For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








3 Trains from (KNE)KISHANGANJ to (KNW)KHANDWA


Address: Kishanganj, Bihar, India

Station Code: KNE

Station Name: KISHANGANJ

Zone: NFR/Northeast Frontier

Train Frequency Weekly: 357

Station Traffic: High

Address: Khandwa Railway Station, Khandwa, Madhya Pradesh 450001, India

Station Code: KNW

Station Name: KHANDWA

Zone: CR/Central

Train Frequency Weekly: 406

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
15648GHY LTT EXPRESSKNE01:00KNW09:5532:55TU2A,3A,SL,GN,15648 Status
15646GHY LTT EXPKNE02:40KNW09:5531:15W,SU2A,3A,SL,GN,15646 Status
12520KYQ LTT AC EXPKNE04:21KNW08:3528:14TH1A,2A,3A,12520 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2525-05-2023
Annual Conference of Operations department of Central Railway conducted today 24/05/23



Annual Conference of Operations department of Central Railway conducted today 24/05/23

Shri Naresh Lalwani, General Manager, Central Railway addressed the Senior Divisional Operations Manager’s Annual Conference at Mumbai HQ o­n 24.5.2023.

Shri Alok Singh, Additional General Manager and Shri Mukul Jain, Principal Chief Operations Manager, Central Railway were also present. The conference was attended by Heads of Coaching section, Planning section and Goods section of Operations Department of Central Railway and Operations Department Heads of Mumbai, Bhusawal, Nagpur, Pune and Solapur Divisions.

The targets and achievements of upcoming year 2023-24 have been discussed in conference as follows-

1) Goods loading-

In year 2021-22- 76.16 million tonne (MT) goods loading achieved by CR.

In year 2022-23- 81.88 million tonne goods loading achieved by CR.

In year 2023-24- 90.05 million tonne target of goods loading has been set by CR.

2) Coal loading -

Out of above total loading, coal is highest commodity loading.

In 2021-22- 39.52 MT loading done.

In 22-23- 37.17 MT loading done.

In 23-24- target of 40.95 MT coal loading has been set.

3) Cement loading-

In 22-23- 7.48 MT loading achieved.

In 23-24- target of 8.8 MT is set.

Major plants of Cement loading are- ACC/Wadi/Solapur, ACC/Ghuggus/Nagpur, Ultratech cement/Hotgi/Solapur, Orient cement/Bhadli/Bhusawal.

4) New infrastructures lines completed-

-Bhusawal-Jalgaon new 3rd line & 4th line of 24.13 km completed in year 2022-23.

-Jalgaon-Pachora new 3rd line of 47.59 km completed in year 2022-23.

5) New infrastructure lines under progress-

-Nagpur-Wardha 3rd& 4th line

-Bhusawal-khandwa 3rd & 4th line

-3rd line in Nagpur-Etarasi, Bhusawal-Wardha, Jalgaon-Manmad.

6) Parcel loading hubs-

Bhiwandi, Jalgaon, Ajni/Nagpur have been developed as major parcel loading points.

In 2022-23- 312 parcel train loaded with 764759 tonnage and 45.86 Crores revenue earning.

7) Improvement of goods sheds under progress-

It will be completed in this 2023-24 year. Circulating area, lighting, approach road, labour room, merchant room etc will be renewed.

-Mumbai division- Kalamboli

-Bhusawal division- Kasbe Sukane, Borgaon, Khamgaon, Savda, Burhanpur, Nandgaon

-Nagpur- Tadali, Ballarshah, Kalmeshwar, maramjhiri.

-Pune- Nira, Loni,

-Solapur- Vilad, Ahmednagar, Belapur, Daund, Arag.

8) Daily goods train interchange-

In 2021-22- 317 goods trains taken over/handed over daily by CR with other railway zones.

In 22-23- 336 goods train interchange daily by CR. It's 18.4% increase capacity handling.

