For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (HWH)HOWRAH JN to (KGM)KATHGODAM


Address: Howrah Railway Terminus, Station Road, Salkia, Howrah, West Bengal 711101, India

Station Code: HWH

Station Name: HOWRAH JN

Zone: ER/Eastern

Train Frequency Weekly: 991

Station Traffic: High

Address: Kathgodam Railway Station, Kathgodam, Uttarakhand 263126, India

Station Code: KGM

Station Name: KATHGODAM

Zone: NER/North Eastern

Train Frequency Weekly: 105

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
13019BAGH EXPRESSHWH21:45KGM09:3035:45M,TU,W,TH,F,SA,SU2A,3A,SL,GN,13019 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
21-05-2020
CYCLONE “AMPHAN” CAUSES SEVERE DAMAGE TO RAILWAY INSTALLATIONS

Add English content here

दक्षिणपूर्वरेलवे

SOUTH EASTERN RAILWAY

प्रेसविज्ञप्ति

PRESS RELEASE

CYCLONE “AMPHAN” CAUSES SEVERE DAMAGE

TO RAILWAY INSTALLATIONS

 

Kolkata, 21st May, 2020:

 

Cyclone “Amphan” which hit West Bengal and Odishayesterday (21-05-2020) has caused severe damage to several railway installations. Though train services which is operational in a limited way due to nationwide lockdown was totally suspended in Howrah-Kharagpur-Bhadrak Section as a precautionary measurefor the cyclone but station buildings, railway track, signaling system, platform sheds etc. have suffered damages.

Trees were uprooted at several places in Howrah-Kharagpur-Bhadrak Section of SER blocking railway track. Over Head Equipment (OHE) also got damaged at different places. Platform sheds of several stationswere displaced due to the cyclonic storm. Waterlogging o­n railway track wasreported from different locations.

Restoration work has started and is in progress. SER's Disaster Management teams are in action at the damaged sites. The total loss and damages sufferedare under assessment.

 

 





2
19-05-2020
SER GEARS UP SAFETY PRECAUTIONS FOR CYCLONE “AMPHAN”

दक्षिण पूर्व रेलवे

SOUTH EASTERN RAILWAY

प्रेस विज्ञप्ति

PRESS RELEASE

Kolkata, 19.05.2020

SER GEARS UP SAFETY PRECAUTIONS FOR CYCLONE “AMPHAN”

South Eastern Railway has geared up safety precautions In view of cyclone “AMPHAN” which is likely to hit West Bengal and Odisha. Precautionary measures adopted in this regard are as under:

Close watch o­n Railway Bridges, Tracks, Yards & Signaling System

Silt, Vegetation and other obstructions cleared from catch water and side drains

Close coordination with State Govt. officials

All DG sets, diesel drive pump, earth moving equipment’s etc. has been kept ready.

Patrolling at vulnerable locations by deputing patrolmen & Watchmen

Sectional trackmen will patrol the tracks

Tree cutting a road clearing teams are kept in alert at critical locations

Arrangements made to stock sufficient quantities of track maintenance reserve materials

Constant watch over Meteorological Department advisories

Additional Control Room & Disaster Management Cell of SER to be opened

South Eastern Railway has done preparations and ground work to meet the challenges posed by Cyclone AMPHAN. Taking advantage of the meteorological forecasts,SER has planned for early restoration of train traffic and railway track, if affected by AMPHAN. Round the Clock Disaster Management Cell has been opened at SER HQs at Garden Reach and at Divisional Headquarters. Hot line has been established between HQ and divisional Disaster Management Cell.

SER has also taken adequate steps by positioning of Special Teams for early restoration of tracks, signaling system and electrification etc., Safety of Train Operations, to run train, if there will be no electric supply.

Diesel locomotives have been kept in position for utilization during failure of electricity. As Red Alert has been given in coastal areas, SER is keeping watchful eye at all the stations in Howrah – Kharagpur-Bhadrak Section and other sections too.

General Manager, South Eastern Railway has directed the concerned officials to be o­n full alert towards any incident like flood situation near Railway Track and to ensure the safety for staff and their families. The staff and their family members are advised to stay indoors when cyclone hits the territory.Help line number also to be kept operational at HQ and divisions for assistance to employees’ families.

Accordingly, all precautionary measures have been taken. The catch water drains and side drains have been cleared of silt, vegetation and other obstructions to ensure free flow of rain water. The water ways of bridges have been cleared of vegetation and other obstructions.

Close coordination is being maintained with State Govt. officials at different levels. Full Supply Level (FSL) in case of canals & Danger Level (DL) in case of bridges have been painted with bright red band across each pier adjacent to the abutment so as to be clearly visible to the Patrolman, Stationary Watchman and Drivers.

Arrangements have been made not to allow water to stagnate o­n the track. In station yards, the cross drains and longitudinal drains have been cleared/provided proper grades.

Patrolling of Railway tracks by Patrolmen has also been planned. They observe danger or interruption if any and protect the trains from any unusual occurrence. Stationary Patrolmen and Watchmen along with mobile Patrolmen have been deployed in vulnerable sections.

Instructions have been issued that whenever there is heavy rain, the sectional Trackman will organize patrolling of track o­n their own in their beat to make sure that the track is safe for passage of trains and ensure protection at all locations where washouts/slips are likely to occur.

Arrangements have been made to stock sufficient quantities of track & bridge repair reserve materials, viz., boulders, sand, cinder, quarry dust, ballast at identified locations. The Engineering relief vans and their equipments are kept ready. Bridge materials are kept in readiness so that they can be moved as per requirement. SER is in constant touch with Indian Meteorological Department and getting weather alerts o­n hourly basis.

IT HAS BEEN DECIDED THAT THERE SHOULD BE NO PASSENGER CARRYING TRAIN IN KHARAGPUR -BHADRAK SECTIONAND OTHER SECTION TOO IF REQUIRED, AS PER THE INPUTS RECEIVED FROM THE MATEROGICAL DEPARTMENT DURINGTHIS CYCOLONE PERIOD.

As, all passenger carrying trains have already been suspended till further announcement in view of COVID-19, o­nly some Shramik Special Trains, o­ne AC Special Train, Freight and Parcel Express were running as per guidelines of Ministry of Home Affairs. Shramik Special Trains will be suitably controlled, diverted and will not be allowed to run in the vulnerable section.

In view of the above Cyclone forecast, Bhubaneswar-New Delhi-Bhubaneswar AC Special Train has been diverted via Angul-Jharsuguda-Rourkela-Tata route bypassing Bhubaneswar-Hijli (Kharagpur) route for four days.

 

.

 

***********






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit