12 Trains from (DWO)DOIWALA to (SBB)SAHIBABAD
Address: Doiwala Railway Station, Doiwala, Uttarakhand 248140, India
Station Code: DWO
Station Name: DOIWALA
Zone: NR/Northern
Train Frequency Weekly: 73
Station Traffic: Medium
Address: Sahibabad, Vasundhara, Ghaziabad, Delhi, India
Station Code: SBB
Station Name: SAHIBABAD
Zone: NR/Northern
Train Frequency Weekly: 730
Station Traffic: High
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.wr.indianrailways.gov.in- 2022-06-28
FEW TRAINS OF WR AFFECTED DUE TO NON-INTERLOCKING WORK AT CHANDER NAGAR STATION on NEW DELHI - GHAZIABAD JN. SECTION OF NORTHERN RAILWAY Due to ongoing Non-Interlocking work at Chander Nagar station on New Delhi – Gaziabad section of Northern Railway, few Western Railway trains will be affected from 29.06.2022 to 02.07.2022 According to a press release issued by Shri Sumit Thakur - Chief Public Relations Officer of Western Railway, details of these trains are as under: Diversion of Trains
*************** 2
www.scr.indianrailways.gov.in- 2021-05-28
Shri Piyush Goyal Minister for Railways and Commerce & Industry and Consumer Affairs, Food & Public Distribution reviews last mile connectivity plans for Char Dham projects Final Location Survey (FLS) for new BG Rail connectivity to Char Dham i.e. Yamunotri, Gangotri, Kedarnath and Badrinath is near completion "Pilgrims must get fast, safe and comfortable last leg connectivity with the Char Dhams", this was said by Shri Piyush Goyal Minister for Railways and Commerce & Industry and Consumer Affairs, Food &Public Distribution while reviewing the last mile connectivity plans for Char Dham projects. The Minister directed concerned officials to do a detailed review of all the alternatives keeping in view the comfort and safety of citizens. He said that options of all last leg connectivity be examined along with detailed cost implications for the entire project upto completion. Minister said that in order to cater to the need of tourism and to make it convenient for the pilgrims to reach the temple safely and timely, a comprehensive planning for project needs to be done. It may be noted that Final Location Survey (FLS) for new BG rail connectivity to Char Dham i.e. Yamunotri, Gangotri, Kedarnath and Badrinath is near completion. Kedarnath and Badrinath Rail connectivity will take off from Karnaprayag station which is part of 125 km long Rishikesh -Karnaprayag new BG Rail line project under construction at full swing. Gangotri and Yamunotri Rail connectivity will take off from existing Doiwala Station. As per Char Dham BG Rail connectivity survey, the terminal station of new BG Rail line are terminating at Barkot, Uttarkashi, Soneprayag and Joshimath which are short of Char Dham temples due to steep terrain and limitation of BG ruling gradients. In order to cater to the need of tourism and to make it convenient for the pilgrims to reach the temples safely and timely,Reconnaissance Engineering Survey(RES) for connecting new BG Railway terminal stations to Dhams (Temples) is being carried out with an objective to look for suitable system which is environmental friendly, safe and at the same time a tourist attraction. A large number of pilgrims across the country flocks to Char Dhams & large number of foreign and domestic tourist are attracted to trekking & site seeing in the state of Uttarakhand. The existing road connectivity travels through fragile mountainous slopes and suffers from serious handicaps of load, capacity, safety and speed. The Rail connectivity to these Char Dhams will make the travel much safer, economical, comfortable, environment friendly and all weather.
COMMENTS
NO Comments. Be the first to Comment...
|