2 Trains from (MJA)MEJA ROAD to (PTRU)PATRATU
Address: Uttar Pradesh 212305, India
Station Code: MJA
Station Name: MEJA ROAD
Zone: NCR/North Central
Train Frequency Weekly: 95
Station Traffic: Medium
Address: Jharkhand 829118, India
Station Code: PTRU
Station Name: PATRATU
Zone: ECR/East Central
Train Frequency Weekly: 115
Station Traffic: Medium
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.er.indianrailways.gov.in- 2022-08-03
3, कोयलाघाट सà¥à¤Ÿà¥à¤°à¥€à¤Ÿ, कोलकाता – 700001, 3, Koilaghat Street, Kolkata – 700001 REGULATIONS OF TRAINS FOR NON-INTERLOCKING WORK OVER EAST CENTRAL RAILWAY Due to Pre Non-Interlocking/Non-Interlocking work for replacement of old Panel by Electronic Interlocking and doubling work at Barkakana and Arigada stations over East Central Railway from 30.07.2022 to 17.08.2022, the following trains will be regulated as under: Cancellation of trains: ·03555 Asansol – Barkakana MEMU passenger Special (Journey Commencing from 12.08.22 to 18.08.2022). ·03556 Barkakana – Asansol MEMU passenger Special (Journey Commencing from 13.08.22 to21.08.22). ·03605/03606 Maheshmunda – Koderma – Maheshmunda Express Special and 03369/03370 Madhupur – Koderma – Madhupur Express Special ( Journey commencing from 30.07.2022 to 18.08.2022). Diversion of trains: ·11447 Jabalpur – Howrah Express (Journey Commencing from 11.08.2022 to 17.08.22) will be diverted via Patratu – Bhurkunda – Barkakana (avoiding) – Arigada – Ranchi Road instead. ·11448 Howrah – Jabalpur Epress (Journey Commencing from 12.08.2022 to 18.08.22) will be diverted via Ranchi Road – Arigada – Barkakana (avoiding) – Bhurkunda – Patratu. ·19414 Kolkata – Ahmedabad weekly Express (Journey commencing on 13.08.2022) will be diverted via Ranchi Road – Arigada – Barkakana (avoiding) – Bhurkunda – Patratu. ·13025 Howrah – Bhopal weekly express (Journey commencing on 15.08.2022) will be diverted via Ranchi Road – Arigada - Barkakana (avoiding) – Bhurkunda – Patratu. ·19608 Madar Jn. – Kolkata express (Journey commencing on 15.08.2022) will be diverted via Patratu - Bhurkunda - Barkakana (avoiding) – Arigada - Ranchi Road. Inconvenience to be caused to the passengers is deeply regretted. 2
www.ncr.indianrailways.gov.in- 2022-01-11
उतà¥â€à¤¤à¤° मधà¥â€à¤¯ रेलवे जनसमà¥â€à¤ªà¤°à¥à¤• कारà¥à¤¯à¤¾à¤²à¤¯ उतà¥â€à¤¤à¤° मधà¥â€à¤¯ रेलवे,पà¥à¤°à¤¯à¤¾à¤—राज पतà¥à¤°à¤¾à¤‚क: 11पीआर/01/2022 पà¥à¤°à¥‡à¤¸ विजà¥à¤žà¤ªà¥à¤¤à¤¿à¤¦à¤¿à¤¨à¤¾à¤‚क: 10.01.2022 NCR makes giant stride towards electrification 92% of NCR’s broad gauge network is now electrified With the electrification of Shikohabad-Mainpuri section on 31st December, total electrified route km in NCR now stands at 2933 Electrification of 5 major routes completed in calendar year 2021. Aggressively pursuing towards mission 100% electrification, NCR completed a total of 216 Route Kilometer & 314 Track Kilometer of electrification between April-December'2021. Major routes which have been electrified during first three quarters of current financial year are: Birlanagar-Udimor (101 km) Mahoba-Khajuraho (64 km) Shikohabad-Mainpuri (51 km) In addition, newly laid double line between Chaunrah-Malasa (19 km), Nandkhas-Parauna (32 km) (both part of Bhimsen-Jhansi doubling project) and third line between Babina- Jhansi (24 km) are opened along with electrification. At present, NCR has 2933 electrified Route Km and 6313 electrified track kilometers. ·Electrification works completed in NCR during calendar year 2021 are: 1.Bharatpur- Bandikui (97.5 km) 2.Bhandai- Etawah (114 km) 3.Mahoba-Khajuraho (64 km) 4.Birlanagar-Udimor (101 km) 5.Shikohabad-Manipuri (51km) In addition to above major routes, electrification works of sidings like Chunar, Churk, Meja NTPC, Shankargarh have also been completed. As a result of massive electrification, need for traction changing from AC engine to diesel engine is now done away at these places thereby reducing detentions and increasing mobility and punctuality. With a total broad gauge network of 3222 route kilometers in NCR, electrified route km (2933) now stands at 91% of overall broad gauge network of NCR. Electrification of remaining routes like Khajuraho-Udaipura, Barhan-Etah and Etawah-Mainpuri-Farrukhabad is targeted to be completed this year.
COMMENTS
NO Comments. Be the first to Comment...
|