For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








2 Trains from (MTC)MEERUT CITY to (mb)moradabad


Address: Meerut, Uttar Pradesh, India

Station Code: MTC

Station Name: MEERUT CITY

Zone: NR/Northern

Train Frequency Weekly: 372

Station Traffic: High

Address: Moradabad Railway Station, NH 24, Moradabad, Uttar Pradesh 244001, India

Station Code: MB

Station Name: MORADABAD

Zone: NR/Northern

Train Frequency Weekly: 889

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
22454RAJYA RANI EXPMTC06:45MB09:252:40M,TU,W,TH,F,SA,SUCC,2S,GN,22454 Status
14512NAUCHANDI EXPMTC19:50MB23:313:41M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN,14512 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
20-09-2019
Weekly Festival Special Train to Run between Malda-Haridwar (Total 16 Trips)


For the convenience of the rail passengers and to clear extra rush duringensuing Diwali & Chhath - 2019, Railways shall run the03427/03428Malda-Haridwar -Malda Weekly Special train as per the following programme :

The 03427 Malda-Haridwar Weekly Pooja Special train will depart fromMalda at 09.05 a.m. on every Monday from 07.10.2019 to 25.11.2019 to reach Haridwar at 02.05 p.m. the next day (08 trips). In the return direction, the 03428Haridwar -Malda Weekly Summer Special train will depart from Haridwar at 03.40 p.m. on every Tuesday from 08.10.2019 to 26.11.2019 to reach Malda at 11.30 p.m. the next day (08 trips).

Comprising of one AC two tier, fourAC three tier, sevensleeper class , four general class& two disabled friendly second class cum luggage van coaches ,the 03427/03428Malda-Haridwar -MaldaWeekly Summer Special train will stop at New Farraka, Barharwa, Sahibganj, Kahalgaon, Bhagalpur, Sultanganj, Jamalpur, Abhaipur, Kiul, Mokama, Bakhtiyarpur, Patna, Ara, Buxar, Pt. Deen Dayal Upadhyay Jn., Varanasi, Sultanpur, Lucknow, Bareilly , Moradabad & Laksar stations enroute in both the directions.

…………….





2
Press Release No. 98 05-07-2019
Hubballi
Press Release No. 98, MINISTRY OF RAILWAYS: THRUST AREAS OF THE REGULAR BUDGET 2019-20

                                                                                                        

                                                                  SOUTH WESTERN RAILWAY

                                    Press Release No. 98  Dt. 05.07.2019

MINISTRY OF RAILWAYS: THRUST AREAS OF THE REGULAR BUDGET2019-20

·Maintaining the momentum o­n capacity enhancement through accelerated investments and execution:

Railway Infrastructure would need an investment of Rs.50 lakh crores between 2018-2030.    It is proposed to use Public-Private Partnership to unleash faster development and completion of tracks, rolling stock manufacturing and delivery of passenger freight services.

Capex for 2019-20 has been pegged at Rs 1,60,176 crore, which is 20 % higher than the previous year. Capex planned for 2019-20 is Rs.2536 Cr. for SWR.

Electrification of the entire BG network by 2021-22. Electrification of 7000 Route Kms has been targeted in 2019-20. In SWR  466 Route Kms is planned for electrification.

The target of new lines, gauge conversion and doubling/tripling etc. for 2019-20 is 3750 kms against 3596 kms in 2018-19. In 2019-20 SWR has achieved 227 Kms of doubling and 43 Km of new line. It is proposed to double Railway track in 266 Km in 2019-20 in South Western Railway.28 Km of new line between Gangavathi and Karatagi is slated for commissioning in SWR in this financial year.

Fast tracking the construction of the two Dedicated Freight Corridors. The two DFCs are targeted to be completed in phases by 2021 out of which Khurja-Bhaupur section o­n Eastern DFC and the Rewari-Palanpur section o­n Western DFC targeted for completion this year (2019-20).

Completing the dedicated freight corridor project will free up some of the existing railway network for passenger trains.

Mumbai-Ahmedabad High Speed Rail (MAHSR) project is progressing well and is targeted for completion by 2023.

Railways will be encouraged to invest more in suburban railways through Special Purpose Vehicle (SPV) structures like Rapid Regional Transport System (RRTS) proposed o­n the Delhi-Meerut route.

In this regard it is to mention that SPV constitution  for Bengaluru suburban Railway is in advanced stage.

Continued focus o­n Safety:

2018-19 has been the safest year in the history of Indian Railways. Elimination of Unmanned level crossings o­n Broad Gauge network has been achieved. SWR has turned Unmanned level crossing gate free in Oct.2018.

Railways is now planning to eliminate all 2,568 manned level crossings o­n Golden quadrilateral and golden diagonal routes in mission mode by constructing ROBs/RUBs. In SWR also elimination of all manned LC gates is being taken up in phased manner. It is planned to construct 97 ROB/RUBs. These routes carry 50-60% of passenger and freight traffic. This will lead to not just easing railway movement but also road movement by ensuring safe, smooth and fast movement of vehicular traffic at level crossings.

Automatic Train Protection (ATP) system using a mix of proven European Train Control System (ETCS) and an indigenous developed system to enhance safety, create additional capacity and increase efficiency in train operations.

·Enhancing passenger experience and security:

Launch of a massive programme of railway station modernization to make railway travel a pleasant and satisfying experience for the common citizen.

 In SWR 3 stations i.e. Mysuru, Yesvantpur and Dharwad are planned for development this year.

·The introduction of fully indigenous semi high-speed Train-18:

Railway has planned to provide Wi-Fi at all stations excluding halt stations to improve rail travel experience and bridge the digital divide between the rural and urban citizens. Till now this facility has been provided at 1,603 stations & balance 4,882 stations are targeted for provision by August 31, 2019 under the ambitious 100 days program of the Government. In SWR 153 stations have already been provided with Wi-Fi and it is proposed to provide Wi-Fi at 123 more stations by end of Aug.2019.

Railway has planned to provide CCTV based Surveillance System at all stations (excluding halt stations) and in trains by using state-of-the art video surveillance technology to enhance safety of passengers. CCTV Surveillance System at 455 railway stations have been provided and balance stations are targeted by 2020-21. Similarly, 1,203 coaches were equipped with CCTV Surveillance System and balance passenger carrying coaches are targeted by 2021-22.

 In SWR 4 stations have been provided with IP enabled CCTV Surveillance System and at 11 stations CCTV systems are working

·Skilling Railways:   

Scheme of Integrated Skill Development will be launched where all 13 lakh employees of Railways will be given a foundational training. This Programme will focus o­n 3Cs – The Customer, Cost and Work Culture. Those who demonstrate high learning agility and greater skill mastery at this level can be offered an Advanced Program in the same skill area. 


                                                      (E. Vijaya)

                                                         Chief Public Relations Office






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit