For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

CHIT BARAGAON

STATION INFO

Address: Chit Baragaon Railway Station, Chitbaragaon, Uttar Pradesh 221713, India

Station Code: CBN)CHIT BARAGAO

Station Name: CBN)CHIT BARAGAON

Zone: NER/North Eastern

Total Unique Trains: 12

Train Frequency Weekly: 71

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
63298BUI BCY MEMU05:0405:051M,TU,W,TH,F,SA,SUUNRESERVED
55133BUI BCY PASS06:1006:111M,TU,W,TH,F,SA,SUUNRESERVED
55014BCY CPR PASS08:1808:202M,TU,W,TH,F,SA,SUUNRESERVED
15159SARNATH EXPRESS08:4608:482M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
55131CPR BCY PASS10:2110:232M,TU,W,TH,F,SA,SUUNRESERVED
75104BCY PEP DEMU12:3612:371M,TU,W,TH,F,SAUNRESERVED
75103PEP BCY DEMU13:3313:341M,TU,W,TH,F,SAUNRESERVED
55132BCY CPR PASS16:0316:052M,TU,W,TH,F,SA,SUUNRESERVED
55013CPR BCY PASS17:2117:232M,TU,W,TH,F,SA,SUUNRESERVED
15160SARNATH EXPRESS18:5819:002M,TU,W,TH,F,SA,SU1A,2A,3A,SL,GN
55134BCY BUI PASS19:5119:532M,TU,W,TH,F,SA,SUUNRESERVED
63297BCY BUI MEMU20:3120:321M,TU,W,TH,F,SA,SUUNRESERVED
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
Press Release No. 14219-06-2020
Hubballi
Press Release No. 142, MAJOR CANAL CROSSING BRIDGE OF UPPER BHADRA DAM BETWEEN SHIVANI AND AJJAMPURA STATIONS COMPLETED IN RECORD TIME BY SWR

प्रेस विज्ञप्तिPress Release No. 142  Dt: 17.06.2020

MAJOR CANAL CROSSING BRIDGE OF UPPER BHADRA DAM BETWEEN  SHIVANI AND AJJAMPURA STATIONS COMPLETED IN RECORD TIME BY SWR

Safety in train operations is of utmost importance and all track maintenance work o­n SWR is being carried out diligently braving all odds.   Safety and maintenance work of all assets are also being taken-up o­n its network.

Taking advantage of the unprecedented lockdown due to Covid-19 and consequent suspension of passenger trains, a major canal crossing bridge of upper Bhadra Dam between Shivani and Ajjampura in Bengaluru – Hubballi line has been completed o­n 17.06.2020. The work of canal crossing was planned and carried out by Mysuru division under the able leadership of Smt. Aparna Garg, DRM/Mysuru.

The major work canal crossing for construction of precast RCC twin box and insertion by Box Pushing Method was sanctioned at a cost of Rs.14.72 Cr. as a deposit work by the State  Government  of Karnataka. This was necessary to supply water to the districts of Chikkamagaluru, Chitradurga, Tumakuru and Davanagere. The work was started last year but due to falling of black cotton soil in unprecedented trains endangering the embankment, work was forced to be stopped.

Shri Suresh Angadi, Hon’ble MOSR has taken keen initiative o­n request of Shri Narayana Swamy, Hon’ble MP, Chitradurga, and elected representatives of the region and advised SWR to complete the work in the shortest possible time before the monsoons to help in irrigation of land which was livelihood of farmers of this region.

The work was first proposed to be taken up by suspending train services o­n this line. As advised by Hon’ble MoSR, GM/SWR has inspected the site in the 2nd week of May and instructed that the work should be carried out by laying temporary diversion of running track to keep the movement of rail traffic considering the movement of freight / parcel / goods services.

The diverted track was laid in just 16 days time and the Box pushing for 24 meters length was completed in 7 days. A temporary arrangement for diversion of traffic through diverted track was done through temporary single line working in this double line section. Both lines were re-commissioned in 3 days.  Engineering Branch officers of Mysuru division, Shri Ravichandran, Sr.DEN/Co-rd and Shri Venkat Rao, Sr.DEN/N have been instrumental in completing the work in time.

Shri A. K. Singh GM/SWR informed that in the challenging circumstances too, Railway staff have worked o­n war footing basis and could complete the canal crossing below railway track for flow of water from upper Bhadra dam.

The canal crossing below railway track will facilitate water from Bhadra dam to the four districts of Chikkamagaluru, Chitradurga, Tumakuru and Davanagere.  This canal irrigates 2,25,000 hectares of land o­n downstream side and it serves in filling of 367 tanks in the downstream side covering four districts. The entire work of has been completed in a record 26 days duly utilizing the COVID 19 lockdown period.   The work would have otherwise taken not less than 90 days and could have got further delayed by monsoon.  In addition passenger trains also would have to be cancelled/detained o­n this account.


                                                                                          Chief Public Relations Officer

                                                                              South Western Railway, Hubballi





2
18-06-2020
EXTENSION OF DAYS OF RUN OF SHALIMAR-RANCHI-SHALIMAR PARCEL EXPRESS

दक्षिणपूर्वरेलवे

SOUTH EASTERN RAILWAY

प्रेसविज्ञप्ति

PRESS RELEASE

EXTENSION OF DAYS OF RUN OF

SHALIMAR-RANCHI-SHALIMAR PARCEL EXPRESS

 

Kolkata, 18thJune, 2020:

 

It has been decided to extend the run of Shalimar-Ranchi-Shalimar Tri-weekly Time Tabled Parcel Express for another 06(six) months w.e.f. 16th June, 2020 leaving Shalimar and Ranchi o­n every Monday, Wednesday and Friday.

 

00801 Shalimar-Ranchi Tri-weekly Parcel Express leaving Shalimar every Monday, Wednesday and Friday at 10:00 hours will reach Ranchi at 19:45 hours o­n the same day. In the return direction, 00802 Ranchi-Shalimar Tri-weekly Parcel Express leaving Ranchi every Monday, Wednesday and Friday at 22:15 hours will arrive Shalimar at 07:30 hours o­n the next day. The train will have stoppages at Kharagpur, Tatanagar, Purulia and Muri in both the directions.

 

***********

 








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search