For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








0 Trains from (nba)nabha to (jind)jind jn


Address: Railway Station Nabha, Nabha, Punjab 147201, India

Station Code: NBA

Station Name: NABHA

Zone: NR/Northern

Train Frequency Weekly: 117

Station Traffic: Medium

Address: Jind, Haryana, India

Station Code: JIND

Station Name: JIND JN

Zone: NR/Northern

Train Frequency Weekly: 345

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
Since no Direct Trains Try Nearest Via Stations
Nearest From (nba)nabha
(nba)nabha 0Kms from (nba)nabha
(pta)patiala 25Kms from (nba)nabha
(dui)dhuri jn 27Kms from (nba)nabha

Nearest From jind
(jind)jind jn 0Kms from (jind)jind jn
(uca)uchana 18Kms from (jind)jind jn
(jna)julana 26Kms from (jind)jind jn
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
2023/05/2323-05-2023
General Manager reviews monsoon preparations - Central Railway gears up with monsoon preparations


General Manager reviews monsoon preparations

Central Railway gears up with monsoon preparations

Shri Naresh Lalwani, General Manager, Central Railway reviewed the monsoon preparations of Central Railway. Shri Alok Singh, Additional General Manager, Central Railway, Shri Rajnish Kumar Goyal, Divisional Railway Manager, Mumbai Division and Principal Head of Departments of civil engg, electrical, signalling  were also present.

The details of measures taken for ensuring uninterrupted services are as under-

1)More Water Pumps

24 vulnerable locations identified. 166 pumps will be provided at these locations. Railways will be providing 120 High Power pumps, 15 Normal pumps and Municipal Corporation of Greater Mumbai will be providing the balance 31 pumps. This year the capacity of pumps and nos. of pumps have been increased between 12.5 HP to 100 HP.  The locations identified o­n main line are Masjid, Mazgaon yard, Byculla, Chinchpokli, Currey Road, Parel, Dadar, Matunga, Sion, Kurla, Vikhroli, Kanjurmarg, Bhandup, Mulund and o­n Harbour line are Sewri, Vadala, Guru Tegh Bahadur Nagar, Chunabhatti, Tilak Nagar etc.

2)Micro tunnelling-

Micro tunnelling has been provided at 8 locations such as Masjid, Sandhurst Road, Dadar-Parel area, Matunga-Sion area, Kurla Car Shed, Tilak Nagar nallah, Diva and Kalva. Micro tunneling work is in progress at 2 new locations in Thane-Kalva and Kalva-Mumbra section.

3)Desilting of drains-

Central Railway has targeted de-silting and cleaning of 118.48 kms of drains o­n its suburban section of which, work has been completed for 102.39 kms and work is presently in progress o­n cleaning of another 16 kms of drains.

4)Cleaning of culverts-

CR has cleaned 88 culverts o­n its suburban sections, and work is presently in progress o­n cleaning of 17 more culverts. Culvert Augmentation work by insertion of RCC box done at Kurla-Trombay area, Chunabhatti, Wadala Road, Vidyavihar-LTT area and Tilak Nagar.

5)Trimming of Trees-

Work of cutting and trimming of 43 trees has been done and work is in progress of 23 trees.

6)Muck removal-

Central Railway has set a target of cleaning and removal of 62,000 cubic meters of muck o­n Main lines.

7)Lifting of tracks-

47.8 km track lifting planned, it will be completed till next month.

     8) Works done in Ghat Section-

         -45 meters of Tunnel Portal

         -300 mts of Rockfall Barrier

         -500 sq mts of Boulder Netting

         -40 mts of Canadian Fencing

         -160 mts of Stabilization of banks

         -tunnel sounding- 18 locations

9)Separate pumps will be provided for RUBs- at 14 locations.

10)Reserve boulders and stone dust kept ready in case of unusuals- 7300 cubic meter boulders and 3500 cubic meter sand dust/gravel will be kept ready as reserve.

11)Other Important works in progress-

·Pre-monsoon water proof cable meggering- almost 83% work completed, balance will be completed in 1 week.

·Provision of CCTVs and telephones at 31 Static Watchman Hut in ghat sections.

·Waterproof point motor machines provided at- 277 locations.

·AWS (Auxillary warning system) magnets sealing work for 1506 locations will be completed in this month.

·Installation of flood gates at Masjid, Byculla, Matunga and Sion-Kurla areas.

·Bunter Bhavan nallah at LTT to be connected by removing encroachments.

·Karve nagar nallah improvement work to be done by MCGM and cost to be recovered from Ajmera builders.

·Appointment of consultant for work of clearing of concrete deposited below water mains at Priyadarshini, Chunabhatti.

12)OHE- overhead wire- thermographic checking completed at 1239 track KMs. Thermo vision camera checking of conductor and other parts of OHE is completed.

13)24X7 Control Room- CR Control office, working round the clock, will keep close liaison with Meteorological Department, Disaster Management cell and staff deputed at flood prone areas for continuous monitoring and constant updates.

14)Hourly monitoring- of rainfall and water level above track is taken by control office from field staff during monsoon period.

15)Close coordination with state govt, BMC, TMC, NMMC- Regular meetings conducted between railways and state officials, till now 4 meetings done with municipal commissioner/AMC/Chief engineer. A hotline also created between railways and MCGM disaster cell, TMC, NMMC.

--- --- ---

Date: May 23, 2023

PR No. 2023/05/23

This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai



(Shivraj Manaspure)
Chief Public Relations Officer




2
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.30/2023-2427-04-2023
Secunderabad
PR No. 30 - National-level meeting between Indian Railways & Cement Industry officials held in Secunderabad

·Officials from Railway Board, SCR and Other Zonal Railways also participated in the meeting.

·Representatives from leading Cement Manufactures also participated in the meeting.

A national level meeting of Officials from Indian Railways &representatives from Cement Industry was organised today i.e., o­n Saturday 22nd April 2023 at Hotel ITC Kakatiya. The meeting was organised by Cement Manufacturers association.Shri. Manoj Kumar Srivastava, Principal Executive director, Traffic transportation and Shri.KamleshkumarMishra , Executive director, Business development participated from Railway Board, New Delhi. Shri.Raveen Kumar Reddy, Principal Chief Commercial Manager, Shri. B Nagya, Principal Chief Operations Manager, South Central Railway along with other team of officials from Railway Board, SCR, Western railway and CONCOR also participated in this meeting.

 Representatives from Various cement industries such as Ultra tech, Vasavadatta Cements, My Home, Bharati, Penna, Dalmia, Orient, Jindal etcparticipated in the meeting from the Cement Industry. During the meeting various issues related to the cement sector such as infrastructural requirements for future growth, policy interventions to aid cement transportation and other relevant issues for improving the rail coefficient and logistics were discussed to furrher assist the Cement industry to transport their commodities through railways.

 In this regard, it may be mentioned that, during the last financial year, Indian Railways registered 144 Million Tonnes of Cement & Clinker loading. Similarly, South Central Railways, o­ne of the leading Zones in the transportation of Cement by Railways, achieved 34.499 MTs of cement loading in 2022-23 against 34.108 MTs in 2021-22. Incidentally, the last year’s cement loading of SCR is also the best-ever Originating loading achieved by the Zone in Cement & Clinker.

 Indian Railways, including SCR, have been implementing various Tariff and Non-Tariff measures in the recent past to improve the Cement transportation by Railways. Business Development Units have been formed at both the Zonal and Divisional Levels to not o­nly strengthen existing traffic but also open loading points. In this context, today’s meeting was another significant step to getting the views of the industry to further strengthen cement loading by Railways.TheCement manufacturers Association gave presentations regarding the growth of cement sector, the overall logistics scenario, the volumes expected in the near future due to growth ininstalled capacities of various plants and role of railways as a strategic partner for cement industry among others. Policy support in this regard was also discussed during the meeting. The senior officers from Railway Board and the South Central Railway assured cooperation for the growing cement sector and also outlined various infrastructural projects in the offing and measures taken to help the cement sector.