For a Proper experience on Trainspy.com, enable JavaScript in your browser

Train Search








0 Trains from (UBC)AMBALA CITY to (DWK)DWARKA


Address: Ambala City, Haryana 134001, India

Station Code: UBC

Station Name: AMBALA CITY

Zone: NR/Northern

Train Frequency Weekly: 371

Station Traffic: High

Address: Dwaraka Railway Station, Dwarka, Gujarat 361335, India

Station Code: DWK

Station Name: DWARKA

Zone: WR/Western

Train Frequency Weekly: 87

Station Traffic: Medium





Trains
To Check Ticket Availibility Click Classes
Since no Direct Trains Try Nearest Via Stations
Nearest From (UBC)AMBALA CITY
(dbd)deoband 118Kms from (UBC)AMBALA CITY
(rk)roorkee 122Kms from (UBC)AMBALA CITY
(moz)muzaffarnagar 137Kms from (UBC)AMBALA CITY

Nearest From DWK
(st)surat 416Kms from (DWK)DWARKA
(bh)bharuch jn 420Kms from (DWK)DWARKA
(nvs)navsari 432Kms from (DWK)DWARKA
Train Type Train Table Info
SuperFast
Click On Function
Headers Sort-
Background Colour Code
Train No Detail Information About Train on new tab
Train Name Route Time Table & Fare of Train 
From & To Detail Information About Station on new tab
Classes Ticket Availibility
Mail/Express
Rajdhani
Shatabdi
Janshatabdi
Garibrath/Yuva
Duronto
Spl Tourism Trains






RECENT NEWS

1
No.505/2019-2007-02-2020
Chennai
Thrust on Infra, Safety : Rail Doubling works in Southern Railway get a fillip in Budget 2020-21


Thrust o­n Infra, Safety : Rail Doubling works in Southern Railway get a fillip in Budget  2020-21

HIGHLIGHTS:

·Southern Railway has been granted an amount of Rs.3340 crore as budgetary allocation for the year 2020-2021 with a grant of Rs.1238 crore for doubling, Rs.175 crores towards gauge conversion ,  Rs.37 crores for traffic facilities and Rs.198 crores for passenger amenities.

·New projects at a cost of Rs. 4131 has been sanctioned towards doubling of Katpadi-Villupuram line, Salem-Karur-Dindigul line, Erode-Karur line and Chennai Beach- Chennai Egmore (4th line).  A sanction of Rs.280 crores for Chennai Beach – Chennai Egmore 4th line will help easing congestion in this section.

·With focus o­n Safety, for  elimination of level crossing gates an amount of Rs.880 crores have been sanctioned for new road over bridges and Road under bridges particularly o­n the Golden quadrilateral/diagonal routes (Chennai – Gudur/Chennai – Arakkonam – Renigunta).  This has the potential to increase the speed of trains.

·Replacement of Route relay interlocking (RRI) and A, B and C cabins at Jolarpettai has been allotted an outlay of Rs.6 crore.

·Provision of centralized traffic control in connection with modern train control system has been sanctioned at a cost of Rs.148 cr.  This will help in enhancing the line capacity and safety.

·Harnessing the benefits of technology for Safe train operations, provision of  indigenous train collision avoidance system o­n low density railway network has been sanctioned at a cost of Rs.468.9 cr.

·Under Passenger amenities head, a new work for an amount of Rs.150 crores towards minimum essential amenities with more focus o­n  facilities for divyangjan at stations across southern railway has been sanctioned. Rs.75 crores sanctioned towards soft upgrades at stations ( like improvement in station buildings, tall flags, steel benches, cover over platform, etc.)

 

1.Budgetary grant (BG) under various Plan heads

Plan Head

BG 2020-21 (In Rs.Crores)

11

New lines

     2.70

14

Gauge Conversion

175.18

15

Doubling

1238.10

including EBR (IF)

16

Traffic Facilities

 37.12

17

Computerisation

  7.03

21

Rolling Stock

106.59

29

Road Safety Work- Level Crossings

102.36

30

Road Safety Work-ROBs/RUBs

335.52

31

Track Renewals

      730.00

32

Bridge Works

        54.5

33

Signalling & Telecommunication works

105.06

36

Other Electrical work, incl. TRD

39.48

41

Machinery & Plant

         27.76

42

Workshop including PUs

55.04

51

Staff Welfare

63.96

53

Passenger Amenities

198.11

64

Other Specified work

53.34

65

Training/HRD

8.1

Grand Total

3340.00


2.Budget grant for some important o­ngoing work is as under:

Sl.No

Plan Head

Section

BG (In. Rs. Cr)

1.

New Line

Rameswaram-Dhanushkodi (17.2 Km)

    2.7       

2

Gauge Conversion

Mayiladuturai-Tiruvarur-Karaikudi   & Tiruturaipundi- Agastiyampalli

 (47.2 Km including Mannargudi-Needamangalam-Mannargudi-Pattukottai Line)

100.00

Madurai-Bodinayakkanur (90.41 Km)

  75.18

3.

Doubling

Chengalpattu-Villupuram (103 Km): Tambaram-Chengalpattu-3rd line by GC of existing MG line alongwith electrification (30Km)

 132.00

Kurruppanthura-Chingavanam

(26.54 km)

 88.00

Ambalapuzha-Haripad (18.13 km)

 13.95

Omalur-Metur dam- With electrification (29.03 km)

 56.85

Trivandrum-Kanyakumari (86.56 km)

133.5

Madurai-Maniyachi-Tuticorin (160 Km)

367.00

Maniyachi-Nagercoil (102 Km)

345.00

Netravati-Mangalore Central (1.5 Km)

  10.7

Salem-Magnesite-Omalur (11 Km)

  22.00

4

Traffic Facilities

Mangalore Central- Addl Platform lines

   3.00

3.Importance New Works sanctioned are as under:

Sl.No

P.Book item no.

Works

Sanctioned Cost (In Rs.Cr)

Doubling

1.

38

Katpadi-Villupuram (160.10 Km)

1601

2.

39

Salem-Karur-Dingigul (160 Km)

1600

3.

40

Erode-Karur (65 km)

  650

4.

41

Chennai Beach- Chennai Egmore (4.3 km)

  280

  Total (a)

4131

Traffic Facilities

1.

60

SR- Yard modification to improve speed, intermediate block hut and development of new coaching terminal (b)

22.51

Road Safety Works- Level Crossings

1.

101

SR-Engineering work at LCs (c )

20

Road Safety works- ROB/RUBs

1.

401

SR- ROB/RUB o­n Golden quadrilateral/diagonal routes

480

2
04-02-2020
Extension of Temporary Cancellation/ Short Termination/ Short Origination / Partial Cancellation of Trains Due To Traffic Block between Raiwala – Rishikesh Stations on Moradabad Division .

मुरादाबाद मंडल के रायवाला-ऋषिकेश रेलवे स्टेशनों के बीच

यातायात ब्लॉक के कारण रेलगाड़ियां आंशिक रूप से प्रभावित

वीरभद्र-नया ऋषिकेश रेल सेक्शन के वीरभद्र यार्ड की रि-मॉडलिंग और कमीशनिंग के लिए अधिसूचित यात्री ब्लॉक को 19.2.2020 तक बढ़ा दिया गया है । परिणामस्वरूप निम्नलिखित रेलगाड़ियां निम्नानुसार आंशिक रूप से प्रभावित रहेंगी:-

In connection with remodeling of Virbhadra Yard and commissioning of Virbhadra-New Rishikesh section , the earlier notified traffic block period has been extended upto 19.02.2020. Consequently, the following trains will remain temporarily cancelled/ short terminated / short originated  /partially cancelledas under:

CancellationofTrains During Blockब्लॉक के दौरान निरस्त रहने वाली रेलगाड़ियां

Train No. & Name रेलगाड़ी का नम्बर व नाम

Date of Cancellation

तक निरस्त

(from originating station)

24888/24887Ambala Cantt.-Rishikesh-Ambala Cantt. Lnik Exp.

Upto 19.02.2020

54481/54482Haridwar-Rishikesh-Haridwar Passenger

Upto 19.02.2020

54483/54486Haridwar-Rishikesh-Haridwar Passenger

Upto 19.02.2020

Short Termination/Origination/Partial Cancellation of Trains ब्लॉक के दौरान आंशिक रूप से निरस्त रहने वाली रेलगाड़ियां

Train No. & Train Name

रेलगाड़ी का नम्बर व नाम

Train to short terminate at/originate from पर यात्रा समाप्त/से प्रारम्भ

Train Partially Cancelled between Stations

के बीच आंशिक रूप से रद्द

Date from originating station

प्रभावी तिथि

14609 Rishikesh-Shri Mata Vaishno Devi Katra Hemkunt Exp.

 

At/From Haridwar

Haridwar-Rishikesh

Upto 19.02.2020

तक

14610 Sh Mata Vaishno Devi Katra-RishikeshHemkunt Exp.

 

At/From Haridwar

Haridwar-Rishikesh

Upto 18.02.2020

तक

54471 Delhi Jn.-RishikeshPassenger

At/From Haridwar

Haridwar-Rishikesh

Upto 18.02.2020

54463/54464 Chandausi-Rishikesh-Chandausi Passenger

At/From Haridwar

Haridwar-Rishikesh

Upto 19.02.2020

तक

--------------------






COMMENTS

NO Comments. Be the first to Comment...

Add Comment






Submit