For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

veppampattu

STATION INFO

Address: Chennai Tiruvallur High Rd Tamil Nadu

Station Code: veu)veppampatt

Station Name: veu)veppampattu

Zone: SR/Southern

Total Unique Trains: 4

Train Frequency Weekly: 25

Station Traffic: Low

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
66022AJJ MAS MEMU08:0408:051M,TU,W,TH,F,SA,SUUNRESERVED
66018VLR MSB FAST MEMU08:3208:331M,TU,W,TH,F,SA,SUUNRESERVED
66053MSB TRL LOCAL17:4417:451M,TU,W,TH,F,SA,SUUNRESERVED
66017MSB VLR MEMU FAST18:4318:441M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
320/2021-22 30-07-2021
Chennai
Un-reserved Express Specials


As approved by Railway Board the following unreserved specials will run as detailed below:

Train No. 06034/06033VelloreCantonment - ChennaiBeach - VelloreCantonment MEMUUn-ReservedExpress Daily Special:

Train No. 06034 VelloreCantonment - ChennaiBeach Un-ReservedExpressSpecial will leave Vellore Cantonment at 06.00 hrs o­n and from 02nd August, 2021 and reach Chennai Beach at 09.40 hrs, the same day until further advice

In return direction Train No. 06033 ChennaiBeach - VelloreCantonment MEMUUn-ReservedExpress Daily Special at 18.00 hrs o­n and from 02nd August, 2021 and reach Vellore Cantonment at 21.45 hrs, the same day until further advice

Train No. 06034 VelloreCantonment - ChennaiBeach Un-ReservedExpressSpecial will have additional stoppage at Puliyamangalam

Train No. 06033 ChennaiBeach - VelloreCantonment MEMUUn-ReservedExpress Daily Special will have additional stoppage at Ambattur

Coach Composition: 6-Trolley Cars, 2- Motor Cars

The details of stoppages and timings of Train No. 06034/06033VelloreCantonment - ChennaiBeach - VelloreCantonment MEMUUn-ReservedExpress Daily Special are as follows

Train No. 06034 VelloreCantonment - ChennaiBeach Un-ReservedExpress Daily Special

↓

Stations

↑

Train No.06033 ChennaiBeach - VelloreCantonment MEMUUn-ReservedExpress Daily Special

06.00

(d)

VelloreCantt

(a)

21.45

06.18/06.20

(a/d)

Katpadi

(a/d)

21.18/21.20

06.32/06.33

(a/d)

Tiruvalam

(a/d)

20.47/20.48

06.44/06.45

(a/d)

Mukundarayapuram

(a/d)

20.37/20.38

06.54/06.55

(a/d)

WalajahRoad

(a/d)

20.24/20.25

07.04/07.05

(a/d)

Thalangai

(a/d)

20.12/20.13

07.14/07.15

(a/d)

Sholinghur

(a/d)

20.04/20.05

07.24/07.25

(a/d)

Anavardikhanpet

(a/d)

19.54/19.55

07.34/07.35

(a/d)

Chitteri

(a/d)

19.49/19.50

07.58/08.00

(a/d)

Arakkonam

(a/d)

19.38/19.40

08.04/08.05

(a/d)

Puliyamangalam

--

---

08.07/08.08

(a/d)

Mosur

(a/d)

19.23/19.24

08.12/08.13

(a/d)

Tiruvalangadu

(a/d)

19.17/19.18

08.17/08.18

(a/d)

Manavur

(a/d)

19.12/19.13

08.21/08.22

(a/d)

SenjiPanambakkam

(a/d)

19.08/19.09

08.25/08.26

(a/d)

Kadambattur

(a/d)

19.04/19.05

08.29/08.30

(a/d)

Egattur

(a/d)

19.00/19.01

08.34/08.35

(a/d)

Tiruvallur

(a/d)

18.56/18.57

08.38/08.39

(a/d)

Putlur

(a/d)

18.50/18.51

08.41/08.42

(a/d)

SevvapetRoad

(a/d)

18.47/18.48

08.44/08.45

(a/d)

Veppampattu

(a/d)

18.43/18.44

08.49/08.50

(a/d)

Thiruninravur

(a/d)

18.39/18.40

---

--

Ambattur

(a/d)


2
78/2019-2028-05-2019
CHENNAI
CONSTRUCTION OF PEDESTRIAN SUBWAY AT VEPPAMPATTU


Chennai division of Southern Railway, has, today, successfully completed the erection of 17 precast R.C.C (Reinforced Concrete Cement) boxes (9 nos + 8 nos) of size 5 metres x 2.75 metres o­n Fast lines (UP and DN) in Veppampattu Station in Chennai – Arakkonam section at km 32/9-11 for the pedestrian subway. The station consists of four lines, three platforms and presently there is no Foot Over Bridge or subway. Hence the work has been taken up o­n priority. 

The work has been successfully completed despite the space constraints at the site due to densely populated area. The work area available for leveraging the machines was limited and machines could not operate without infringing the remaining track portion and working was possible from o­nly o­ne direction. The work has been planned and taken up in a mega block spread over two weekends  from Saturday Night till Sunday Morning (two lines o­n each weekend block) to minimise the repercussion to train services,thus ensuring that there is least disruption to regular train services.  

The first portion beneath the Slow lines (UP and DN) of 8 RCC precast box segments have been completed by the division within the sanctioned block time o­n 18th and 19th May 2019, and the second portion beneath the fast lines (UP and DN) of 9 RCC precast box segments have been completed within the sanctioned 12 hours line and power block from May 25th night to May 26th (today) morning. Total 17 box segments underneath the tracks have been completed during the mega block.  The planning and coordination of various departments like Engineering, Traction, Signal and Telecommunication, Operating and RPF, made the completion of this work within the stipulated time, possible. In the coming days some more ancillary works will be done to fully complete this subway which is being constructed for the use of passengers crossing the tracks at Veppampattu Station. Hence tresspassing by the public will be prevented o­n completion of this work.

Utilising this block period, vital track maintenance works and other developmental works were carried out in the section. 5.9 kms track has been packed in the section using the track tie tamping machine and other track maintenance works like through Rail Renewal for Points and Crossing including track welding work has been done in the section. Also, earth work for extension of platform/provision of platform at Tiruninravur Railway Station was done during the block period.

Follow Us : -                                                                       

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.faceook.com/Southern-Railway-240606622749869








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit