB- Meerut RRTS (Regional Rapid Transit System) corridor of National Capital Region Transport Corporation (NCRTC)" has been successfully executedby TRD team of Prayagraj Division along with Delhi Division and NCRTC. To carry out this work, shutdown of both 132 KV lines was required. It was very difficult during normal traffic as Sahibabad Traction Substation (TSS) remains fully loaded during normal traffic and it feeds important lines in National Capital Region. Therefore, it was planned during lockdown period and successfully completed o­n 02.05.20.






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit