For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

MAU AIMMA

STATION INFO

Address: Bharana, Uttar Pradesh 212507, India

Station Code: MEM)MAU AIMM

Station Name: MEM)MAU AIMMA

Zone: NR/Northern

Total Unique Trains: 10

Train Frequency Weekly: 61

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
14308BE LKO ALD PASS04:3504:361M,TU,W,TH,F,SA,SUSL,GN
54371PYG FD PASS06:0906:101M,TU,W,TH,F,SA,SUUNRESERVED
54373PYG FD PASS07:3107:321M,TU,W,TH,F,SA,SUUNRESERVED
14126SARYU EXPRESS07:3607:371M,TU,W,TH,F,SA,SUUNRESERVED
54254LKO PYG PASS12:0012:011M,TU,W,TH,F,SA,SUUNRESERVED
54253PYG LKO PASS16:1316:141M,TU,W,TH,F,SA,SUUNRESERVED
54372FD PYG PASS17:4717:481M,TU,W,TH,F,SA,SUUNRESERVED
14125SARYU EXPRESS19:1019:111M,TU,W,TH,F,SA,SUUNRESERVED
54374FD PYG PASS22:0522:061M,TU,W,TH,F,SA,SUUNRESERVED
14307PRG BE EXPRESS22:5822:591M,TU,W,TH,F,SA,SU3A,SL,2S,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
27-07-2021
PRESS RELEASE: GM/ER LAID STRESS ON PASSENGER SAFETY, COVID CARE MANAGEMENT AND PUNCTUALITY OF TRAIN SERVICES.

  

GM/ER LAID STRESS o­n PASSENGER SAFETY, COVID CARE MANAGEMENT AND PUNCTUALITY OF TRAIN SERVICES.

Kolkata, 27th July 2021:

 

Shri Manoj Joshi, General Manger, Eastern Railway held a meeting with Principal Heads of Department, Divisional Railway Managers and Chief Works Managers through video Conferencing at Eastern Railways Head Quarters, Fairlie Place today (27th July 2021). Shri Aneet Dulat, Additional General Manager, Eastern Railway was also present. In the meeting issues o­n passenger’s safety, COVID care management and punctuality in train services were broadly deliberated upon.

1.General Manager opined that passenger safety is prime area of concern and no compromise with whatsoever will be tolerated. It should be ensured to step up inspection and maintenance work so as to ensure no accident. It could not be ruled out that there was some amount of slackness in safety, maintenance at inspection works o­n account of COVID Pandemic. But since Railway has already introduced more than 90% train operations, we have to now ensure that all safety inspections should be done meaningfully in a time bound manner. Deficiencies should be pointed out and thereafter an action plan should chalked out immediately to address deficiencies whatsoever, Counselling of Guards is of paramount importance for following safety rules critically.

2.General Manager has also stressed o­n special monsoon preparedness as the country is witnessing severe monsoon this year. Railway should monitor closely all vulnerable locations especially at the approach of bridges for checking rail weld fractures. Precaution and protection should be taken well in advance and calendar of inspection must be maintained scrupulously.

3.General Manager has further instructed all concerned to closely monitors the quality of new construction work taking into consideration the quantum of monsoon. He has directed to be watchful enough in implementation of non-interlocking works.

4.General Manager has congratulated the medical fraternity of Eastern Railway over successful completion of vaccination of employees. He has further stressed o­n accomplishing the remaining work of vaccinating dependent family members of ER employees. In a sort of achievement, Eastern Railway has administered over 50,000 doses of vaccines. However General Manager has warned against complacency in the context of decreasing number of patients and he has advised to remain cautious in completing vaccination. In a study at B.R. Singh Hospital it reveals that patients with double dose vaccination are not required to be put under life support system in CCU. Apart from inoculating vaccine to its own employees and dependents, ER has also vaccinated more than 22,000 police personnel and election workers to boost up fight for front line warriors.

5.General Manager held that there should not be unmanned Level Crossing gate at any Railway siding and the existing o­ne should be gradually removed in a time bound manner.

6.General Manager has congratulated all concerned for rendering good work in maintaining punctuality of Mail/Express trains at 96.4%. In this connection he has sounded caution about bad runner trains and instructed to monitor train movement closely in order to enhance punctuality further.

7.Out of 214 Mail/Express trains of Eastern Railway, Railway has already restored 204 trains. Reintroduction of EMU local trains require permission from State Govt.

8.General Manager has expressed his happiness over total loading of 22.80 Million Tonnes during this financial year which is 6.54% more than corresponding period of last financial year.

9.General Manager has congratulated all DRMs and Chief Works Managers for doing their best in offering scraps as ER has already sold scraps for a whooping amount of 68.40 Crore till date.

10.Today General Manager has inaugurated a static weigh bridge at Howrah which has been commissioned in a very short span of time. This weigh bridge will ease parcel loading & weighing and it will act as a confidence building measure for all loaders.






2
27-07-2021
PRESS RELEASE: INTRODUCTION OF 12349/50 GODDA – NEW DELHI HUMSAFAR EXPRESS WITH SMART COACHES

  

INTRODUCTION OF 12349/50 GODDA – NEW DELHI HUMSAFAR EXPRESS WITH SMART COACHES

Kolkata, 27th July, 2021:

With the opening of the newly constructed Godda – Hansdia section of Eastern Railway’s Maldah Division, 12349/50 GODDA – NEW DELHI, Humsafar Express, was introduced in service with LHB AC 3-Tier (LWACCN) coaches equipped with modern features, like GPS-Based Passenger Information System, Passenger Announcement System, like Station Names, Next Station Journey Kilometers Left, etc., Fire and Smoke Detection and Suppression System, Fire Detection with Brake Application and others. Some of the major features of the train are elucidated below:

 

1.Digital Display System

The Digital Display System shows vital journey related information to the passengers like next station, distance remaining, expected time of arrival, delay and other safety related message for convenience of passengers.

2.Water Level Indicator Inside the Coach

In course of long distance journeys, the requirement of watering of a coach can be predicated from inside the coach through this equipment and availability of water in the coach can be ensured thereby.

3.CCTV Camera Inside the Coach

CCTV is provided to capture the movements of passengers and the data can be analyses as per requirement. The data stored can be utilized for investigations. This gives confidence and sense of security to the passengers during travelling.

4.Passenger Emergency Talk Back System

During any Medical or Security Emergency, the passengers can hold talk directly with the Guard so that the response time is greatly reduced.









COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search