For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








3 Trains from (JSM)JAISALMER to (LGH)LALGARH JN


Address: Jaisalmer Railway Station, NH 15, Jaisalmer, Rajasthan 345001, India

Station Code: JSM

Station Name: JAISALMER

Zone: NWR/North Western

Train Frequency Weekly: 77

Station Traffic: Medium

Address: Lalgarh Railway Station, Major Purnasingh Nagar, Bikaner, Rajasthan, India

Station Code: LGH

Station Name: LALGARH JN

Zone: NWR/North Western

Train Frequency Weekly: 139

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
12372JSM HWH SF EXPJSM01:25BKN06:204:55TH2A,3A,SL,GN,12372 Status
14703JSM LGH EXPJSM10:10LGH16:256:15M,TU,W,TH,F,SA,SU3A,SL,2S,GN,14703 Status
12467LEELAN EXPJSM23:55LGH04:454:50M,TU,W,TH,F,SA,SU3A,SL,2S,GN,12467 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
No.170/2020-21 14-07-2020
Chennai
Indian Railways on MISSION MODE of becoming a "Green Railway" by 2030( Net Zero Carbon Emission)




 Electrification of all routes o­n Broad Gauge  by December 2023

Solar and wind energy to power the Railway electricity grid in a big way

Indian Railways has completed electrification of more than 40,000 RKM (63% of BG routes)

 18,605 km electrification work has been done during 2014-20 compare to 3,835 km in 2009-14

365 km major connectivity work has been commissioned during even during COVID period

100 MW of Solar plants have been commissioned o­n roof-tops of various buildings including 900 stations; 400 MW are under different stages of execution

Indian Railway has 51,000 hectare of land potential of installing 20 GW land based solar plants

One project of 1.7 MW at Bina  in collaboration with BHEL has already been installed

In the Wind Energy sector, 103 MW wind-based power plants have already been commissioned; planned to set up 200 MW wind energy plants in next 2 years in Tamil Nadu, Gujarat, Rajasthan and Karnataka

100 per cent LED illumination of buildings and stations

Total 505 pairs of trains have been converted to HOG, unleashing approx 70 million liter diesel/ Rs 450 crore per annum potential of saving

A total of 69,000 coaches have been fitted with 2, 44,000 bio-toilets in Indian Railways


Ministry of Railways, with a goal of transforming Indian Railways into Green Railways by 2030 has taken a number of major initiatives towards mitigation of global warming and combating climate change. Railway Electrification, improving energy efficiency of locomotives & trains and fixed installations, green certification for installations/stations, fitting bio toilets in coaches and switching to renewable sources of energy are parts of its strategy of achieving net zero carbon emission.

Indian Railways has completed electrification of more than 40,000 Route km (RKM) (63% of BG routes) in which 18,605 km electrification work has been done during 2014-20. Previously, o­nly 3,835 km electrification work was completed during the period 2009-14. Indian Railways has fixed a target of electrification of 7000 RKM for the year 2020-21. All routes o­n BG network have been planned to be electrified by December 2023. Indian Railways is focusing o­n electrification of last mile connectivity & missing links. With this in mind 365 km major connectivity work has been commissioned during COVID period.

Major connectivity commissioned during COVID  period like Katni-Satna section (99 RKM) of Mumbai-Howrah via Allahabad route has been commissioned providing an alternate route to Howrah. Likewise, Pachore-Maksi (88 RKM) section o­n Indore - Guna-Bina route has also been commissioned providing an alternate route to Maksi-Bhopal-Bina. o­n Howrah/Sealdah-SVD Katra via Patna route, Bhagalpur-Shivnarayanpur (45 RKM) section has been commissioned.  o­n the route connecting Kariakal port to coal, fertilizer & steel plants of Tamil Nadu & Andhra Pradesh, Thiruvarur - Karaikal port (46 RKM) section has been commissioned providing port connectivity to Erode, Coimbatore & Palghat.

Indian Railways has also taken a number of initiatives to promote solar energy. Indian Railways is working to harness the potential of 500 Mega Watt (MW) energy through roof top Solar panels (Developer model). Till date, 100 Mega Watt (MW) of solar plants have been commissioned o­n roof-tops of various buildings including 900 stations. Solar plants with a combined capacity of 400 MW are under different stages of execution. Tenders are already awarded for 245 MW and target for completion of these plants is December 2022.  

Besides this, Indian Railways is trying to produce power from land Based Solar installations for running trains. Indian Railway has 51,000 hectare of land potential of installing 20 GW land based solar plants. The Solar power so generated will be fed to Central / State Grid or directly to 25 kV AC traction system.  Railway Energy Management Company Limited (REMCL), a Joint Venture Company of Indian Railways (49 % Equity) and RITES Limited (51 % Equity), has been mandated for proliferation of taking up land based project.

One project of 1.7 MW at Bina (Madhya Pradesh) in collaboration with Bharat Heavy Electricals Limited (BHEL) has already been installed and is presently under extensive testing. This is First of its kind of solar project in the world.

Initially for the Land Based Solar Projects, Indian Railways has taken up 3 GW Solar Project in three phases. In phase I tender has been floated under developer model o­n 29th April 2020 for 1.6 GW capacities in railway plots for open access states. In Phase II, 400 MW capacities in railway plots will be developed for non open access States under ownership model of REMCL (captive use). For this tender has floated o­n 16th June 2020. In Phase III 1 GW capacity in railway plots along the tracks under developer model will be installed for open access States for which tender has been floated o­n 1st July2020.

In the wind energy sector, 103 MW wind-based power plants have already been commissioned. Among them, 26 MW is in Rajasthan (Jaisalmer), 21 MW is in Tamil Nadu and 56.4 MW is in  Maharashtra (Sangli). Indian Railways has also planned to set up 200 MW wind energy plants in next 2 years in Tamil Nadu, Gujarat, Rajasthan and Karnataka.  

Realizing its role in climate change Indian Railways has started other Green Initiatives like 100 per cent LED illumination of buildings and stations. Indian Railways has also acquired Green Certification from CIII to 7 Production Units (PUs), 39 Workshops, 6 Diesel sheds and 1 Stores depot. 14 Railway Stations and 21 other buildings/ campuses have also been Green certified. Other than this 215 Stations have been certified with Environment Management System (EMS)/ISO 14001.

Total 505 pairs of trains have been converted to Head o­n Generation(HOG), unleashing approx 70 million liter diesel/ Rs 450 crore per annum potential of saving.  Energy Efficiency Studies of all 8 Production Units & 12 workshops have been completed under MOU with CII resulting in 15% improvement in energy efficiency.

In the field of Green Initiatives a total of 69,000 coaches have been fitted with more than 2,44,000 bio-toilets in Indian Railways.

***

PIB Courtesy 


(D. Om Prakash Narayan)
Sr.PRO




2
2020/02/3829-02-2020
Mumbai
WESTERN RAILWAY TO ATTACH EXTRA COACHES IN 26 PAIRS OF TRAINS



WESTERN RAILWAY TO ATTACH EXTRA COACHES IN

26 PAIRS OF TRAINS o­n PERMANENT BASIS

 

For the convenience of the passengers and to clear the rush, Western Railway has decided to augment extra coaches in the following pairs of trains o­n temporary basis. The details are as under:-

Sr.

No

Train No.

From

To

No. & Type of coach

Period of Augmentation

1

22931/22932

Bandra Tr.

Jaisalmer

Two sleeper & o­ne AC Three Tier

Ex Bandra Tr.(Fri)

06/03/2020

Ex Jaisalmer (Sat)

07/03/2020

2

22933/22934

Bandra (T)

Jaipur

Two sleeper & o­ne AC Three Tier

Ex Bandra (T)(Mon)

02/03/2020

Ex Jaipur (Tue)

03/03/2020

3

22949/22950

Bandra (T)

Delhi Sarai Rohilla

Two Sleeper

Ex Bandra (T)(Wed)

04/03/2020

Ex Delhi Sarai Rohilla (Thur)

05/03/2020

4

22917/22918

Bandra Tr.

Haridwar

OneAC 3 –Tier & o­ne Sleeper

Ex BDTS (Wed)

04/03/2020

Ex Haridwar(Thur)

05/03/2020

5

19021/19022

Bandra Tr.

Lucknow Ne

OneAC 3 Tier & o­ne Sleeper

Ex Bandra Tr.(Sat)

07/03/2020

Ex Lucknow Ne (Mon)

09/03/2020

6

22903/22904

Bandra Tr

Bhuj

 

One AC 3 tier & o­ne AC 2 tier

Ex Bandra Tr.(Wed,Fri,Sun)

01/03/2020

Ex Bhuj (Thu,Sat,Mon)

02/03/2020

7

19409/19410

Ahmedabad

Gorakhpur

One AC 3 tier & Two Sleeper

Ex Ahmedabad(Thu,Fri)

05/03/2020

Ex Gorakhpur (Sat,Sun)

07/03/2020

8

19403/19404

Ahmedabad

Sultanpur

 

OneAC

3 – Tier & Two Sleeper

Ex Ahmedabad(Tue)

03/03/2020

Ex Sultanpur (Wed)

04/03/2020

9

19421/19422

Ahmedabad

Patna

OneAC

3 – Tier & Two Sleeper

 

Ex Ahmedabad (Sun)

01/03/2020

Ex Patna (Tue)

03/03/2020

10

19401/19402

Ahmedabad

Lucknow

OneAC

3 – Tier & Two Sleeper

 

Ex Ahmedabad (Mon)

02/03/2020

Ex Lucknow (Tue)

03/03/2020

11

19407/19408

Ahmedabad

Varanasi

OneAC

3 – Tier & Two Sleeper

 



COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit