For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








1 Trains from (UMB)AMBALA CANT JN to (HTE)HATIA


Address: Ambala Cantt Railway Station, Grand Trunk Road, Ambala Cantt, Haryana 133001, India

Station Code: UMB

Station Name: AMBALA CANT JN

Zone: NR/Northern

Train Frequency Weekly: 1075

Station Traffic: High

Address: Hatia Railway Station, Maharatoli, Ranchi, Jharkhand, India

Station Code: HTE

Station Name: HATIA

Zone: SER/South Eastern

Train Frequency Weekly: 194

Station Traffic: High





Trains
To Check Ticket Availibility Click Classes
TrainTrain NameFromDepToArrTimeDaysClassesStatus
18310JAT SBP EXPUMB00:40HTE10:0533:25M,TU,W,TH,F,SA,SU3A,SL,GN,18310 Status
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
No.505/2019-2007-02-2020
Chennai
Thrust on Infra, Safety : Rail Doubling works in Southern Railway get a fillip in Budget 2020-21


Thrust o­n Infra, Safety : Rail Doubling works in Southern Railway get a fillip in Budget  2020-21

HIGHLIGHTS:

·Southern Railway has been granted an amount of Rs.3340 crore as budgetary allocation for the year 2020-2021 with a grant of Rs.1238 crore for doubling, Rs.175 crores towards gauge conversion ,  Rs.37 crores for traffic facilities and Rs.198 crores for passenger amenities.

·New projects at a cost of Rs. 4131 has been sanctioned towards doubling of Katpadi-Villupuram line, Salem-Karur-Dindigul line, Erode-Karur line and Chennai Beach- Chennai Egmore (4th line).  A sanction of Rs.280 crores for Chennai Beach – Chennai Egmore 4th line will help easing congestion in this section.

·With focus o­n Safety, for  elimination of level crossing gates an amount of Rs.880 crores have been sanctioned for new road over bridges and Road under bridges particularly o­n the Golden quadrilateral/diagonal routes (Chennai – Gudur/Chennai – Arakkonam – Renigunta).  This has the potential to increase the speed of trains.

·Replacement of Route relay interlocking (RRI) and A, B and C cabins at Jolarpettai has been allotted an outlay of Rs.6 crore.

·Provision of centralized traffic control in connection with modern train control system has been sanctioned at a cost of Rs.148 cr.  This will help in enhancing the line capacity and safety.

·Harnessing the benefits of technology for Safe train operations, provision of  indigenous train collision avoidance system o­n low density railway network has been sanctioned at a cost of Rs.468.9 cr.

·Under Passenger amenities head, a new work for an amount of Rs.150 crores towards minimum essential amenities with more focus o­n  facilities for divyangjan at stations across southern railway has been sanctioned. Rs.75 crores sanctioned towards soft upgrades at stations ( like improvement in station buildings, tall flags, steel benches, cover over platform, etc.)

 

1.Budgetary grant (BG) under various Plan heads

Plan Head

BG 2020-21 (In Rs.Crores)

11

New lines

     2.70

14

Gauge Conversion

175.18

15

Doubling

1238.10

including EBR (IF)

16

Traffic Facilities

 37.12

17

Computerisation

  7.03

21

Rolling Stock

106.59

29

Road Safety Work- Level Crossings

102.36

30

Road Safety Work-ROBs/RUBs

335.52

31

Track Renewals

      730.00

32

Bridge Works

        54.5

33

Signalling & Telecommunication works

105.06

36

Other Electrical work, incl. TRD

39.48

41

Machinery & Plant

         27.76

42

Workshop including PUs

55.04

51

Staff Welfare

63.96

53

Passenger Amenities

198.11

64

Other Specified work

53.34

65

Training/HRD

8.1

Grand Total

3340.00


2.Budget grant for some important o­ngoing work is as under:

Sl.No

Plan Head

Section

BG (In. Rs. Cr)

1.

New Line

Rameswaram-Dhanushkodi (17.2 Km)

    2.7       

2

Gauge Conversion

Mayiladuturai-Tiruvarur-Karaikudi   & Tiruturaipundi- Agastiyampalli

 (47.2 Km including Mannargudi-Needamangalam-Mannargudi-Pattukottai Line)

100.00

Madurai-Bodinayakkanur (90.41 Km)

  75.18

3.

Doubling

Chengalpattu-Villupuram (103 Km): Tambaram-Chengalpattu-3rd line by GC of existing MG line alongwith electrification (30Km)

 132.00

Kurruppanthura-Chingavanam

(26.54 km)

 88.00

Ambalapuzha-Haripad (18.13 km)

 13.95

Omalur-Metur dam- With electrification (29.03 km)

 56.85

Trivandrum-Kanyakumari (86.56 km)

133.5

Madurai-Maniyachi-Tuticorin (160 Km)

367.00

Maniyachi-Nagercoil (102 Km)

345.00

Netravati-Mangalore Central (1.5 Km)

  10.7

Salem-Magnesite-Omalur (11 Km)

  22.00

4

Traffic Facilities

Mangalore Central- Addl Platform lines

   3.00

3.Importance New Works sanctioned are as under:

Sl.No

P.Book item no.

Works

Sanctioned Cost (In Rs.Cr)

Doubling

1.

38

Katpadi-Villupuram (160.10 Km)

1601

2.

39

Salem-Karur-Dingigul (160 Km)

1600

3.

40

Erode-Karur (65 km)

  650

4.

41

Chennai Beach- Chennai Egmore (4.3 km)

  280

  Total (a)

4131

Traffic Facilities

1.

60

SR- Yard modification to improve speed, intermediate block hut and development of new coaching terminal (b)

22.51

Road Safety Works- Level Crossings

1.

101

SR-Engineering work at LCs (c )

20

Road Safety works- ROB/RUBs

1.

401

SR- ROB/RUB o­n Golden quadrilateral/diagonal routes

480

2
06-02-2020
HIGHLIGHTS OF BUDGET GRANT OF DIFFERENT PLAN HEADS OVER SOUTH EASTERN RAILWAY

दक्षिणपूर्वरेलवे

SOUTH EASTERN RAILWAY

प्रेसविज्ञप्तिPRESS RELEASE

 

 

HIGHLIGHTS OF BUDGET GRANT OF DIFFERENT

PLAN HEADS OVER SOUTH EASTERN RAILWAY

 

Kolkata, 6th February, 2020:

 

 

South Eastern Railway is o­ne of the leading zonal railways which contributes major share to Indian Railways’ earnings. For SER’s infrastructural development and o­ngoing projects & works, a gross amount of Rs.5401 crores including Extra Budgetary Resources (EBR) has been allotted in the Budget of 2020-21.

 

In the major Plan Head, the following amount has been allotted for the financial year 2020-21 through budget grant:

 

ØFor the Doubling Projects an amount of Rs.993.00 crores has been granted

ØFor Level Crossings related to road safety an amount ofRs.42.86 crores has been granted

ØFor Road Over Bridges & Road Under Bridges an amount of Rs.248.59 crores has been granted

ØFor Track Renewal works an amount of Rs.840 crores has been granted

ØFor Bridge Works an amount of Rs.33 crores has been granted

ØFor Passenger Amenities an amount of Rs.151.83 crores has been granted

ØFor Staff Welfare an amount of Rs.39.29 crores has been granted

 

Apart from the above, following New Works have been sanctioned for better connectivity and smooth operations in SER jurisdiction along with other o­ngoing developmental works.

 

ØKiriburu-Barbil (24.5 KM) New Line at an estimated cost of Rs.705.17 crores

ØBhojudih-Talgoria (12.5 KM) Doublingat an estimated cost of Rs.129 crores

ØMuri-Barkakana (58 KM) Doubling at an estimated cost of Rs.580 crores

ØRourkela-Bondamunda A Cabin 5th Line (10 KM) at an estimated cost of Rs.169.65 crores

 

Budgetary allotment of some major of the o­ngoing projects:

 

Plan Head

 

Name of the Project

Length

(KM)

Budget Allotment 2020-21 (Rs. In Crores)

 

 

 

 

 

Doubling/

3rd Line

Kharagpur-Adityapur 3rd Line

132

310

Kharagpur-Narayangarh 3rd Line

20

40

Monohar-Bondamunda 3rd Line

30

35

Rourkela-Jharsuguda 3rd Line

101

170

Bondamunda-Ranchi Doubling

158.5

199.79

Narayangarh-Bhadrak 3rd Line

155

50

Bondamunda-Rourkela 4th Line

9.3

23

Dumetra-Link C Line – Connection with Bisra Station

2.3

23

Lodhma-Piska Link Line bypassing Hatia/Ranchi

17.2

16

Talgoria-Bokaro N Cabin Doubling

38

51

Purulia-Kotshila Doubling

36

10

 

Electrification

Rupsa-Bangriposi

89

20

Bankura-Masagram

118

30

Tatanagar-Badampahar

89

20

 

 

***********






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit