For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








0 Trains from (RMM)RAMESWARAM to (MYS)MYSORE JN


Address: Rameshwaram Railway Station, Rameshwaram, Tamil Nadu 623526, India

Station Code: RMM

Station Name: RAMESWARAM

Zone: SR/Southern

Train Frequency Weekly: 93

Station Traffic: Medium

Address: Mysore Junction, Mysore, Karnataka, India

Station Code: MYS

Station Name: MYSORE JN

Zone: SWR/South Western

Train Frequency Weekly: 419

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
Since no Direct Trains Try Nearest Via Stations
Nearest From (RMM)RAMESWARAM
(mdu)madurai jn 150Kms from (RMM)RAMESWARAM
(vpt)virudunagar jn 153Kms from (RMM)RAMESWARAM
(cvp)kovilpatti 159Kms from (RMM)RAMESWARAM

Nearest From MYS
(ed)erode jn 162Kms from (MYS)MYSORE JN
(sa)salem jn 175Kms from (MYS)MYSORE JN
(jtj)jolarpettai 212Kms from (MYS)MYSORE JN
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
No.505/2019-2007-02-2020
Chennai
Thrust on Infra, Safety : Rail Doubling works in Southern Railway get a fillip in Budget 2020-21


Thrust o­n Infra, Safety : Rail Doubling works in Southern Railway get a fillip in Budget  2020-21

HIGHLIGHTS:

·Southern Railway has been granted an amount of Rs.3340 crore as budgetary allocation for the year 2020-2021 with a grant of Rs.1238 crore for doubling, Rs.175 crores towards gauge conversion ,  Rs.37 crores for traffic facilities and Rs.198 crores for passenger amenities.

·New projects at a cost of Rs. 4131 has been sanctioned towards doubling of Katpadi-Villupuram line, Salem-Karur-Dindigul line, Erode-Karur line and Chennai Beach- Chennai Egmore (4th line).  A sanction of Rs.280 crores for Chennai Beach – Chennai Egmore 4th line will help easing congestion in this section.

·With focus o­n Safety, for  elimination of level crossing gates an amount of Rs.880 crores have been sanctioned for new road over bridges and Road under bridges particularly o­n the Golden quadrilateral/diagonal routes (Chennai – Gudur/Chennai – Arakkonam – Renigunta).  This has the potential to increase the speed of trains.

·Replacement of Route relay interlocking (RRI) and A, B and C cabins at Jolarpettai has been allotted an outlay of Rs.6 crore.

·Provision of centralized traffic control in connection with modern train control system has been sanctioned at a cost of Rs.148 cr.  This will help in enhancing the line capacity and safety.

·Harnessing the benefits of technology for Safe train operations, provision of  indigenous train collision avoidance system o­n low density railway network has been sanctioned at a cost of Rs.468.9 cr.

·Under Passenger amenities head, a new work for an amount of Rs.150 crores towards minimum essential amenities with more focus o­n  facilities for divyangjan at stations across southern railway has been sanctioned. Rs.75 crores sanctioned towards soft upgrades at stations ( like improvement in station buildings, tall flags, steel benches, cover over platform, etc.)

 

1.Budgetary grant (BG) under various Plan heads

Plan Head

BG 2020-21 (In Rs.Crores)

11

New lines

     2.70

14

Gauge Conversion

175.18

15

Doubling

1238.10

including EBR (IF)

16

Traffic Facilities

 37.12

17

Computerisation

  7.03

21

Rolling Stock

106.59

29

Road Safety Work- Level Crossings

102.36

30

Road Safety Work-ROBs/RUBs

335.52

31

Track Renewals

      730.00

32

Bridge Works

        54.5

33

Signalling & Telecommunication works

105.06

36

Other Electrical work, incl. TRD

39.48

41

Machinery & Plant

         27.76

42

Workshop including PUs

55.04

51

Staff Welfare

63.96

53

Passenger Amenities

198.11

64

Other Specified work

53.34

65

Training/HRD

8.1

Grand Total

3340.00


2.Budget grant for some important o­ngoing work is as under:

Sl.No

Plan Head

Section

BG (In. Rs. Cr)

1.

New Line

Rameswaram-Dhanushkodi (17.2 Km)

    2.7       

2

Gauge Conversion

Mayiladuturai-Tiruvarur-Karaikudi   & Tiruturaipundi- Agastiyampalli

 (47.2 Km including Mannargudi-Needamangalam-Mannargudi-Pattukottai Line)

100.00

Madurai-Bodinayakkanur (90.41 Km)

  75.18

3.

Doubling

Chengalpattu-Villupuram (103 Km): Tambaram-Chengalpattu-3rd line by GC of existing MG line alongwith electrification (30Km)

 132.00

Kurruppanthura-Chingavanam

(26.54 km)

 88.00

Ambalapuzha-Haripad (18.13 km)

 13.95

Omalur-Metur dam- With electrification (29.03 km)

 56.85

Trivandrum-Kanyakumari (86.56 km)

133.5

Madurai-Maniyachi-Tuticorin (160 Km)

367.00

Maniyachi-Nagercoil (102 Km)

345.00

Netravati-Mangalore Central (1.5 Km)

  10.7

Salem-Magnesite-Omalur (11 Km)

  22.00

4

Traffic Facilities

Mangalore Central- Addl Platform lines

   3.00

3.Importance New Works sanctioned are as under:

Sl.No

P.Book item no.

Works

Sanctioned Cost (In Rs.Cr)

Doubling

1.

38

Katpadi-Villupuram (160.10 Km)

1601

2.

39

Salem-Karur-Dingigul (160 Km)

1600

3.

40

Erode-Karur (65 km)

  650

4.

41

Chennai Beach- Chennai Egmore (4.3 km)

  280

  Total (a)

4131

Traffic Facilities

1.

60

SR- Yard modification to improve speed, intermediate block hut and development of new coaching terminal (b)

22.51

Road Safety Works- Level Crossings

1.

101

SR-Engineering work at LCs (c )

20

Road Safety works- ROB/RUBs

1.

401

SR- ROB/RUB o­n Golden quadrilateral/diagonal routes

480

2
491/2019-20 31-01-2020
Chennai
UPGRADATION IN COMPOSITION OF TRAINS


One Sleeper Class Coach in Train No. 16336/ 16335  Nagercoil - Gandhidham –Nagercoil  Express will be replaced with o­ne AC Three tier coach Ex. Nagercoil from 11.02.2020 and Ex Gandhidham from 14.02.2020

One Sleeper Class Coach in Train No. 16733 / 16734 Rameshwaram - OKHA Port- Rameshwaram Express will be replaced with o­ne AC Three Tier coachEx Rameshwaram from 13.03.2020 and Ex OKHA Port from 17.03.2020.

One Sleeper Class Coach in Train No.12659/12660 Nagercoil - Shalimar – Nagercoil Gurudev Express will be replaced with o­ne AC Three Tier coach Ex Rameswaram from 08.03.2020 and Ex Shalimar from 11.03.2020

One Sleeper Class Coach in Train No.16359/16360 Ernakulam – Patna –Ernakulam Express will be replaced with  o­ne AC Three Tier coach  Ex Ernakulam from 14.03.2020 and Ex Patna Junction from 17.03.2020.

One Sleeper Class Coach in Train No.12647/12648 Coimbatore - Nizamuddin – Coimbatore Kongu Superfast Express will be replaced with o­ne AC Three Tier coach Ex Coimbatore from 09.02.2020 and Ex Nizamuddin from 12.02.2020

One Sleeper Class Coach in Train No.12682/12681 Coimbatore  - Dr MGR Chennai Central – Coimbatore Express will be replaced with o­ne AC Three Tier coach Ex Coimbatore from 14.02.2020 and Puratchi Thalaivar Dr. M.G. Ramachandran Central Railway Station from 15.02.2020


Follow us

www.sr.indianrailways.gov.in

https://twitter.com/GMSRailway

https://www.faceook.com/Southern-Railway-240606622749869



(D. Om Prakash Narayan)
Sr.PRO





COMMENTS

1
Shiva- Fri Aug 19 22:17 2016
Mysore to ramiasvarm how much cost

2
B. K. Nagendran. - Thu Apr 6 19:12 2017
Iwant to travel to rameshwaram from mysore and then to kanyakumari and back to mysor. I am a handcap person and my daughter is accompaning me with her 8 yr son. Pl help me in this regard with train fare and other details.


Add Comment






Submit