For a Proper experience on Trainspy.com, enable JavaScript in your browser

Search For Trains   

POCHARAM

STATION INFO

Address: Unnamed Road, Andhra Pradesh 507210, India

Station Code: PCZ)POCHARA

Station Name: PCZ)POCHARAM

Zone: scr/south central

Total Unique Trains: 12

Train Frequency Weekly: 73

Station Traffic: Medium

ALL PASSING TRAINS
Print Table

To Check Ticket Availibility Click Classes
TrainTrain NameArrDepHaltDaysClasses
Arrival
57625KAKATIYA F PAS00:1900:201M,TU,W,TH,F,SA,SUSL,GN
57626KAKATHIYA F PSR02:1602:171M,TU,W,TH,F,SA,SUSL,GN
17026SC MUGR EXPRESS03:3903:401M,TU,W,TH,F,SA,SU2A,3A,SL,GN
57123BDCR SRUR PASS06:5006:511M,TU,W,TH,F,SA,SUUNRESERVED
57145DKJ BDCR PASS08:5909:001M,TU,W,TH,F,SA,SUUNRESERVED
57657MUGR KZJ PASS09:1909:201M,TU,W,TH,F,SA,SUUNRESERVED
67245BZA BDCR MEMU11:2711:281M,TU,W,TH,F,SA,SUUNRESERVED
67246BDCR BZA MEMU14:5214:531M,TU,W,TH,F,SA,SUUNRESERVED
57658KZJ MUGR PASS15:5815:591M,TU,W,TH,F,SA,SUUNRESERVED
57146BDCR DKJ PASS18:2718:281M,TU,W,TH,F,SA,SUUNRESERVED
57124BPQ BDCR PASS19:1919:201M,TU,W,TH,F,SA,SUUNRESERVED
17025MUGR SC EXPRESS23:3923:401M,TU,W,TH,F,SA,SU2A,3A,SL,GN
TrainTrain NameArrDepHaltDaysClasses
Departure



RECENT NEWS

1
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.414/2022-2303-08-2022
Secunderabad
PR No. 414 - SCR to Restore Daily Passenger Trains




South Central Railway will be RESTORED daily passenger trains to run as per schedule as detailed below:

Restoration of Passenger Trains:

 

Sl. No

Tr. No

Old Tr. No

From – To

Dep

Arr

w. e. f

1

17261

67232

Guntur – Tirupati

16.30

04.25 (next day)

18.08.2022

2

17262

67231

Tirupati – Guntur

19.35

08.00 (next day)

19.08.2022

3

17659

57625

Secunderabad – Bhadrachalam Rd

18.50

03.30 (next day)

18.08.2022

4

17660

57626

Bhadrachalam Rd – Secunderabad

01.00

09.20

19.08.2022


Train No. 17261/17262 Guntur – Tirupati – Guntur Daily Express:

These trains will stop at Narasaraopet, Vinukonda, Donakonda, Markapuram Rd, Cumbum, Giddalur, Nandyal, Banaganepalle, Proddatur, Yerraguntla, Kamalapuram, Kadapa, Nandaluru, Razampet, Koduru and Renigunta stations in both the directions. These trains will consists of 3A, Sleeper and General Second Class Coaches.

 

Train No. 17659 Secunderabad – Bhadrachalam Rd Daily Express:

This train will stop at Moula-Ali, Charlapalli, Ghatkesar, Bibinagar, Bhongir, Yadadri, Aler, Jangaon, Raghunathpalli, Ghanapur, Kazipet, Warangal, Chintalpalli, Yelgur, Intekanne, Kesamudram, Mahbubabad, Dornakal, Pocharam, Karepalli and Gandhipuram stations. These trains will consist of 3A, Sleeper and General Second Class Coaches.

 

Train No. 17660 Bhadrachalam Rd - Secunderabad Daily Express:

This train will stop at Gandhipuram, Karepalli, Pocharam, Dornakal, Garla, Gundrathimadugu,  Mahbubabad, Tadlapusalapalli,  Kesamudram,  Intekanne, Nekkonda,  Yelgur, Chintalpalli,  Warangal,  Kazipet, Pindial,  Ghanapur,  Raghunathpalli,  Jangaon,  Aler,  Yadadri, Bhongir, Bibinagar, Ghatkesar, Charlapalli, Moula-Ali stations. These trains will consist of 3A, Sleeper and General Second Class Coaches.





2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.601/2020-2111-02-2021
Secunderabad
Shri Gajanan Mallya, General Manager, SCR conducts Annual Inspection of Secunderabad Division






- New Crossing station, Pocharam inspected

- Annual Inspection conducted between Bhadrachalam Road –- Kazipet – Secunderabad section

Shri Gajanan Mallya, General Manager, South Central Railway undertook Annual Inspection of Bhadrachalam Road – Dornakal - Kazipet – Secunderabad sections of Secunderabad Division today i.e., 10th February, 2021. He was accompanied by Shri A.K.Gupta, Divisional Railway Manager, Secunderabad Division and Principal Head of the Departments throughout the inspection.

The General Manager commenced the inspection at Bhadrachalam Railway Station and inaugurated the renovated Crew Lobby, 20 KWp o­n Grid Solar Power Plant and Model Track Maintainers Room at Bhadrachalam Railway Station. Shri Gajanan Mallya planted saplings towards green environment in the premises of Model Track Maintainers Rest Room at Bhadrachalam during the inspection. The General Manager inaugurated & inspected the renovated Health Unit, Bhadrachalam. He carried out a speed test between Bhadrachalam and Dornakal sections.

The General Manager inspected Pocharam Railway Station, a new crossing station. A new crossing station provided between Bhadrachalam Road and Dornakal Junction will facilitate the train operations and ease the congestion in train movements. The provision will also help in speeding up the freight and passenger trains.

The General Manager inspected newly constructed Road under Bridge between Bhadrachalam - Dornakal section. Later, during the inspection, GM, SCR inaugurated new running room and 1000 LPD solar hot water for running room at Dornakal station. He inspected safety aspects at Major Girder Bridge between Garla - Gundratimadugu stations in Dornakal – Kazipet section. During the inspection the General Manager also interacted with Track Maintainers of Gang Unit No.8 and enquired about the safety practices being followed.

The General Manager comprehensively inspected the Warangal Railway station and its premises and discussed and reviewed the development works. Later, the General Manager inspected Ghanpur Railway Station where he also visited the Railway colony and interacted with the family members of the employees about the facilities provided. He also interacted with track maintainers of Gang unit no. 7 and later had a meeting with representatives of various trade unions. During the inspection, the General Manager also inspected overall track maintenance between these sections and also conducted speed test between Jangaon – Pagidipalli.








COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit


Latest Search