2 Trains from (TAN)TARANA ROAD to (SRID)SHRIDHAM
Address: Madhya Pradesh 456665, India
Station Code: TAN
Station Name: TARANA ROAD
Zone: WR/Western
Train Frequency Weekly: 81
Station Traffic: Medium
Address: Gotegaon, Madhya Pradesh 487118, India
Station Code: SRID
Station Name: SHRIDHAM
Zone: WCR/West Central
Train Frequency Weekly: 211
Station Traffic: High
Trains
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
To Check Ticket Availibility Click Classes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
RECENT NEWS
1
www.scr.indianrailways.gov.in- 2021-07-01
The biggest challenge in doing this work was road traffic block, as this ROB is oÂne of the busiest passages into the city of Valsad from Mumbai-Delhi highway. Work oÂn Freight Corridor proceeds oÂn inspite of Covid challenges that came in the way. Indian Railways’ PSU, Dedicated Freight Corridor Corporation of India (DFCCIL) has completed work of dismantling and reconstruction (after making way for DFC tracks) of Valsad Road Over Bridge (ROB) oÂn the Western Dedicated Freight Corridor in the state of Gujarat in a record 20 day time. Working in tandem with various Government agencies and the civil administration, the ROB which funnels busy traffic into Valsad ROB from the Mumbai-Delhi highway, a 20 day traffic block was secured oÂn 02.06.2021 for dealing with this challenge. Background: Work in Western DFC’s Vaitarana – Sachin section faced a bottleneck of crossing a ROB near Valsad Town in South Gujarat. The ROB work could not be started due to various limitations and track laying activities would have been adversely affected. Track laying projects using state of the art New Track Construction (NTC) machine, would have been affected. The Solution: The project team geared up to take up this challenge. After many brainstorming sessions, an innovative solution was arrived at. The solution proposed was to insert a Twin precast box of 16m x 10m size oÂn the approach of the ROB to take the NTC forward through it. The biggest challenge in doing this work was road traffic block, as this ROB is oÂne of the busiest passages into the city of Valsad from Mumbai-Delhi highway. The whole work is planned to be completed in 20 days road traffic block. Extensive arrangements were made for pre-casting of these huge segments. Despite lock-downs and travel restrictions, a team of approximately 150 nos, including senior engineers toiled day & night to finish the casting works. Road traffic block was granted by the district administration of Valsad, responding favorably to the proposal. The road traffic block of 20 days commenced oÂn 02-06-2021 and the work is progressing as per planning. Four heavy duty hydraulic cranes having capacity varying from 300 MT to 500 MT are mobilized for the installation of these segments. Another challenge that was difficult to handle was solved by innovation in local handling of the segments. The precast segments are too big & heavy to handle without causing any internal stresses during handling. The Project Team has designed a special carrier using a multi-axle trailer fitted with a steel platform oÂn it. The fabrication of the steel platform was completely done at site even during the period when the industrial oxygen supply was prohibited in the country. The team could overcome all such constraints by continuously striving for alternatives and by taping the collective wisdom & experience of the team. It may be noted that the Western Corridor connecting Dadri in Uttar Pradesh to Jawaharlal Nehru Port (JNPT) in Mumbai will traverse through the states of UP, Haryana, Rajasthan, Gujarat and Maharashtra of WDFC & EDFC. WDFC’s 306 km Rewari - Madar section was dedicated to the nation oÂn 07.01.2021. Trial run of 369 km of WDFC between New Palanpur to New Kishangarh has been done. EDFC’s 351 km New Bhaupur - New Khurja section and the Operation Control Centre at Prayagraj were dedicated to the nation by the Hon’ble PM oÂn 29.12.2020. A total of approx. 2800 route Km of the whole WDFC and EDFC (excluding the Sonnagar – Dankuni PPP section) will be commissioned by June 2022. In the commissioned sections, a total of more than 4000 trains have been run. In Eastern DFC, it has more than 3000 trains and in WDFC more than 1000 trains. Total GTKM has crossed the 3 million ton mark. Some of the trains in the section are achieving an average speed of 99.38 kmph in EDFC and 92 kmph in WDFC. These speeds are comparable to any of the fastest mail express trains. 2
www.cr.indianrailways.gov.in- 2020-11-30
Central Railway Press Release Special Trains from Mumbai to Nagercoil and Varanasi Railways will run special train (four days a week) between Mumbai and Nagercoil and superfast special train between Mumbai and Varanasi as per details given below: 1. Mumbai-Nagercoil Special Train (4 days week) 06340 special will leave Nagercoil at 06.00 hrs on every Mon, Tue, Wed, Fri from 7.12.2020 till further advice and arrive Chhatrapati Shivaji Maharaj Terminus at 19.15 hrs next day. 06339 special will leave Chhatrapati Shivaji Maharaj Terminus at 20.35 hrs on every Tue, Wed, Thu, Sat from 8.12.2020 till further advice and arrive Nagercoil 10.20 hrs on third day. Halts: Dadar, Thane, Kalyan, Karjat (for 06339 only), Pune, Daund, Kurduwadi, Solapur, Kalaburagi, Wadi, Yadgir, Raichur, Mantralayam Road, Adoni, Guntakal, Anantapur, Dharmavaram, Kadiri, Madanpalle Road, Pakala, Chittoor, Katpadi, Tiruppatur, Salem, Namakkal (for 06340 only), Karur, Dindigul, Madurai, Virudhunagar, Satur, Kovilpatti, Tirunelveli, Nanguneri, Valliyur. Composition: one AC-2 Tier, Four AC-3 Tier, 10 Sleeper Class and 2 second class seating and one pantry car. REERVATION: Bookings for the fully reserved special train no. 06339 will open on 2.12.2020 at all computerised reservation centres and on website www.irctc.co.in. 2. Mumbai-Varanasi Special Train (daily) 02193 superfast special will leave Chhatrapati Shivaji Maharaj Terminus at 00.10 hrs from 1.12.2020 (midnight of 30.11.2020/1.12.2020) till further advice and arrive Varanasi at 03.30 hrs next day. 02194 superfast special will leave Varanasi at 10.00 hrs from 1.12.2020 till further advice and arrive Chhatrapati Shivaji Maharaj Terminus at 11.25 hrs next day. Halts: Dadar, Thane, Kalyan, Nashik Road, Manmad, Chalisgaon, Pachora, Jalgaon, Bhusaval, Burhanpur, Khandwa, Itarsi, Pipariya, Narsingpur, Shridham, Madan Mahal (for 02193 only), Jabalpur, Katni, Maihar, Satna, Manikpur, Prayagraj Chheoki, Vindhyachal, Mirzapur, Chunar, Kashi NOTE: 01093/01094 Mumbai-Varanasi special is classified as superfast with new number 02193/02194 w.e.f. 1.12.2020. Due to system constraint train no.01093 will be defined as superfast and superfast charges will be collected till the new 02193 is defined in the system.Passengers already booked their tickets on this train for journeys from 1.12.2020 and beyond will have to pay pending superfast charges on train. Only passengers having confirmed tickets will be permitted to board these special trains Passengers are advised to adhere all norms, SOPs related to COVID19 during the boarding, travel and at destination. --- --- — Date: November 30, 2020 PR No.2020/11/58 & 61 This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai (Shivaji Sutar) Chief Public Relations Officer
COMMENTS
NO Comments. Be the first to Comment...
|