For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (NZM)H NIZAMUDDIN to (KOP)C SHAHUMHARAJ T


Address: Hazrat Nizamuddin Railway Station, Harsha Road, Nizamuddin East, New Delhi, Delhi 110013, India

Station Code: NZM

Station Name: H NIZAMUDDIN

Zone: NR/Northern

Train Frequency Weekly: 893

Station Traffic: High

Address: Station Road, New Shahupuri, Sahajeevan Society, Maharashtra, India

Station Code: KOP

Station Name: C SHAHUMHARAJ T

Zone: CR/Central

Train Frequency Weekly: 173

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
12148NZM KOP EXPNZM05:50KOP16:2034:30TH2A,3A,SL,GN,12148 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
29-03-2023
Press Release:GENERAL MANAGER, EASTERN RAILWAY OPENED VANDE BHARAT COACH MAINTENANCE DEPOT AT HOWRAH JHEEL SIDING


Kolkata, March 29, 2023

Hon’ble Prime Minister has ushered in new era of high speed rail communication by introducing Howrah – New Jalpaiguri Vande Bharat express train o­n 30.12.2022. Since, the inception of Howrah – New Jalpaiguri – Howrah Vande Bharat express has become very popular among the people of West Bengal as this train facilitates tourism in Dooars and Darjeeling Himalayan region. 

Vande Bharat rakes are semi-high speed trains conceptualized, designed and developed indigenously, coaches are fitted with state-of-the-art safety features, world class amenity fittings and equipped with modern control and monitoring systems. In order to create a modern coach maintenance facility, Shri Arun Arora, General Manager, Eastern Railway opened a Vande Bharat coach maintenance depot at Jheel Siding, Howrah o­n 29.03.2023. Speaking o­n the occasion, General Manager, Eastern Railway said that the high speed Howrah - New Jalpaiguri Vande Bharat express train is first of its kind in eastern region of the country and Eastern Railway is proud to maintain such rake at Howrah Division. He also mentioned that with the opening of specialised Vande Bharat maintenance depot at Howrah aims to provide world class journey experience to the esteemed passengers.

In this maintenance depot at Howrah, Vande Bharat rakes will be maintained by an integrated and dedicated team of specialists from different units of Eastern Railway for a comprehensive maintenance. This Jheel Siding Coaching Depot has been augmented by RVNL (Rail Vikas Nigam Limited) in two phases and now able to maintain rakes of eighteen (18) coach length with all-weather 425 m long shed having 3 tier maintenance facility. In fact this Jheel siding now has the longest shed (425 m) of Eastern Railway having three-tier maintenance facility for Vande Bharat train. Heavy repair shed of 100m length EOT crane for lifting of coaches and washing line is also available at this coaching depot. Besides, Vande Bharat rake maintenance facility, Jheel Siding Coaching Depot has also 3 lines for washing cum maintenance of passenger trains.
Shri Arun Arora, General Manager, Eastern Railway also opened an Automatic Coach Washing Plant at Howrah for EMU shed. This newly installed Automatic Coach Washing Plant (ACWP) at Howrah is eco-friendly and it recycles 70% of used water after treatment of waste water with E.T.P (Effluent Treatment Plant). This will help in reducing of water consumption in rake cleaning. The water consumption Per Rake is o­nly 0.72 KL by using ACWP compared to the huge requirement of 6KL Water consumption per Rake in manual cleaning. Thus, this ACWP will save approx. 1900 KL water per year which will be helpful to maintain environment sustainability. Besides reduction in water consumption, the automatic coach washing plant at Howrah EMU shed will also increase throughput by cleaning 15 rakes per day in comparison to 2 rakes by manual cleaning. Moreover, ACWP is cost effective also and will save about Rs. 20 lakhs per year through reduced manpower requirement.




2
29-03-2023
Press Release:GENERAL MANAGER INSPECTED JAMALPUR – SABOUR SECTION & REVIEWED PERFORMANCE OF MALDA DIVISION



Kolkata, March 27, 2023 :

Shri Arun Arora, General Manager/Eastern Railway inspected over Jamalpur – Sabour section of Eastern Railway’s Malda Division o­n Saturday (25.03.2023). The General Manager thoroughly inspected the safety gears, tracks, points, turnouts in the section. Shri Arora expressed his satisfaction over the maintenance of asset, condition of tracks & safety gears. 

The General Manager thoroughly reviewed the performance of Malda Division in respect of asset maintenance, track renewal, loading, improvement of passenger amenities, improvement in safety aspects etc. Followings are the brief accountal of the recent achievements of Malda Division of Eastern Railway :-

•Malda division has completed target of Track Renewal, Switch Renewal and Deep Screening of track including point and crossing to improve safety and ride quality. 
•To improve safety in train running, 06 nos. of Engineering Level Crossing Gates has been interlocked during the current financial year 2022-23.
•Terminal detention over Malda division has improved drastically and for 03 power houses, it has been reduced to half. This has increased coal availability for power production and improved mobility, availability of empty rakes for loading. Malda Division achieved the best ever Wagon Turn Round of 0.8 in the month of February 2023.
•To improve passenger amenities Malda Division has commissioned 10 nos. of lifts at different stations and further 02 more will be commissioned at Barharwa station in current financial year 2022-23.
•Total 15 stations have been selected for upgradation under Amrit Bharat scheme. Malda Division is among the first to float tender for same in Indian Railways. Consultants has been finalized and detail planning of these works are in advance stages.
•Traffic facility work and Goods Shed development have been given highest priority.
•Two additional FOB (Foot Over Bridge) has been launched at Jamalpur Railway station, improved Façade light and fountain upgradation work has been completed at Jamalpur. Jamalpur Diesel shed has been electrified to handle POH of electric loco.
•Jamalpur station has been selected among 15 stations to develop under Amrit Bharat scheme.
• 09 No. of new trains has been introduced during last 05 years in Malda Division. Service extension of 11 trains has been done. To cater to passenger demand from 04.01.2023 -  05 coaches has been augmented in 13404 Bhagalpur - Ranchi Vananchal Express o­n permanent basis.      





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit