For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








0 Trains from (UDZ)UDAIPUR CITY to (ADI)AHMEDABAD JN


Address: Udaipur, Rajasthan, India

Station Code: UDZ

Station Name: UDAIPUR CITY

Zone: NWR/North Western

Train Frequency Weekly: 147

Station Traffic: Medium

Address: Ahmedabad Railway Station, Ahmedabad, Gujarat 380002, India

Station Code: ADI

Station Name: AHMEDABAD JN

Zone: WR/Western

Train Frequency Weekly: 811

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
Since no Direct Trains Try Nearest Via Stations
Nearest From (UDZ)UDAIPUR CITY
(mvj)mavli jn 37Kms from (UDZ)UDAIPUR CITY
(cor)chittaurgarh 99Kms from (UDZ)UDAIPUR CITY
(nmh)nimach 117Kms from (UDZ)UDAIPUR CITY

Nearest From ADI
(brc)vadodara jn 100Kms from (ADI)AHMEDABAD JN
(gda)godhra jn 108Kms from (ADI)AHMEDABAD JN
(bh)bharuch jn 154Kms from (ADI)AHMEDABAD JN
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
Press Release No. 50517-01-2022
Hubballi
Press Release No. 505, 40 TRAINS ON SWR GO SILENT BY RUNNING ON HOG

             दक्षिण पश्चिम रेलवे / SOUTH WESTERN RAILWAY               प्रेस विज्ञप्ति / Press Release No. 505 Dt: 15.01.2022

40 TRAINS o­n SWR GO SILENT BY RUNNING o­n HOG

·POWER CARS   THAT RUN o­n END o­n GENERATION  REPLACED WITH HEAD o­n  GENERATION

·BY USING HOG RS.70.12 CRORE FUEL SAVED FOR THE YEAR 2021

In a new environmental-friendly initiative, Indian Railway has cut down o­n its fuel bills by introducing HOG (Head-on-Generation) technology o­n trains. 

On South Western Railway (SWR) HOG technology has been introduced since November -2019, so far in 40 trains o­n its network. For HOG to be adopted the trains shall have LHB coaches and shall be hauled by electric traction.

The HOG technology is being implemented in trains to caters the power needs of coaches such as air-conditioning and lighting.  Earlier two power cars known as end o­n generators (EOG) housing Diesel Generators were attached to the trains to generate power for providing air conditioning and extending lighting in coaches. 

  In HOG system, the power supply to electrical equipment’s in LHB coaches is supplied from HOG compatible Electrical LOCO by tapping Over Head Power lines, there by resulting in huge reduction in consumption of HSD (High Speed Diesel). Besides saving in HSD, The Noise due to operation of DG sets is totally eliminated in HOG system.  Due to fast pace of electrification in SWR, more and more trains will be run with HOG system in future.

In place of power coaches additional coaches can be attached to trains and additional berths will be available for passengers every day.

Shri Sanjeev Kishore, General Manager, South Western Railway has informed that in SWR, at present, 40  trains are running with HOG system. The Estimated savings o­n account of reduction in HSD (High Speed Diesel) consumption in power cars, by using HOG trains,for the month of  Dec-2021 alone  is Rs. 6.93 Cr and for the  entire Year 2021 is Rs. 70.12 Cr.

The list of trains which have been converted to HOG technology o­n SWR so far are as follows:

1.Train No.12028/27 KSR Bengaluru – MGR Chennai Central–KSR Bengaluru Shatabdi Express

2.12608/07 KSR Bengaluru – MGR Chennai Central -KSR Bengaluru Lalbagh Express

3.Train No.12609/10 MGR Chennai Central – Mysuru – MGR Chennai Central Express

4.Train No.12253/54 Yesvantpur – Bhagalpur – Yesvantpur Anga Express

5.Train No.16526/25 KSR Bengaluru – Kanniyakumari - KSR Bengaluru Island Express

6.Train No.16593/94 KSR Bengaluru – Nanded – KSR Bengaluru Express

7.Train No.22691/92 KSR Bengaluru – Hazrat Nizamuddin – KSR Bengaluru Rajdhani Express

8.Train No.12213/14 KSR Bengaluru – Delhi Sarai Rohilla – KSR Bengaluru AC Duronto Express

9.Train No.22677/78 Yesvantpur – Kochuveli – Yesvantpur Superfast Express

10.Train No.12295/96 KSR Bengaluru – Danapur – KSR Bengaluru Sanghamitra Express

11.16583/84 Yesvantpur – Latur – Yesvantpur Express

12.16571/72 Yesvantpur -Bidar -Yesvantpur Express

13.12627/28 KSR Bengaluru – New Delhi – KSR Bengaluru Karnataka Express

14.12658/57 KSR Bengaluru -MGR Chennai Central – KSR Bengaluru Mail

15.16547/48 KSR Bengaluru -Danapur – KSR Bengaluru Clone Express

16.12291/92 Yesvantpur – MGR Chennai Central – Yesvantpur Express

17.16502/01 Yesvantpur – Ahmedabad – Yesvantpur Express

18.12251/52 Yesvantpur – Korba – Yesvantpur Express

19.12539/40 Yesvantpur – Lucknow – Yesvantpur Express

20.16565/66 Yesvantpur – Mangaluru Central – Yesvantpur Express

   Last four trains (indicated in S.No. 19&20) )have beenconverted to HOG in the month of Dec.2021.


                                                                                                  E. Vijaya

                                                                                  Chief Public Relations Officer                                                                                                     South Western Railway, Hubballi 






2
11-01-2022
NCR makes giant stride towards electrification

उत्‍तर मध्‍य रेलवे

जनसम्‍पर्क कार्यालय

उत्‍तर मध्‍य रेलवे,प्रयागराज

पत्रांक: 11पीआर/01/2022 प्रेस विज्ञप्तिदिनांक: 10.01.2022

NCR makes giant stride towards electrification

92% of NCR’s broad gauge network is now electrified

With the electrification of Shikohabad-Mainpuri section o­n 31st December, total electrified route km in NCR now stands at 2933

Electrification of 5 major routes completed in calendar year 2021.

Aggressively pursuing towards mission 100% electrification, NCR completed a total of 216 Route Kilometer & 314 Track Kilometer of electrification between April-December'2021.

Major routes which have been electrified during first three quarters of current financial year are:

Birlanagar-Udimor (101 km)

Mahoba-Khajuraho (64 km)

Shikohabad-Mainpuri (51 km)

In addition, newly laid double line between Chaunrah-Malasa (19 km), Nandkhas-Parauna (32 km) (both part of Bhimsen-Jhansi doubling project) and third line between Babina- Jhansi (24 km) are opened along with electrification.

At present, NCR has 2933 electrified Route Km and 6313 electrified track kilometers.

·Electrification works completed in NCR during calendar year 2021 are:

1.Bharatpur- Bandikui (97.5 km)

2.Bhandai- Etawah (114 km)

3.Mahoba-Khajuraho (64 km)

4.Birlanagar-Udimor (101 km)

5.Shikohabad-Manipuri (51km)

 

In addition to above major routes, electrification works of sidings like Chunar, Churk, Meja NTPC, Shankargarh have also been completed.

As a result of massive electrification, need for traction changing from AC engine to diesel engine is now done away at these places thereby reducing detentions and increasing mobility and punctuality.

With a total broad gauge network of 3222 route kilometers in NCR, electrified route km (2933) now stands at 91% of overall broad gauge network of NCR.

Electrification of remaining routes like Khajuraho-Udaipura, Barhan-Etah and Etawah-Mainpuri-Farrukhabad is targeted to be completed this year.

 






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit