3 Trains from (aii)ajmer jn to (rkb)raika bagh
Address: Ajmer Junction, Ajmer, Rajasthan 305001, India
Station Code: AII
Station Name: AJMER JN
Zone: NWR/North Western
Train Frequency Weekly: 425
Station Traffic: High
Address: Raikabag Railway Station, State Highway 61, Jodhpur, Rajasthan 342006, India
Station Code: RKB
Station Name: RAIKA BAGH
Zone: NWR/North Western
Train Frequency Weekly: 164
Station Traffic: High
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.sr.indianrailways.gov.in- 2023-06-09
In order to clear Extra rush of passengers during Nagore Festival, Special Fare Special Trains will be run in Tambaram – Karaikal Sector as detailed below: Train No.06045/06046 Tambaram – Karaikal – Tambaram Special Fare Specials: Train No. 06045 Tambaram – Karaikal Special Fare Special will leave Tambaram at 08.15 hrs on 21st June, 2023 (Wednesday) and reach Karaikal at 15.50 hrs, the same day (1 Service) In return direction Train No. 06046 Karaikal – Tambaram Special Fare special will leave Karaikal at 06.00 hrs on 22nd June, 2023 (Thursday) and reach Tambaram at 13.30 hrs, the same day (1 Service) Coach Composition: 03 – Sleeper Class Coaches, 08- Second Class Coaches, 2- Chair Cars, 1- Second Class Divyangjan Friendly & 1- Luggage cum Brake Van The details of timings and stoppages of Train No.06045/06046 Tambaram – Karaikal – Tambaram Special Fare Specials are as follows (Timings in hours):
Advance Reservation for the above Special Fare Special Trains will open at 08.00 hrs on 10th June, 2023 (Tomorrow)
Follow us https://twitter.com/GMSRailway https://www.facebook.com/ (B.Guganesan) Chief Public Relations Officer 2
www.cr.indianrailways.gov.in- 2023-05-23
General Manager reviews monsoon preparations Central Railway gears up with monsoon preparations Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling were also present. The details of measures taken for ensuring uninterrupted services are as under- 1)More Water Pumps- 24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP. The locations identified on main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and on Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc. 2)Micro tunnelling- Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section. 3)Desilting of drains- Central Railway has targeted de-silting and cleaning of 118.48 kms of drains on its suburban section of which, work has been completed for 102.39 kms and work is presently in progress on cleaning of another 16 kms of drains. 4)Cleaning of culverts- CR has cleaned 88 culverts on its suburban sections, and work is presently in progress on cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar. 5)Trimming of Trees- Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees. 6)Muck removal- Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck on Main lines. 7)Lifting of tracks- 47.8 km track lifting planned, it will be completed till next month. 8) Works done in Ghat Section- -45 meters of Tunnel Portal -300 mts of Rockfall Barrier -500 sq mts of Boulder Netting -40 mts of Canadian Fencing -160 mts of Stabilization of banks -tunnel sounding- 18 locations 9)Separate pumps will be provided for RUBs- at 14 locations. 10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve. 11)Other Important works in progress- ·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week. ·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections. ·Waterproof point motor machines provided at- 277 locations. ·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month. ·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas. ·Bunter Bhavan nallah at LTT to be connected by removing encroachments. ·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders. ·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti. 12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed. 13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates. 14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period. 15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC. --- --- --- Date: May 23, 2023 PR No. 2023/05/23 This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai (Shivraj Manaspure) Chief Public Relations Officer |