1 Trains from (EE)ELURU to (LD)LONDA JN
Address: Eluru Railway Station, Eluru, Andhra Pradesh 534005, India
Station Code: EE
Station Name: ELURU
Zone: SCR/South Central
Train Frequency Weekly: 400
Station Traffic: High
Address: Londa Junction, Londa, Karnataka 591301, India
Station Code: LD
Station Name: LONDA JN
Zone: SWR/South Western
Train Frequency Weekly: 185
Station Traffic: High
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.swr.indianrailways.gov.in- 2023-06-15
दकà¥à¤·à¤¿à¤£ पशà¥à¤šà¤¿à¤® रेलवे / SOUTH WESTERN RAILWAY ONE-WAY SPECIAL TRAIN BETWEEN HUBBALLI - VISHAKHAPATNAM It is decided to run a one-way express special (07305) train between SSS Hubballi and Visakhapatnam to clear the extra rush of passengers. On June 17, 2023, at 2 p.m., it will depart from SSS Hubballi and arrive at Visakhapatnam at 4:30 p.m. the next day. The train will have stoppages at Gadag (03:03/03:05 pm), Koppal (03:48/03:50 pm), Hosapete (04:20/04:25 pm), Toranagallu (04:53/04:55 pm), Ballari (06:25/06:30 pm), Adoni (08:43/08:45 pm), Raichur (09:43/09:45 pm), Krishna (10:05/10:10 pm), Chittapur (12:15/12:17 am), Vikarabad (02:15/02:17 am), Lingampalli (03:00/03:02 am), Secunderabad (03:45/04:00 am), Nalgonda (05:30/05:32 am), Guntur (08:00/08:10 am), Vijayawada (09:35/09:45 am), Eluru (10:39/10:40 am), Tadepalligudem (11:13/11:15 am), Rajahmundry (11:59 am / 12:00 pm), Samalkot (12:49/12:50 pm), and Tuni (01:50/01:51 pm). The train will have a composition of 1 AC two tier coach, 4 AC three tier coach, 9 sleeper class, 3 general second class and 2 second class luggage cum brake vans. ಹà³à²¬à³à²¬à²³à³à²³à²¿ - ವಿಶಾಖಪಟà³à²Ÿà²£ ನಡà³à²µà³† ವಿಶೇಷ ರೈಲೠಪà³à²°à²¯à²¾à²£à²¿à²•ರ ಹೆಚà³à²šà³à²µà²°à²¿ ದಟà³à²Ÿà²£à³† ನಿವಾರಿಸಲೠಶà³à²°à³€ ಸಿದà³à²§à²¾à²°à³‚ಡ ಸà³à²µà²¾à²®à³€à²œà²¿ ಹà³à²¬à³à²¬à²³à³à²³à²¿ ಮತà³à²¤à³ ವಿಶಾಖಪಟà³à²Ÿà²£à²‚ ನಿಲà³à²¦à²¾à²£à²—ಳ ನಡà³à²µà³† ವಿಶೇಷ à²à²•ಮà³à²– ಎಕà³à²¸à³â€Œà²ªà³à²°à³†à²¸à³ (07305) ರೈಲನà³à²¨à³ ಓಡಿಸಲೠನಿರà³à²§à²°à²¿à²¸à²²à²¾à²—ಿದೆ. ಅವà³à²—ಳ ಮಾಹಿತಿ ಈ ಕೆಳಗಿನಂತಿದೆ. ಈ ವಿಶೇಷ ರೈಲೠಜೂನೠ17 ರಂದೠಮಧà³à²¯à²¾à²¹à³à²¨ 2 ಗಂಟೆಗೆ ಹà³à²¬à³à²¬à²³à³à²³à²¿ ನಿಲà³à²¦à²¾à²£à²¦à²¿à²‚ದ ಹೊರಟೠಗದಗ (03:03/03:05pm), ಕೊಪà³à²ªà²³ (03:48/03:50pm), ಹೊಸಪೇಟೆ (04:20/04:25pm), ತೋರಣಗಲà³à²²à³ (04:53/04:55pm), ಬಳà³à²³à²¾à²°à²¿ (06:25/06:30pm), ಆದೋನಿ (08:43/08:45pm), ರಾಯಚೂರೠ(09:43/09:45pm), ಕೃಷà³à²£à²¾ (10:05/10:10pm), ಚಿತà³à²¤à²¾à²ªà³à²° (12:15/12:17am), ವಿಕಾರಾಬಾದೠ(02:15/02:17am), ಲಿಂಗಂಪಲà³à²²à²¿ (03:00/03:02am), ಸಿಕಂದರಾಬಾದೠ(03:45/04:00am), ನಲಗೊಂಡ (05:30/05:32am), ಗà³à²‚ಟೂರೠ(08:00/08:10am), ವಿಜಯವಾಡ (09:35/09:45am), à²à²²à³‚ರೠ(10:39/10:40am), ತಾಡೆಪಲà³à²²à²¿à²—à³à²¡à²‚ (11:13/11:15am), ರಾಜಮಂಡà³à²°à²¿ (11:59am/12:00pm), ಸಾಮಲಕೋಟà³â€Œ (12:49/12:50pm), ತà³à²¨à²¿ (01:50/01:51pm) ಈ ನಿಲà³à²¦à²¾à²£à²—ಳ ಮೂಲಕ ಮರà³à²¦à²¿à²¨ ಸಂಜೆ 4:30 ಗಂಟೆಗೆ ವಿಶಾಖಪಟà³à²Ÿà²£ ನಿಲà³à²¦à²¾à²£à²µà²¨à³à²¨à³ ತಲà³à²ªà²²à²¿à²¦à³†. ಈ ರೈಲೠಎಸಿ ಟೠಟೈಯರೠಬೋಗಿ (1), ಎಸಿ ತà³à²°à²¿ ಟೈಯರೠಬೋಗಿಗಳೠ(4), ಸà³à²²à³€à²ªà²°à³ ಕà³à²²à²¾à²¸à³ ಬೋಗಿಗಳೠ(9), ಸಾಮಾನà³à²¯ ದà³à²µà²¿à²¤à³€à²¯ ದರà³à²œà³† ಬೋಗಿಗಳೠ(3) ಮತà³à²¤à³ ಸೆಕೆಂಡೠಕà³à²²à²¾à²¸à³ ಲಗೇಜೠಕಮೠಬà³à²°à³‡à²•ೠವà³à²¯à²¾à²¨à³â€Œ ಬೋಗಿಗಳೠ(2) ಸೇರಿದಂತೆ ಒಟà³à²Ÿà³ 19 ಬೋಗಿಗಳ ಸಂಯೋಜನೆಯನà³à²¨à³ ಹೊಂದಿದೆ. Aneesh Hegde 2
www.swr.indianrailways.gov.in- 2023-06-08
दकà¥à¤·à¤¿à¤£ पशà¥à¤šà¤¿à¤® रेलवे / SOUTH WESTERN RAILWAY STATUTORY INSPECTION OF NEWLY DOUBLED UGARKHURD – VIJAYANAGAR RAILWAY SECTION The doubling of railway track between Ugarkhurd – Vijayanagar (18.5 km) has been completed at a cost of Rs. 210 crore. Statutory inspection by Commissioner of Railway Safety is scheduled on 09.06.2023. After the inspection and compliances to various safety norms, the newly laid track will be open for railway service. The doubling is part of Londa – Miraj project sanctioned in 2015-16. The project is 100% funded by Ministry of Railways. So far, 154 km out of 186 km had been commissioned. The stretch from Londa – Ghataprabha was dedicated by Hon’ble PM in March 2023. Doubling of railway track enhances the capacity as well as safety. Not only can more number of trains be operated, but the direction of traffic is fixed (Up line and Down Line) and express / passenger trains need not wait for crossing of other trains (passenger or goods). The Newly doubled section between Ugarkhurd – Vijayanagar consists of 02 major bridges, 27 minor bridges and 2 Road Over Bridges. There are three stations namely Ugarkhurd, Vijayanagar & Shedbal. During the statutory inspection of commissioner of Railway Safety, speed trial will be carried out, therefore public are cautioned to the be careful and not trespass the railway tracks. Aneesh Hegde
COMMENTS
NO Comments. Be the first to Comment...
|