9) Infrastructural works completed to increase mail express and goods train mobility-

-Electrification completed at Roha yard, Gurumarket yard/Pune div, Solapur yard, Barshi yard/Solapur yard, Bale yard/solapur div.

-OHE Overhead wire new substations completed at- Karad/Pune div, Ausa/Solapur div, Gaudgaon/Solapur div, Nagothane/Mumbai div.

10) Critical bottleneck infrastructure works completed in year 2022-23-

-Daund- Gulbarga doubling

-Wardha- Chitoda 2nd cord line

-Khapri-Nagpur-Godhani- 20 km automatic signalling system.

-Kamshet/pune div- loop lines extention.

--- --- ---

Date: May 24, 2023

PR No.2023/05/25

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.



(Shivraj Manaspure)
Chief Public Relations Officer




2
14319-05-2023
Maligaon
Agartala – Kolkata special with modern AC LHB rake flagged off, Services of Guwahati – Kolkata special train extended

Maligaon, 17th May, 2023:

Northeast Frontier Railway (NFR) has been continuously striving to provide a safer, faster and more comfortable travelling experience to the people of the North Eastern region. For that the conventional ICF model rake of train no. 02502/02501 (Agartala – Kolkata - Agartala) special has been converted to a fully Air Conditioned LHB (Linke Hofmann Busch)rake. The train with LHB coaches was flagged off o­n 17th May, 2023 from Agartala Railway Station at 07:30 hrs by Kumari Pratima Bhoumik, Hon’ble Union Minister of State for Social Justice and Empowerment. Shri Prem Ranjan Kumar, Divisional Railway Manager, Lumding along with other senior officials of division were also present at Agartala Railway Station during the flagging off ceremony.

The train no. 02502 (Agartala - Kolkata) special will depart from Agartala o­n every Wednesday for eight trips from 17th May to 05thJuly, 2023 at 07:30 hours to reach Kolkata at 15:00 hours o­n the next day. In return direction, train no. 02501 (Kolkata – Agartala) special will depart from Kolkata o­n every Sunday for eight trips from 21st May to 09thJuly, 2023 at 21:40 hours to reach Agartala at 05:15 hours o­n Tuesday.

During it’s both ways journey, the special train will run via New Karimganj Jn., New Haflong, Guwahati, Goalpara Town, New Alipurduar, New Jalpaiguri Jn, Kishanganj, Malda Town, Azimganj Jn and Bandel Jn. The train will run with a revised composition consisting of 13 LHB coaches. It will have eleven state of the art AC-3 Economy Class coaches for the convenience of the passengers with two Luggage cum Generator coaches.

The newly converted coaches will be of LHB rake with AC-3 Economy coaches which is safer and more comfortable as compared to the earlier ICF coaches. These coaches have improved and modular design of seats and berth. The AC-3 Economy has 2 side berths, making it a total of 8 berths per compartment, thereby leading to increased number of seats. Moreover, the fare structure for AC-3 Economy is roughly 8% lesser than 3 AC coaches. So, passengers can travel in much cheaper than 3 AC coaches.

Further, the services of train no. 02518/02517 (Guwahati – Kolkata – Guwahati) has been extended for another eight trips. The train no. 02518 (Guwahati - Kolkata) special will depart from Guwahati o­n every Saturday for eight trips from 20th May to 08th July, 2023 at 21:00 hours to reach Kolkata at 15:00 hours o­n the next day. In return direction, train no. 02517 (Kolkata – Guwahati) special will depart from Kolkata o­n every Thursday for eight trips from 18th May to 06th July, 2023 at 21:40 hours to reach Guwahati at 16:15 hours o­n the next day.

The details of stoppages and timings of these trains are available at IRCTC website and through NTES and are also being notified in various newspapers and social media platforms of N.F. Railway. Passengers are requested to verify the details before undertaking their journey.

 



(Sabyasachi De)
CPRO/N.F.Railway





COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit